Loading…
Loading…
Tender Value
₹19.3 L
EMD Value
₹38,580
Closing Date
26 Aug 2026, 2:30 pmDue tomorrow
Executive Engineer
Siliguri
7th Mile Takdah to Glenburn Fatak Road Emergent Repairing of potholes followed by premix carpet and seal coat from Ch. 0.00 Kmp to 6.00 Kmp in stretches under Darjeeling Highway Division in the District of Darjeeling during the year 2026-27
2026_WBPWD_5018030_1
EE/DHD/NIT/06/2026-27
Open Tender
CIVIL WORKS
Percentage
30 days
Takdah
Please find the attachment
4 documents required · 4 mandatory
₹38,580
Yes
7 Aug 2026
7 Aug 2026
28 Aug 2026
7 Aug 2026
26 Aug 2026
12 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Tack Coat
Providing and applying tack coat with Cationic bitumen emulsion (RS1) complying with IS:8887 using emulsion pressure distributor on
the prepared bituminous/granular /cement concrete pavement surface cleaned with mechanical broom and high pressure air jet (Reference to MORT&H's specification clause 503). i)On bituminous surface @ 0.20kg-0.3kg /sqm. | 2,273.38 | m3 | 25.12 | ₹57,107.31 |
| 2 | Repairing Pot-holes with Bituminous Macadam
(Grading - II, for compacted thickness of upto
75mm)
Filling Pot Holes with Bituminous Macadam using
Mobile Hot Mix plant (6-10 TPH) with approved
crushed aggregates of specified grading
premixed with bituminous binder @3.4% by wt.
of the total mix, transported to site and laid in
the pot hole prepared before hand by cutting
the edges to get a firm vertical face and by
removing all the failed and loose materials
including dust and applying tack coat evenly on
the sides and on the surface as per
specification, rolling the filled depression with 8-10 tonne smooth wheeled roller to
achieve the desired compaction, including the
cost and carriage of stone aggregates and
bitumen, hire charges of machinery and
equipment, cost of fuel and lubricants and
wages of all operational staff, quality control
except the cost of tack coat complete as per
direction of Engineer-in-charge. Payment to be
made on the basis of the loose net volume of
the stone aggregates used in the work.
using Pakur Variety | 77.35 | m3 | 14,577.87 | ₹11,27,598.24 |
| 3 | Open - Graded Premix Surfacing
Providing, laying and rolling of open - graded premix surfacing of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using viscosity grade bitumen of approved grade to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a smooth wheeled tandem or other approved type roller 8-10 tonne
capacity, finished to required level and grades (Reference to MORT&H's specification clause 510).
Case - I: Mechanical method using approved grade Bitumen and HMP
of appropriate capacity not less than 75 tonnes/hour . | 1,136.69 | m3 | 292.48 | ₹3,32,459.09 |
| 4 | Providing and laying seal coat
sealing the voids in a bituminous
surface laid to the specified levels,
grade and cross fall using. Type A
and B seal coats (Reference to
MORT&H's specification clause 511)
Case - II : Type B
Providing and laying of premix sand
seal coat with HMP using approved
crushed stone chipping and
viscosity grade paving bitumen of
suitable approved grade. | 1,136.69 | m2 | 103.43 | ₹1,17,567.85 |
| 7 | Add GST @18% | - | GST | 0.18 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.18 MB
Tendernotice_2.pdf
PDF • 1.87 MB
BOQ_5088656.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].