| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.1 LAccepted-AOC 210 1 C ARIYAMANGALAM CORPORATION ROAD JEGANATHAPURAM TIRUCHIRAPPALLI TAMIL NADU 620010 | TIRUCHIRAPPALLI | TAMIL NADU | 620010 | L1 | Accepted-AOC L1 | |
| 2 | L2₹10.6 L+₹78,266 (7.98%)Rejected-Finance 134 1 SAKTHI THEATER STREET NEHRU NAGAR KARUMALAIKOODAL METTUR DAM 02 | METTUR DAM | TAMIL NADU | L2 | Rejected-Finance L2 |
Tender Value
Refer Docs
EMD Value
₹9,300
Closing Date
19 Jun 2024, 2:00 pmClosed
CE / MTPS - II
O/o CE / MTPS - II
Inspection Overhauling of HP Bypass control valve, LP Bypass control valve A Isolation valve and Injection control valve of LP Bypass Bduring Annual Overhauling 2024
2024_EB_453927_1
OT 20/24-25
Open Tender
Miscellaneous Works
Works
30 days
O/o SE/ES/MTPS2
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹9,300
Yes
8 Aug 2024
12 Jun 2024
20 Jun 2024
12 Jun 2024
19 Jun 2024
12 Jun 2024
Amount
Preparing scaffolding arrangement for Valve overhauling (HP Bypass control Valve/LP Bypass control valve 'A': Charges for providing the scaffolding arrangement at 15 meter elevation at HP Bypass main Valve including the cost of consumables & T&P’S.
Dismantling and assembling of the Complete Hydraulic actuator assembly. Charges for Moving the Piston into the bottom end position, Releasing of oil pressure from oil system, Disconnecting all connector and Hydraulic hoses from actuator, Removal of coupling locker & feedback linkage on coupling, Decoupling the piston rod from valve stem, Loosening and removing screw connection Actuator Yoke – Valve and lifting of the actuator from the valve by using the special fixture, Removing the complete Actuator unit from the HP Bypass control valve by using the special fixture and re assembling including the cost of consumables & T&P’S.
Dismantling the HP Bypass control valve/LP Bypass control valve 'A': Charges for removing of spray water pipe, loosening and removing of HSB Cap screw, Removing of bearing carrier, nozzle body etc., Removing of Bonnet Nozzle body, jet cage, seat ring etc., by using gas heating machine as per requirement, Removing of valve stem and cleaning of all parts by solvent & Inspection of stem, valve body assembly and other parts Dye penetration test for any defect including the cost of consumables and T&P’s.
Overhauling of HP Bypass control valve & LP Bypass control valve 'A': Charges for Repairing/ replacement of the Worn-out/damaged parts of the HP Bypass valve/LP Bypass Valve, Rectification of defects in valve stem and seat reconditioning with suitable welding electrodes by in-situ grinding & lapping using in-situ lapping machine and lapping disc, machining of seat with old/new stem, Lapping of valve stem with body seat to achieve contact blue matching including the cost of consumables and T&P’s.
Re assembling of HP Bypass control valve: Charges for Re-Assembling of all the parts in the correct sequence with new graphite gland packing ring, Spring stack and gland packing rings with metal end cap etc., including the cost of consumables and T&P’s.
Re assembling of LP Bypass control valve 'A': Charges for Re-Assembling of all the parts in the correct sequence with new graphite gland packing ring, Disc spring/Bottom ring and gland packing rings with metal end cap etc., including the cost of consumables and T&P’s.
Overhauling and Servicing of Isolation valve and Injection control valve of LP Bypass 'B: a. Dismantling of Isolation valve and Injection control valve: Charges for loosening and removing of HSB Cap screw, Removing of bearing carrier, nozzle body etc., Removing of Bonnet Nozzle body, seat ring etc., by using gas heating machine as per requirement, Removing of valve stem and cleaning of all parts by solvent & Inspection of stem, valve body, bonnet, cage, plug assembly and other parts Dye penetration test for any defect including the cost of consumables and T&P’s.
b.Overhauling and reassembling of Isolation valve and Injection control valve of LP Bypass 'B' Charges for Repairing/replacement of the wornout/damaged parts of LP Bypass Spray control valve and Re-Assembling of all the parts in the correct sequence with new soft goods such as stem packing, gaskets and balance including the cost of consumables and T&P’s.
Natesan Engineering Contractor
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .