| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L2₹9.8 L+₹5,000.42 (0.51%)Accepted-AOC | L2 | Accepted-AOC Admitted | |
| 2 | L1₹9.8 LRejected-AOC | L1 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | V Vediyappan L1 | Alagesan Contractor L2 |
|---|---|---|---|---|---|
| 1.00Providing Attached Toilet room to Exsiting Hostel Room No. 101, 102, 103, 104, 105, 106, 107, 108, 109, 110, 111, 112 & 113 at RIRD campus in Krishnagiri Dam- Rs. 9.90 /- Lakhs | |||||
| 2.001.Providing Attached Toilet room to Exsiting Hostel Room No. 101, at RIRD campus in Krishnagiri Dam- Rs. 0.90 /- Lakhs | |||||
| 3.00 | Dismantling of Floor finish & dadooing walls in cement mortar with Mosaic Tiles / Glazed Tiles / Clay Tiles / Cuddapah Slabs including cost and labour charges etc., complete. | 2.63 | Sqm | 65.49 ₹172.24 Lowest | 65.82 ₹173.11 |
| 4.00 | Removing of Doors and Windows including removal of frames, hinges and fastenings including cost and labour charges etc., complete. | 1.65 | Sqm | 164.13 ₹270.81 Lowest | 164.97 ₹272.2 |
| 5.00 | CEMENT CONCRETE 1:4:8 mix using 40mm gauge hand broken hard granite stone jelly for FOUNDATION including dewatering if found necessary and laid in layers of not more than 15cm thick, well rammed etc., complete complying with standard specification. | 0.22 | Cum | 5,450.03 ₹1,199.01 Lowest | 5,477.85 ₹1,205.13 |
| 6.00 | BRICK WORK in cement mortar 1:5 (One cement and five sand) using second class country bricks of size 23cm x 11cm x 7cm for the following including curing etc., complete complying with standard specifications. | 1.27 | Cum | 6,189.32 ₹7,860.44 Lowest | 6,220.92 ₹7,900.57 |
| 7.00 | PLASTERING with cement mortar 1:5 (one cement and five sand)12mm thick in all floors complying with standard specifications. | 15.53 | Sqm | 284.69 ₹4,421.24 Lowest | 286.14 ₹4,443.75 |
| 8.00 | Flooring with following ceramic tiles of size 305 x 305 x 6 mm laid over 20 mm thick cement mortar 1:3 (One Cement and Three M.Sand) base mortar over the existing slab / floor including cutting the tiles to the required size with special cutter wherever | 2.16 | Sqm | 1,066.79 ₹2,304.27 Lowest | 1,072.23 ₹2,316.02 |
| 9.00 | Dadooing walls with following best approved quality, white / colour glazed tiles of following sizes set in Cement Mortar 1:2 (One Cement and Two crushed stone M.Sand) 10mm thick and pointing the joints with white cement mixed with colouring pigments at the rate of 0.40 Kg. / sq.m. neatly in all floors, curing, etc., complying with standard specification and as directed by the departmental officers. | 13.9 | Sqm | 1,432.29 ₹19,908.83 Lowest | 1,439.61 ₹20,010.58 |
| 10.00 | Supplying and painting the walls with two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the walls smooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification. (The colour and shade of the distemper shall be got approved by the Executive Engineer before use of work). | 6.69 | Sqm | 205.58 ₹1,375.33 Lowest | 206.63 ₹1,382.35 |
Tender Value
₹9.9 L
EMD Value
₹10,000
Closing Date
27 Nov 2025, 3:00 pmClosed
Project Director DRDA Krishnagiri
DRDA Krishnagiri
Providing Attached Toilet room to Existing Hostel Room No 101 to105 and 108 to 113 at RIRD campus in Krishnagiri Dam at Krishnagiri Block in Krishnagiri DT Package Ni TN 04 KRI 267
2025_RDTN_622865_1
RocNo_6135_2025_R3_06_11_2025
Open Tender
Civil Works - Buildings
Item Rate
90 days
Krishnagiri
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹10,000
DRDA Krishnagiri
20 Jan 2026
12 Nov 2025
27 Nov 2025
12 Nov 2025
27 Nov 2025
12 Nov 2025
19 Nov 2025
Amount
Providing Attached Toilet room to Exsiting Hostel Room No. 101, 102, 103, 104, 105, 106, 107, 108, 109, 110, 111, 112 & 113 at RIRD campus in Krishnagiri Dam- Rs. 9.90 /- Lakhs
1.Providing Attached Toilet room to Exsiting Hostel Room No. 101, at RIRD campus in Krishnagiri Dam- Rs. 0.90 /- Lakhs
Dismantling of Floor finish & dadooing walls in cement mortar with Mosaic Tiles / Glazed Tiles / Clay Tiles / Cuddapah Slabs including cost and labour charges etc., complete.
Removing of Doors and Windows including removal of frames, hinges and fastenings including cost and labour charges etc., complete.
CEMENT CONCRETE 1:4:8 mix using 40mm gauge hand broken hard granite stone jelly for FOUNDATION including dewatering if found necessary and laid in layers of not more than 15cm thick, well rammed etc., complete complying with standard specification.
BRICK WORK in cement mortar 1:5 (One cement and five sand) using second class country bricks of size 23cm x 11cm x 7cm for the following including curing etc., complete complying with standard specifications.
PLASTERING with cement mortar 1:5 (one cement and five sand)12mm thick in all floors complying with standard specifications.
Flooring with following ceramic tiles of size 305 x 305 x 6 mm laid over 20 mm thick cement mortar 1:3 (One Cement and Three M.Sand) base mortar over the existing slab / floor including cutting the tiles to the required size with special cutter wherever
Dadooing walls with following best approved quality, white / colour glazed tiles of following sizes set in Cement Mortar 1:2 (One Cement and Two crushed stone M.Sand) 10mm thick and pointing the joints with white cement mixed with colouring pigments at the rate of 0.40 Kg. / sq.m. neatly in all floors, curing, etc., complying with standard specification and as directed by the departmental officers.
Supplying and painting the walls with two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the walls smooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification. (The colour and shade of the distemper shall be got approved by the Executive Engineer before use of work).
Supply and fixing of PVC door of following size including all cost and conveyance of all materials to site etc., complete.
Supply and fixing of Ventilator of following size including all cost and conveyance of all materials to site etc., complete.
Provision for water supply and sanitary arrangements
SS Tap
25mm PVC pipe
25mm PVC Elbow
25mm PVC Tee
20mm CPVC pipe
20mm CPVC Elbow
20mm CPVC Tee
110mm PVC pipe
110mm PVC Tee
110mm PVC Elbow
Wash basin
Towel rod
Mirror
Provision for electrical arrangements
light point open
Exhaust fan SD 115
Provision for Name board
Provision for Photograpic charges
2.Providing Attached Toilet room to Exsiting Hostel Room No. 102, at RIRD campus in Krishnagiri Dam- Rs. 0.90 /- Lakhs
Dismantling of Floor finish & dadooing walls in cement mortar with Mosaic Tiles / Glazed Tiles / Clay Tiles / Cuddapah Slabs including cost and labour charges etc., complete.
Removing of Doors and Windows including removal of frames, hinges and fastenings including cost and labour charges etc., complete.
CEMENT CONCRETE 1:4:8 mix using 40mm gauge hand broken hard granite stone jelly for FOUNDATION including dewatering if found necessary and laid in layers of not more than 15cm thick, well rammed etc., complete complying with standard specification.
BRICK WORK in cement mortar 1:5 (One cement and five sand) using second class country bricks of size 23cm x 11cm x 7cm for the following including curing etc., complete complying with standard specifications.
PLASTERING with cement mortar 1:5 (one cement and five sand)12mm thick in all floors complying with standard specifications.
Flooring with following ceramic tiles of size 305 x 305 x 6 mm laid over 20 mm thick cement mortar 1:3 (One Cement and Three M.Sand) base mortar over the existing slab / floor including cutting the tiles to the required size with special cutter wherever
Dadooing walls with following best approved quality, white / colour glazed tiles of following sizes set in Cement Mortar 1:2 (One Cement and Two crushed stone M.Sand) 10mm thick and pointing the joints with white cement mixed with colouring pigments at the rate of 0.40 Kg. / sq.m. neatly in all floors, curing, etc., complying with standard specification and as directed by the departmental officers.
Supplying and painting the walls with two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the walls smooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification. (The colour and shade of the distemper shall be got approved by the Executive Engineer before use of work).
Supply and fixing of PVC door of following size including all cost and conveyance of all materials to site etc., complete.
Supply and fixing of Ventilator of following size including all cost and conveyance of all materials to site etc., complete.
Provision for water supply and sanitary arrangements
SS Tap
25mm PVC pipe
25mm PVC Elbow
25mm PVC Tee
20mm CPVC pipe
20mm CPVC Elbow
20mm CPVC Tee
110mm PVC pipe
110mm PVC Tee
110mm PVC Elbow
Wash basin
Towel rod
Mirror
Provision for electrical arrangements
light point open
Exhaust fan SD 115
Provision for Name board
Provision for Photograpic charges
3.Providing Attached Toilet room to Exsiting Hostel Room No. 103, at RIRD campus in Krishnagiri Dam- Rs. 0.90 /- Lakhs
Dismantling of Floor finish & dadooing walls in cement mortar with Mosaic Tiles / Glazed Tiles / Clay Tiles / Cuddapah Slabs including cost and labour charges etc., complete.
Removing of Doors and Windows including removal of frames, hinges and fastenings including cost and labour charges etc., complete.
CEMENT CONCRETE 1:4:8 mix using 40mm gauge hand broken hard granite stone jelly for FOUNDATION including dewatering if found necessary and laid in layers of not more than 15cm thick, well rammed etc., complete complying with standard specification.
BRICK WORK in cement mortar 1:5 (One cement and five sand) using second class country bricks of size 23cm x 11cm x 7cm for the following including curing etc., complete complying with standard specifications.
PLASTERING with cement mortar 1:5 (one cement and five sand)12mm thick in all floors complying with standard specifications.
Flooring with following ceramic tiles of size 305 x 305 x 6 mm laid over 20 mm thick cement mortar 1:3 (One Cement and Three M.Sand) base mortar over the existing slab / floor including cutting the tiles to the required size with special cutter wherever
Dadooing walls with following best approved quality, white / colour glazed tiles of following sizes set in Cement Mortar 1:2 (One Cement and Two crushed stone M.Sand) 10mm thick and pointing the joints with white cement mixed with colouring pigments at the rate of 0.40 Kg. / sq.m. neatly in all floors, curing, etc., complying with standard specification and as directed by the departmental officers.
Supplying and painting the walls with two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the walls smooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification. (The colour and shade of the distemper shall be got approved by the Executive Engineer before use of work).
Supply and fixing of PVC door of following size including all cost and conveyance of all materials to site etc., complete.
Supply and fixing of Ventilator of following size including all cost and conveyance of all materials to site etc., complete.
Provision for water supply and sanitary arrangements
SS Tap
25mm PVC pipe
25mm PVC Elbow
25mm PVC Tee
20mm CPVC pipe
20mm CPVC Elbow
20mm CPVC Tee
110mm PVC pipe
110mm PVC Tee
110mm PVC Elbow
Wash basin
Towel rod
Mirror
Provision for electrical arrangements
light point open
Exhaust fan SD 115
Provision for Name board
Provision for Photograpic charges
4.Providing Attached Toilet room to Exsiting Hostel Room No. 104, at RIRD campus in Krishnagiri Dam- Rs. 0.90 /- Lakhs
Dismantling of Floor finish & dadooing walls in cement mortar with Mosaic Tiles / Glazed Tiles / Clay Tiles / Cuddapah Slabs including cost and labour charges etc., complete.
Removing of Doors and Windows including removal of frames, hinges and fastenings including cost and labour charges etc., complete.
CEMENT CONCRETE 1:4:8 mix using 40mm gauge hand broken hard granite stone jelly for FOUNDATION including dewatering if found necessary and laid in layers of not more than 15cm thick, well rammed etc., complete complying with standard specification.
BRICK WORK in cement mortar 1:5 (One cement and five sand) using second class country bricks of size 23cm x 11cm x 7cm for the following including curing etc., complete complying with standard specifications.
PLASTERING with cement mortar 1:5 (one cement and five sand)12mm thick in all floors complying with standard specifications.
Flooring with following ceramic tiles of size 305 x 305 x 6 mm laid over 20 mm thick cement mortar 1:3 (One Cement and Three M.Sand) base mortar over the existing slab / floor including cutting the tiles to the required size with special cutter wherever
Dadooing walls with following best approved quality, white / colour glazed tiles of following sizes set in Cement Mortar 1:2 (One Cement and Two crushed stone M.Sand) 10mm thick and pointing the joints with white cement mixed with colouring pigments at the rate of 0.40 Kg. / sq.m. neatly in all floors, curing, etc., complying with standard specification and as directed by the departmental officers.
Supplying and painting the walls with two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the walls smooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification. (The colour and shade of the distemper shall be got approved by the Executive Engineer before use of work).
Supply and fixing of PVC door of following size including all cost and conveyance of all materials to site etc., complete.
Supply and fixing of Ventilator of following size including all cost and conveyance of all materials to site etc., complete.
Provision for water supply and sanitary arrangements
SS Tap
25mm PVC pipe
25mm PVC Elbow
25mm PVC Tee
20mm CPVC pipe
20mm CPVC Elbow
20mm CPVC Tee
110mm PVC pipe
110mm PVC Tee
110mm PVC Elbow
Wash basin
Towel rod
Mirror
Provision for electrical arrangements
light point open
Exhaust fan SD 115
Provision for Name board
Provision for Photograpic charges
5.Providing Attached Toilet room to Exsiting Hostel Room No. 105, at RIRD campus in Krishnagiri Dam- Rs. 0.90 /- Lakhs
Dismantling of Floor finish & dadooing walls in cement mortar with Mosaic Tiles / Glazed Tiles / Clay Tiles / Cuddapah Slabs including cost and labour charges etc., complete.
Removing of Doors and Windows including removal of frames, hinges and fastenings including cost and labour charges etc., complete.
CEMENT CONCRETE 1:4:8 mix using 40mm gauge hand broken hard granite stone jelly for FOUNDATION including dewatering if found necessary and laid in layers of not more than 15cm thick, well rammed etc., complete complying with standard specification.
BRICK WORK in cement mortar 1:5 (One cement and five sand) using second class country bricks of size 23cm x 11cm x 7cm for the following including curing etc., complete complying with standard specifications.
PLASTERING with cement mortar 1:5 (one cement and five sand)12mm thick in all floors complying with standard specifications.
Flooring with following ceramic tiles of size 305 x 305 x 6 mm laid over 20 mm thick cement mortar 1:3 (One Cement and Three M.Sand) base mortar over the existing slab / floor including cutting the tiles to the required size with special cutter wherever
Dadooing walls with following best approved quality, white / colour glazed tiles of following sizes set in Cement Mortar 1:2 (One Cement and Two crushed stone M.Sand) 10mm thick and pointing the joints with white cement mixed with colouring pigments at the rate of 0.40 Kg. / sq.m. neatly in all floors, curing, etc., complying with standard specification and as directed by the departmental officers.
Supplying and painting the walls with two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the walls smooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification. (The colour and shade of the distemper shall be got approved by the Executive Engineer before use of work).
Supply and fixing of PVC door of following size including all cost and conveyance of all materials to site etc., complete.
Supply and fixing of Ventilator of following size including all cost and conveyance of all materials to site etc., complete.
Provision for water supply and sanitary arrangements
SS Tap
25mm PVC pipe
25mm PVC Elbow
25mm PVC Tee
20mm CPVC pipe
20mm CPVC Elbow
20mm CPVC Tee
110mm PVC pipe
110mm PVC Tee
110mm PVC Elbow
Wash basin
Towel rod
Mirror
Provision for electrical arrangements
light point open
Exhaust fan SD 115
Provision for Name board
Provision for Photograpic charges
6.Providing Attached Toilet room to Exsiting Hostel Room No. 108, at RIRD campus in Krishnagiri Dam- Rs. 0.90 /- Lakhs
Dismantling of Floor finish & dadooing walls in cement mortar with Mosaic Tiles / Glazed Tiles / Clay Tiles / Cuddapah Slabs including cost and labour charges etc., complete.
Removing of Doors and Windows including removal of frames, hinges and fastenings including cost and labour charges etc., complete.
CEMENT CONCRETE 1:4:8 mix using 40mm gauge hand broken hard granite stone jelly for FOUNDATION including dewatering if found necessary and laid in layers of not more than 15cm thick, well rammed etc., complete complying with standard specification.
BRICK WORK in cement mortar 1:5 (One cement and five sand) using second class country bricks of size 23cm x 11cm x 7cm for the following including curing etc., complete complying with standard specifications.
PLASTERING with cement mortar 1:5 (one cement and five sand)12mm thick in all floors complying with standard specifications.
Flooring with following ceramic tiles of size 305 x 305 x 6 mm laid over 20 mm thick cement mortar 1:3 (One Cement and Three M.Sand) base mortar over the existing slab / floor including cutting the tiles to the required size with special cutter wherever
Dadooing walls with following best approved quality, white / colour glazed tiles of following sizes set in Cement Mortar 1:2 (One Cement and Two crushed stone M.Sand) 10mm thick and pointing the joints with white cement mixed with colouring pigments at the rate of 0.40 Kg. / sq.m. neatly in all floors, curing, etc., complying with standard specification and as directed by the departmental officers.
Supplying and painting the walls with two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the walls smooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification. (The colour and shade of the distemper shall be got approved by the Executive Engineer before use of work).
Supply and fixing of PVC door of following size including all cost and conveyance of all materials to site etc., complete.
Supply and fixing of Ventilator of following size including all cost and conveyance of all materials to site etc., complete.
Provision for water supply and sanitary arrangements
SS Tap
25mm PVC pipe
25mm PVC Elbow
25mm PVC Tee
20mm CPVC pipe
20mm CPVC Elbow
20mm CPVC Tee
110mm PVC pipe
110mm PVC Tee
110mm PVC Elbow
Wash basin
Towel rod
Mirror
Provision for electrical arrangements
light point open
Exhaust fan SD 115
Provision for Name board
Provision for Photograpic charges
7.Providing Attached Toilet room to Exsiting Hostel Room No. 109, at RIRD campus in Krishnagiri Dam- Rs. 0.90 /- Lakhs
Dismantling of Floor finish & dadooing walls in cement mortar with Mosaic Tiles / Glazed Tiles / Clay Tiles / Cuddapah Slabs including cost and labour charges etc., complete.
Removing of Doors and Windows including removal of frames, hinges and fastenings including cost and labour charges etc., complete.
CEMENT CONCRETE 1:4:8 mix using 40mm gauge hand broken hard granite stone jelly for FOUNDATION including dewatering if found necessary and laid in layers of not more than 15cm thick, well rammed etc., complete complying with standard specification.
BRICK WORK in cement mortar 1:5 (One cement and five sand) using second class country bricks of size 23cm x 11cm x 7cm for the following including curing etc., complete complying with standard specifications.
PLASTERING with cement mortar 1:5 (one cement and five sand)12mm thick in all floors complying with standard specifications.
Flooring with following ceramic tiles of size 305 x 305 x 6 mm laid over 20 mm thick cement mortar 1:3 (One Cement and Three M.Sand) base mortar over the existing slab / floor including cutting the tiles to the required size with special cutter wherever
Dadooing walls with following best approved quality, white / colour glazed tiles of following sizes set in Cement Mortar 1:2 (One Cement and Two crushed stone M.Sand) 10mm thick and pointing the joints with white cement mixed with colouring pigments at the rate of 0.40 Kg. / sq.m. neatly in all floors, curing, etc., complying with standard specification and as directed by the departmental officers.
Supplying and painting the walls with two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the walls smooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification. (The colour and shade of the distemper shall be got approved by the Executive Engineer before use of work).
Supply and fixing of PVC door of following size including all cost and conveyance of all materials to site etc., complete.
Supply and fixing of Ventilator of following size including all cost and conveyance of all materials to site etc., complete.
Provision for water supply and sanitary arrangements
SS Tap
25mm PVC pipe
25mm PVC Elbow
25mm PVC Tee
20mm CPVC pipe
20mm CPVC Elbow
20mm CPVC Tee
110mm PVC pipe
110mm PVC Tee
110mm PVC Elbow
Wash basin
Towel rod
Mirror
Provision for electrical arrangements
light point open
Exhaust fan SD 115
Provision for Name board
Provision for Photograpic charges
8.Providing Attached Toilet room to Exsiting Hostel Room No. 110, at RIRD campus in Krishnagiri Dam- Rs. 0.90 /- Lakhs
Dismantling of Floor finish & dadooing walls in cement mortar with Mosaic Tiles / Glazed Tiles / Clay Tiles / Cuddapah Slabs including cost and labour charges etc., complete.
Removing of Doors and Windows including removal of frames, hinges and fastenings including cost and labour charges etc., complete.
CEMENT CONCRETE 1:4:8 mix using 40mm gauge hand broken hard granite stone jelly for FOUNDATION including dewatering if found necessary and laid in layers of not more than 15cm thick, well rammed etc., complete complying with standard specification.
BRICK WORK in cement mortar 1:5 (One cement and five sand) using second class country bricks of size 23cm x 11cm x 7cm for the following including curing etc., complete complying with standard specifications.
PLASTERING with cement mortar 1:5 (one cement and five sand)12mm thick in all floors complying with standard specifications.
Flooring with following ceramic tiles of size 305 x 305 x 6 mm laid over 20 mm thick cement mortar 1:3 (One Cement and Three M.Sand) base mortar over the existing slab / floor including cutting the tiles to the required size with special cutter wherever
Dadooing walls with following best approved quality, white / colour glazed tiles of following sizes set in Cement Mortar 1:2 (One Cement and Two crushed stone M.Sand) 10mm thick and pointing the joints with white cement mixed with colouring pigments at the rate of 0.40 Kg. / sq.m. neatly in all floors, curing, etc., complying with standard specification and as directed by the departmental officers.
Supplying and painting the walls with two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the walls smooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification. (The colour and shade of the distemper shall be got approved by the Executive Engineer before use of work).
Supply and fixing of PVC door of following size including all cost and conveyance of all materials to site etc., complete.
Supply and fixing of Ventilator of following size including all cost and conveyance of all materials to site etc., complete.
Provision for water supply and sanitary arrangements
SS Tap
25mm PVC pipe
25mm PVC Elbow
25mm PVC Tee
20mm CPVC pipe
20mm CPVC Elbow
20mm CPVC Tee
110mm PVC pipe
110mm PVC Tee
110mm PVC Elbow
Wash basin
Towel rod
Mirror
Provision for electrical arrangements
light point open
Exhaust fan SD 115
Provision for Name board
Provision for Photograpic charges
9.Providing Attached Toilet room to Exsiting Hostel Room No. 111, at RIRD campus in Krishnagiri Dam- Rs. 0.90 /- Lakhs
Dismantling of Floor finish & dadooing walls in cement mortar with Mosaic Tiles / Glazed Tiles / Clay Tiles / Cuddapah Slabs including cost and labour charges etc., complete.
Removing of Doors and Windows including removal of frames, hinges and fastenings including cost and labour charges etc., complete.
CEMENT CONCRETE 1:4:8 mix using 40mm gauge hand broken hard granite stone jelly for FOUNDATION including dewatering if found necessary and laid in layers of not more than 15cm thick, well rammed etc., complete complying with standard specification.
BRICK WORK in cement mortar 1:5 (One cement and five sand) using second class country bricks of size 23cm x 11cm x 7cm for the following including curing etc., complete complying with standard specifications.
PLASTERING with cement mortar 1:5 (one cement and five sand)12mm thick in all floors complying with standard specifications.
Flooring with following ceramic tiles of size 305 x 305 x 6 mm laid over 20 mm thick cement mortar 1:3 (One Cement and Three M.Sand) base mortar over the existing slab / floor including cutting the tiles to the required size with special cutter wherever
Dadooing walls with following best approved quality, white / colour glazed tiles of following sizes set in Cement Mortar 1:2 (One Cement and Two crushed stone M.Sand) 10mm thick and pointing the joints with white cement mixed with colouring pigments at the rate of 0.40 Kg. / sq.m. neatly in all floors, curing, etc., complying with standard specification and as directed by the departmental officers.
Supplying and painting the walls with two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the walls smooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification. (The colour and shade of the distemper shall be got approved by the Executive Engineer before use of work).
Supply and fixing of PVC door of following size including all cost and conveyance of all materials to site etc., complete.
Supply and fixing of Ventilator of following size including all cost and conveyance of all materials to site etc., complete.
Provision for water supply and sanitary arrangements
SS Tap
25mm PVC pipe
25mm PVC Elbow
25mm PVC Tee
20mm CPVC pipe
20mm CPVC Elbow
20mm CPVC Tee
110mm PVC pipe
110mm PVC Tee
110mm PVC Elbow
Wash basin
Towel rod
Mirror
Provision for electrical arrangements
light point open
Exhaust fan SD 115
Provision for Name board
Provision for Photograpic charges
10.Providing Attached Toilet room to Exsiting Hostel Room No. 112, at RIRD campus in Krishnagiri Dam- Rs. 0.90 /- Lakhs
Dismantling of Floor finish & dadooing walls in cement mortar with Mosaic Tiles / Glazed Tiles / Clay Tiles / Cuddapah Slabs including cost and labour charges etc., complete.
Removing of Doors and Windows including removal of frames, hinges and fastenings including cost and labour charges etc., complete.
CEMENT CONCRETE 1:4:8 mix using 40mm gauge hand broken hard granite stone jelly for FOUNDATION including dewatering if found necessary and laid in layers of not more than 15cm thick, well rammed etc., complete complying with standard specification.
BRICK WORK in cement mortar 1:5 (One cement and five sand) using second class country bricks of size 23cm x 11cm x 7cm for the following including curing etc., complete complying with standard specifications.
PLASTERING with cement mortar 1:5 (one cement and five sand)12mm thick in all floors complying with standard specifications.
Flooring with following ceramic tiles of size 305 x 305 x 6 mm laid over 20 mm thick cement mortar 1:3 (One Cement and Three M.Sand) base mortar over the existing slab / floor including cutting the tiles to the required size with special cutter wherever
Dadooing walls with following best approved quality, white / colour glazed tiles of following sizes set in Cement Mortar 1:2 (One Cement and Two crushed stone M.Sand) 10mm thick and pointing the joints with white cement mixed with colouring pigments at the rate of 0.40 Kg. / sq.m. neatly in all floors, curing, etc., complying with standard specification and as directed by the departmental officers.
Supplying and painting the walls with two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the walls smooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification. (The colour and shade of the distemper shall be got approved by the Executive Engineer before use of work).
Supply and fixing of PVC door of following size including all cost and conveyance of all materials to site etc., complete.
Supply and fixing of Ventilator of following size including all cost and conveyance of all materials to site etc., complete.
Provision for water supply and sanitary arrangements
SS Tap
25mm PVC pipe
25mm PVC Elbow
25mm PVC Tee
20mm CPVC pipe
20mm CPVC Elbow
20mm CPVC Tee
110mm PVC pipe
110mm PVC Tee
110mm PVC Elbow
Wash basin
Towel rod
Mirror
Provision for electrical arrangements
light point open
Exhaust fan SD 115
Provision for Name board
Provision for Photograpic charges
11.Providing Attached Toilet room to Exsiting Hostel Room No. 113, at RIRD campus in Krishnagiri Dam- Rs. 0.90 /- Lakhs
Dismantling of Floor finish & dadooing walls in cement mortar with Mosaic Tiles / Glazed Tiles / Clay Tiles / Cuddapah Slabs including cost and labour charges etc., complete.
Removing of Doors and Windows including removal of frames, hinges and fastenings including cost and labour charges etc., complete.
CEMENT CONCRETE 1:4:8 mix using 40mm gauge hand broken hard granite stone jelly for FOUNDATION including dewatering if found necessary and laid in layers of not more than 15cm thick, well rammed etc., complete complying with standard specification.
BRICK WORK in cement mortar 1:5 (One cement and five sand) using second class country bricks of size 23cm x 11cm x 7cm for the following including curing etc., complete complying with standard specifications.
PLASTERING with cement mortar 1:5 (one cement and five sand)12mm thick in all floors complying with standard specifications.
Flooring with following ceramic tiles of size 305 x 305 x 6 mm laid over 20 mm thick cement mortar 1:3 (One Cement and Three M.Sand) base mortar over the existing slab / floor including cutting the tiles to the required size with special cutter wherever
Dadooing walls with following best approved quality, white / colour glazed tiles of following sizes set in Cement Mortar 1:2 (One Cement and Two crushed stone M.Sand) 10mm thick and pointing the joints with white cement mixed with colouring pigments at the rate of 0.40 Kg. / sq.m. neatly in all floors, curing, etc., complying with standard specification and as directed by the departmental officers.
Supplying and painting the walls with two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the walls smooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification. (The colour and shade of the distemper shall be got approved by the Executive Engineer before use of work).
Supply and fixing of PVC door of following size including all cost and conveyance of all materials to site etc., complete.
Supply and fixing of Ventilator of following size including all cost and conveyance of all materials to site etc., complete.
Provision for water supply and sanitary arrangements
SS Tap
25mm PVC pipe
25mm PVC Elbow
25mm PVC Tee
20mm CPVC pipe
20mm CPVC Elbow
20mm CPVC Tee
110mm PVC pipe
110mm PVC Tee
110mm PVC Elbow
Wash basin
Towel rod
Mirror
Provision for electrical arrangements
light point open
Exhaust fan SD 115
Provision for Name board
Provision for Photograpic charges
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Alagesan Contractor (BID ID -1521789)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.16 MB
BOQ_744811.xls
BOQ • 0.44 MB
tb267.pdf
Tender Documents • 0.64 MB
pb267.pdf
Tender Documents • 0.52 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .