| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹39.0 LRejected-Finance | 1 | Rejected-Finance lower than acceptable hence rejected | |
| 2 | 2₹47.2 L+₹8.2 L (21.1%)Rejected-Finance FLAT NO 134 TF POCKET C SECTOR B 2 NARELA DELHI 110040 | NORTH | DELHI | 110040 | 2 | Rejected-Finance second lowest | |
| 3 | 3₹50.0 L+₹11.0 L (28.1%)Rejected-Finance | 3 | Rejected-Finance third lowest |
Tender Value
₹50.0 L
EMD Value
₹99,963
Closing Date
11 May 2023, 5:00 pmClosed
Member Scretary
6th floor shramashakti bhavan panaji
supply and installation of synthetic football turf along with fencing and lighting for futsal ground in ward no 9 borda margao
2023_GSUDA_8529_1
43/3/GSUDA/3/23-24/161
Open Tender
Civil Works - Others
Item Rate
60 days
MARGAO
Please refer Tender documents.
4 documents required · 4 mandatory
₹3,000
₹99,963
31 Aug 2023
3 May 2023
12 May 2023
3 May 2023
11 May 2023
3 May 2023
Amount
Supply and Installation of FIFA Certified Synthetic Football Turf with Silica sand and SBR infill to include playing area plus 10% wastage - 5 year warranty
Earth work in surface for making proper ground slope in hard soil for levelling & lowering the ground manually (other than foundation of buildings, culverts, road, drains & trenches of pipe lines and cables) & removing the excavated stuff to a distance not exceeding 50m and lift up to1.5m excavated surface levelled and neatly dressed, disposed earth to be levelled after breaking clods and neatly dressed as per specifications.
Compaction of original ground with maximum of 6 passes of 8 to 10 tones power vibratory roller including filling in depression occurring during rolling including cost of all labour, HOM of machinery complete as per specifications. MORTH Chapter 3 (V.P.No.157. I.No.19.64)
Earthwork excavation by mechanical means for trench cutting( by hydraulic excavator ) in hard soil involving an average horizontal throw up to 2 meters and an average lift up to 0.5 m, excavated surface levelled and sides neatly dressed, the disposed earth to be levelled neatly after breaking of clods complete as per specifications. Complete for drainage facilities
Providing and spreading of high quality weedicide over the prepared surface to avoid the growth of the weeds in the top surface
GAP 40 -----Supplying, spreading and consolidating stone metal of specific size in requisite thickness in trenches for sub soil drainage. As necessarily spreading with manual means or hydraulic loaded or j.c.b. Laying the materials to fill up the interstices of coarse aggregates as directed, including lighting, guarding & barricading and making necessary earthen bundh on each side where necessary to protect edges and preparing including the cost of materials and hire and labour charges of all men and machineries with Grading OF 40MM Stone chips(75 mm)
GAP 20 -----Supplying, spreading and consolidating stone metal of specific size in hard crust to requisite thickness in layers including screening of metals stc. As necessary, spreading manually or with the help of motor grader sweeping, watering and rolling stages with power roller to proper line, grade and camber, spreading and sweeping requisite type and quantity of screening materials to fill up the interstices of coarse aggregates applying binding materials as directed, including lighting, guarding & barricading and making necessary earthen bundh of one meter width on each side where necessary to protect edges and preparing the bed by necessary cutting or filling and rolling all complete including the cost of materials and hire and labour charges of all men and machineries with Grading of 20mm stone chips (50 m)
GAP 10 ---- Supplying, spreading and consolidating stone metal of specific size in hard crust to requisite thickness in layers including screening of metals stc. As necessary, spreading manually or with the help of motor grader sweeping, watering and rolling stages with power roller to proper line, grade and camber, spreading and sweeping requisite type and quantity of screening materials to fill up the interstices of coarse aggregates applying binding materials as directed, including lighting, guarding & barricading and making necessary earthen bundh of one meter width on each side where necessary to protect edges and preparing the bed by necessary cutting or filling and rolling all complete including the cost of materials and hire and labour charges of all men and machineries with Grading of 10mm stone chips ( 25 mm Thick)
Stone Dust layer with levelling surface ----- Supplying, spreading and consolidating stone dust with screening materials of specific size in hard crust to requisite thickness in layers. As necessary, spreading manually or with the help of motor grader sweeping, watering and rolling stages with power roller to proper line, grade and camber, spreading and sweeping requisite type and quantity including guarding & barricading and making necessary earthen bundh of one meter width on each side where necessary to protect edges and preparing the bed by necessary cutting or filling and rolling all complete including the cost of materials and hire and labour charges of all men and machineries with Grading of stone Dust
Supplying laying and placing the sub soil drainage line with perforated slot including the bending, joining, fixing all necessary short pieces , including the application of solvent as required. 100 mm dia Pipes are considered with 4 kg Water Hammering Pressure ( for inside the field in Diagonal Placement)
Supplying laying and placing the sub soil draingae line with solid UPVC including the bending, joining, fixing all necessary short pieces , including the application of solvent as required. 150 mm UPVC pipes to be laid along the longer side to channelize water outside the ground
Providing and laying Geo Textile cloth on the drain pipes below the aggregates surface.
Providing and constructing Drainage Sump to collect and dispose surface drainage water to main subsoil drainage line accordingly.
Construction of Toe Wall with concrete blocks of Thickness 6 inches , Height as per the requirement of Sports Surface. Depth of Toe wall below the ground to be 150 mm. PCC of thickness 50 mm to be done below the toe wall. Plaster of Mix 1:4 to be done on Visible outer surface of Toe Wall .
Fencing to create cage like structure - 100 x 100 mm poles of thickness 3.6 mm (56 nos), 40 x 40 mm poles of thickness 2.6 mm (18 nos) and 40 x 60 mm of thickness 2.6 mm (10 nos) - Supply, transport & installation
Supply and Installation of Garware Net for Cage Structure (50 x 50 mm) of 2.5 mm thickness
Lighting Solutions - (150 W LED) with requisite wiring
Moveable Goal Posts with Nets
TECHNO SPORTS INFRA PVT LTD
PROGREEN SPORTS INFRA
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .