Loading…
Loading…
Tender Value
₹2.1 Cr
EMD Value
₹4.2 L
Closing Date
29 Jul 2026, 2:00 pmClosed
Director
NEIGRIHMS, Mawdiangdiang
Construction of Boundary Wall / Fencing for the New Land at Mawpat, Shillong
2026_NES_916605_1
CVENGG-ESTI/165/2025-Engg (C)
Open Tender
Civil Works
Works
540 days
NEIGRIHMS, Mawdiangdiang
EMD, Affidavit, Registration, Manual, etc and all other related documents as per tender document
2 documents required · 2 mandatory
₹0
₹4.2 L
29 Jul 2026
9 Jul 2026
30 Jul 2026
10 Jul 2026
29 Jul 2026
11 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Earthwork in excavation by manual means upto a depth of 2m below the existing ground level for foundation trenches including dressing of sides and ramming of the bottom including stacking of serviceable stones, disposal and removal of the excavated earth within the lead of 50m and lift of 1.5m complete
b) In ordinary rock (soft rock/ medium rock/ hard shale) | 1,339.45 | Cum | 414 | ₹5,54,532.3 |
| 1.02 | Providing boulder or stone filling with boulders or stones 15 cm size, 60 cm wide behind the retaining wall etc. complete as directed. | 123.03 | Cum | 2,381 | ₹2,92,934.43 |
| 1.03 | Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement: 6 coarse sand:12 graded stone aggregate 20 mm nominal size) upto plinth level with:
Cement mortar 1:6 (1 cement:6 coarse sand) | 484.84 | Cum | 6,098 | ₹29,56,554.32 |
| 1.04 | b)Supplying, fitting and fixing in position High Yield Strength Deformed bars reinforcement bars upto 1st floor level | 1 | Qntl | 9,057 | ₹9,047.94 |
| 1.05 | Providing shuttering for Foundations/ Footings, Columns etc | 8,520.08 | Sqm | 251 | ₹21,38,540.08 |
| 1.06 | Plain cement concrete works in foundation bed for footing steps, walls, brick works etc below plinth level as directed and specified including dewatering if necessary, and curing complete (shuttering where necessary shall be measured and paid separately).1:3:6 (1 Cement: 3 coarse sand: 6 graded stone aggregate 20 mm nominal size) | 0.28 | Cum | 7,601 | ₹2,127.52 |
| 1.07 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement- All work up to plinth level: M15 or Prop. 1:2:4 (1 cement: 2 coarse sand: 4 graded stone aggregate 20 mm nominal size) | 0.92 | Cum | 8,658 | ₹7,965.36 |
| 1.08 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement- All work up to plinth level: M20 or 1:1½:3 (1 cement: 1½ coarse sand: 3 graded stone aggregate 20 mm nominal size) | 7.2 | Cum | 9,336 | ₹67,219.2 |
| 1.09 | Brick work with common burnt clay (non modular) 1st class bricks in foundation and in plinth: | 0.8 | Cum | 9,947 | ₹7,957.6 |
| 1.1 | Supplying at site Angle iron post & strut of required size including bottom to be split and bent at right angle in opposite direction for 10 cm length and drilling holes upto 10 mm dia. etc. complete. | 9,940.92 | kg | 121 | ₹12,02,851.32 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.89 MB
BOQ_963275.xls
BOQ • 0.25 MB
29-7.pdf
PDF • 0.13 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .