Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.8 LAdmitted-Finance | -44.40% | ₹2.8 L | L1 | Admitted-Finance |
| 2 | L2₹2.8 LAdmitted-Finance | -43.00% | ₹2.8 L | L2 | Admitted-Finance |
| 3 | L3₹2.9 LAdmitted-Finance 140 NEAR DAKBANGLO DHARAM GOOL RAMBAN UDHAMPUR J K | RAMBAN | JAMMU AND KASHMIR | 182144 | -42.99% | ₹2.9 L | L3 | Admitted-Finance |
| 4 | L4₹2.9 LAdmitted-Finance | -41.78% | ₹2.9 L | L4 | Admitted-Finance |
| 5 | L5₹3.2 LAdmitted-Finance | -35.79% | ₹3.2 L | L5 | Admitted-Finance |
Updated dates
Tender Value
₹5 L
EMD Value
₹10,000
Closing Date
3 Feb 2026, 4:00 pmClosed
Executive Engineer
Executive Engineer PWD RNB Division Thathri
Approach road to PHC Gundna By way of semi pacca Edge wall in km 1st RD 0 250 permanent Restoration under UT Capex
2026_PWDJK_300589_3
e-NIT NO. 64 OF 2025-26
Open Tender
Civil Works
30 days
Thathri
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Yes
Executive Engineer PWD Division Thathri
₹10,000
Yes
12 Feb 2026
14 Jan 2026
4 Feb 2026
14 Jan 2026
3 Feb 2026
14 Jan 2026
Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres:
All kinds of soil :
Ordinary Rock
Hard Rock
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) with 20% boulders
Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases of columns etc. for mass concrete.
Foundations, footings, bases of columns etc. for mass concrete.
Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc.
Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with: Cement mortar 1:6 (1 Cement : 6 coarse sand) Nallah
Dry random rubble masonry with hard stone in foundation and plinth: Without bond stone Nallah
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
Carriage of material by Mechanical Transport
Carriage of Stone an avg. lead of 04 km by MT
Carriage of Sand an avg. lead of 45 km by MT
Carriage of Bajiri an avg. lead of 45 km by MT
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.67 MB
BOQ_975129.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid