Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.9 CrAdmitted-Finance NO 354 ABITHA GARDEN ABIRAMI STREET VILLUPURAM 29 | 29 | ₹1.9 Cr | L1 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SSV DEVELOPERS L1 |
|---|---|---|---|---|
| 1.00Retrofitting for the existing CWSS to Rajapettai and 14 other habitation in Cuddalore & Kurinjipadi union in Cuddalore district – under JJM – 2021–22. (Construction Period – 6 Months and Free Maintenance: 3 months) (E – submission). | ||||
| 1.01 | Providing Inter connection work for Borewell to sump | 1 | No | 6,67,450 ₹7,47,544 Lowest |
| 1.02 | Construction of 4m x 3m pump room at Head works Collection sump - 2 Nos. | 1 | No | 6,83,836.84 ₹7,65,897.26 Lowest |
| 1.03 | Supply, delivery and erection of vertical type submersible pumpset 250 lpm x 75 m head - 2 Nos and 250 lpm x 60 m head - 2 Nos in the existing bore well no.1, 2 and newly proposed borewells 3 and 4 located near Palliodai | 1 | No | 21,01,572 ₹23,53,760.64 Lowest |
| 1.04 | Providing HDPE pipe and DI pipe in the place of existing HDPE & PVC Pipe | 1 | No | 90,13,738 ₹1,00,95,386.56 Lowest |
| 1.05 | Providing new submersible pumpset in the place existing age old pumpset at Collection sump at Perumal Eri and Booster sump at Thiruchopuram | 1 | No | 10,79,021 ₹12,08,503.52 Lowest |
| 1.06 | CONSTRUCTION OF COMPOUND WALL AT HEAD WORKS PERUMAL ERI AND BOOSTER SUMP AT THIRUCHOPURAM Size - 30 x 30 = 2 Nos | 1 | No | 31,15,131.85 ₹34,88,947.67 Lowest |
| 1.07 | White washing, colour washing and Painting for all Sump, Lighting Arrrangements for all PRs and Wiring arrangements for TNEB post to PR. | 1 | No | 5,16,537.59 ₹5,78,522.1 Lowest |
| 1.08 | MAINTENANCE OF THE SCHEME (3 Months Free of cost) | 1 | No | - |
Tender Value
₹1.9 Cr
EMD Value
₹1.5 L
Closing Date
26 May 2022, 3:00 pmClosed
Chief Engineer, TWAD, Vellore
No.8 First East Main Road, Gandhi Nagar, Vellore
Retrofitting of Existing CWSS to Rajapet in Cuddalore District
2022_TWAD_232277_1
08to11retrorajapet02052022
Open Tender
Civil Works
Lump-sum
270 days
Cuddalore
Refer Bid Document
4 documents required · 4 mandatory
₹0
₹1.5 L
Yes
Vellore
24 Jun 2022
14 May 2022
27 May 2022
14 May 2022
26 May 2022
14 May 2022
14 May 2022 - 20 May 2022
18 May 2022
Retrofitting for the existing CWSS to Rajapettai and 14 other habitation in Cuddalore & Kurinjipadi union in Cuddalore district – under JJM – 2021–22. (Construction Period – 6 Months and Free Maintenance: 3 months) (E – submission).
Providing Inter connection work for Borewell to sump
Construction of 4m x 3m pump room at Head works Collection sump - 2 Nos.
Supply, delivery and erection of vertical type submersible pumpset 250 lpm x 75 m head - 2 Nos and 250 lpm x 60 m head - 2 Nos in the existing bore well no.1, 2 and newly proposed borewells 3 and 4 located near Palliodai
Providing HDPE pipe and DI pipe in the place of existing HDPE & PVC Pipe
Providing new submersible pumpset in the place existing age old pumpset at Collection sump at Perumal Eri and Booster sump at Thiruchopuram
CONSTRUCTION OF COMPOUND WALL AT HEAD WORKS PERUMAL ERI AND BOOSTER SUMP AT THIRUCHOPURAM Size - 30 x 30 = 2 Nos
White washing, colour washing and Painting for all Sump, Lighting Arrrangements for all PRs and Wiring arrangements for TNEB post to PR.
MAINTENANCE OF THE SCHEME (3 Months Free of cost)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.51 MB
bidocumentrajapeetai.pdf
Tender Documents • 1.56 MB
BOQ_273792.xls
BOQ • 0.74 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .