| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 CrAdmitted-Finance | ₹1.3 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.3 Cr+₹70,132.12 (0.54%)Admitted-Finance | ₹1.3 Cr+₹70,132.12 (0.54%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | G.MANI L1 | T.PRAVEEN KUMAR L2 |
|---|---|---|---|---|---|
| 1.00PART I: Rejuvenation of Nadu Kuttai in Ullavur Panchayat Estimate Amount : Rs.27.80 Lakh | |||||
| 2.00 | Clearing the Scrub jungle with uprooting and disposing of the same as directed by the Engineer in charge of the Works and as per technical specification | 714 | sqm | - | - |
| 3.00 | Earthwork in all soils except hard rock requiring blasting and conveying with a lead of 0 to 100 M by deploying earth moving machineries and tippers for formation of bund in layers of suitable thickness, depending upon type of compaction equipment deploy | 5,827.5 | cum | - | - |
| 4.00 | Sectioning during forming bund when earth moving machineries, lorries and roller are used for consolidation | 5,827.5 | cum | - | - |
| 5.00Construction of Masonry Structures | |||||
| 6.00 | Earthwork excavation in all clauses of soil except hard rock which required blasting such as hard red earth, shalls, murrams including all cost and all labour charges etc., complete as per SS 20 B for foundation | 180.53 | cum | - | - |
| 7.00 | Filling with sand including all cost and conveyance and labour charges etc complete | 36.1 | cum | - | - |
| 8.00 | Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc. | 43.24 | cum | - | - |
| 9.00 | Supplying and erecting centering shuttering with necessary supports including cost and conveyance and all labour charges etc. | 1,066.08 | sqm | - | - |
| 10.00 | Cement Concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyanceof all materials to work site and all labour charges etc. | 181.04 | cum | - | - |
Tender Value
₹1.5 Cr
EMD Value
₹1.6 L
Closing Date
13 Feb 2020, 3:00 pmClosed
The Project Director DRDA Kancheepuram
O/o The Project Director DRDA Kancheepuram
Rejuvenation of 5 Nos. of Ponds in Walajabad Block of Kancheepuram District for the year 2019-20 under SFC - PU and DP Grant 2019-20 having Pkg No.10/2019-20
2020_RDTN_157401_1
DIPR/646/Tenders/2020, dt.30.01.2020
Open Tender
Civil Works
Item Rate
180 days
Walajabad Block
Please refer Tender documents.
9 documents required · 9 mandatory
₹0
₹1.6 L
O/o The Project Director DRDA Kancheepuram
21 Feb 2020
8 Feb 2020
13 Feb 2020
8 Feb 2020
13 Feb 2020
8 Feb 2020
10 Feb 2020
Amount
PART I: Rejuvenation of Nadu Kuttai in Ullavur Panchayat Estimate Amount : Rs.27.80 Lakh
Clearing the Scrub jungle with uprooting and disposing of the same as directed by the Engineer in charge of the Works and as per technical specification
Earthwork in all soils except hard rock requiring blasting and conveying with a lead of 0 to 100 M by deploying earth moving machineries and tippers for formation of bund in layers of suitable thickness, depending upon type of compaction equipment deploy
Sectioning during forming bund when earth moving machineries, lorries and roller are used for consolidation
Construction of Masonry Structures
Earthwork excavation in all clauses of soil except hard rock which required blasting such as hard red earth, shalls, murrams including all cost and all labour charges etc., complete as per SS 20 B for foundation
Filling with sand including all cost and conveyance and labour charges etc complete
Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc.
Supplying and erecting centering shuttering with necessary supports including cost and conveyance and all labour charges etc.
Cement Concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyanceof all materials to work site and all labour charges etc.
Gravel packing to revetment to 15cm thickness from approved quarry including cost and convenyance etc complete
Rough stone dry packing from revetment work complying with standard specification including all cost and charge etc complete
Colour washing two coats with cement paint including cost and conveyance of materials and all labour charges etc complet as per standard specification
PART II: Rejuvenation of Pudhu Kuttai in Uthukadu Panchayat Estimate Amount : Rs.33.50 Lakh
Clearing the Scrub jungle with uprooting and disposing of the same as directed by the Engineer in charge of the Works and as per technical specification
Earthwork in all soils except hard rock requiring blasting and conveying with a lead of 0 to 100 M by deploying earth moving machineries and tippers for formation of bund in layers of suitable thickness, depending upon type of compaction equipment deploy
Sectioning during forming bund when earth moving machineries, lorries and roller are used for consolidation
Construction of Masonry Structures
Earthwork excavation in all clauses of soil except hard rock which required blasting such as hard red earth, shalls, murrams including all cost and all labour charges etc., complete as per SS 20 B for foundation
Filling of sand including all cost and conveyance and labour charges etc complete
Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc.
Supplying and erecting centering shuttering with necessary supports including cost and conveyance and all labour charges etc.
Cement Concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyanceof all materials to work site and all labour charges etc.
Gravel packing to revetment to 15cm thickness from approved quarry including cost and convenyance etc complete
Rough stone dry packing from revetment work complying with standard specification including all cost and charge etc complete
Colour washing two coats with cement paint including cost and conveyance of materials and all labour charges etc complet as per standard specification
PART III : Rejuvenation of Vannan Kulam in Uthukadu Panchayat Estimate Amount : Rs.30.08 Lakh
Clearing the Scrub jungle with uprooting and disposing of the same as directed by the Engineer in charge of the Works and as per technical specification
Earthwork in all soils except hard rock requiring blasting and conveying with a lead of 0 to 100 M by deploying earth moving machineries and tippers for formation of bund in layers of suitable thickness, depending upon type of compaction equipment deploy
Sectioning during forming bund when earth moving machineries, lorries and roller are used for consolidation
Construction of Masonry Structures
Earthwork excavation in all clauses of soil except hard rock which required blasting such as hard red earth, shalls, murrams including all cost and all labour charges etc., complete as per SS 20 B for foundation
Filling of sand including all cost and conveyance and labour charges etc complete
Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc.
Supplying and erecting centering shuttering with necessary supports including cost and conveyance and all labour charges etc.
Cement Concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyanceof all materials to work site and all labour charges etc.
Gravel packing to revetment to 15cm thickness from approved quarry including cost and convenyance etc complete
Rough stone dry packing from revetment work complying with standard specification including all cost and charge etc complete
Colour washing two coats with cement paint including cost and conveyance of materials and all labour charges etc complet as per standard specification
PART IV : Rejuvenation of Selliyamman Kulam in Valathur Panchayat Estimate Amount : Rs.30.82 Lakh
Clearing the Scrub jungle with uprooting and disposing of the same as directed by the Engineer in charge of the Works and as per technical specification
Earthwork in all soils except hard rock requiring blasting and conveying with a lead of 0 to 100 M by deploying earth moving machineries and tippers for formation of bund in layers of suitable thickness, depending upon type of compaction equipment deploy
Sectioning during forming bund when earth moving machineries, lorries and roller are used for consolidation
Construction of Masonry Structures
Earthwork excavation in all clauses of soil except hard rock which required blasting such as hard red earth, shalls, murrams including all cost and all labour charges etc., complete as per SS 20 B for foundation
Filling with sand including all cost and conveyance and labour charges etc complete
Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc.
Supplying and erecting centering shuttering with necessary supports including cost and conveyance and all labour charges etc.
Cement Concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyanceof all materials to work site and all labour charges etc.
Gravel packing to revetment to 15cm thickness from approved quarry including cost and convenyance etc complete
Rough stone dry packing from revetment work complying with standard specification including all cost and charge etc complete
Colour washing two coats with cement paint including cost and conveyance of materials and all labour charges etc complet as per standard specification
PART V : Rejuvenation of Veepamarathu Kuttai in valathur Panchayat Estimate Amount : Rs.31.90 Lakh
Clearing the Scrub jungle with uprooting and disposing of the same as directed by the Engineer in charge of the Works and as per technical specification
Earthwork in all soils except hard rock requiring blasting and conveying with a lead of 0 to 100 M by deploying earth moving machineries and tippers for formation of bund in layers of suitable thickness, depending upon type of compaction equipment deploy
Sectioning during forming bund when earth moving machineries, lorries and roller are used for consolidation
Construction of Masonry Structures
Earthwork excavation in all clauses of soil except hard rock which required blasting such as hard red earth, shalls, murrams including all cost and all labour charges etc., complete as per SS 20 B for foundation
Filling of sand including all cost and conveyance and labour charges etc complete
Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc.
Supplying and erecting centering shuttering with necessary supports including cost and conveyance and all labour charges etc.
Cement Concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyanceof all materials to work site and all labour charges etc.
Gravel packing to revetment to 15cm thickness from approved quarry including cost and convenyance etc complete
Rough stone dry packing from revetment work complying with standard specification including all cost and charge etc complete
Colour washing two coats with cement paint including cost and conveyance of materials and all labour charges etc complet as per standard specification
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
T.PRAVEEN KUMAR
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.11 MB
Technical_.pdf
Tender Documents • 0.54 MB
BOQ_188729.xls
BOQ • 0.30 MB
Price.pdf
Additional Documents • 0.14 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .