| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.2 LAccepted-AOC | L1 | Accepted-AOC BEING L1 | |
| 2 | L2₹17.8 L+₹58,134.50 (3.38%)Rejected-Finance R 512 KEGAON BANDHILWADI TAL URAN DISTRICT RAIGAD NAVI MUMBAI 400 702 | RAIGAD | MAHARASHTRA | 400702 | L2 | Rejected-Finance BEING NOT L1 | |
| 3 | L3₹19.7 L+₹2.5 L (14.3%)Rejected-Finance GARDEN AVENUE PLOT NO 242 243 244 RH 4 SECTOR 21 NERUL NAVI MUMBAI 400 706 | THANE | MAHARASHTRA | 400706 | L3 | Rejected-Finance BEING NOT L1 | |
| 4 | Rejected-Technical | - | Rejected-Technical NOT ADMITTED |
Tender Value
₹25 L
EMD Value
₹50,000
Closing Date
3 Jan 2022, 6:00 pmClosed
GE NW KARANJA
NAVAL STATION KARANJA URAN RAIGAD MAHARASHTRA 400704
REPAIR AND CLEANING OF SEWAGE LINES, MHS, SEPTIC TANKS ETC IN MD AND OTM ACCN IN NOFRA AREA UNDER AGE B/R-I AT NAVAL STATION KARANJA
2021_MES_490763_1
8449/E8
Open Tender
Civil Works
Item Rate
330 days
GE NW KARANJA
REPAIR AND CLEANING OF SEWAGE LINES, MHS, SEPTIC TANKS ETC IN MD AND OTM ACCN IN NOFRA AREA UNDER AGE B/R-I AT NAVAL STATION KARANJA
8 documents required · 8 mandatory
₹500
Yes
GE NW KARANJA
₹50,000
Yes
3 Feb 2022
26 Nov 2021
5 Jan 2022
26 Nov 2021
3 Jan 2022
21 Dec 2021
26 Nov 2021 - 21 Dec 2021
Amount
Demolition and breaking up 150mm dia drain pipes (salt glazed ware, AC or reinforced concrete) set in cement mortar.
Demolition and breaking up 200mm dia drain pipes (salt glazed ware, AC or reinforced concrete) set in cement mortar.
M&L reinforced concrete pipes 150mm bore, class NP2, laid and jointed complete with collars joints all as specified and directed.
M&L reinforced concrete pipes 200mm bore, class NP2, laid and jointed complete with collars joints all as specified and directed.
M&L for concrete bed for 150 mm dia pipe including packing under and haunching against the sides of pipe after they are laid and tested in cement concrete 1:4:8 type D2 usingn 40mm graded crushed stone aggregate complete all as specified and directed.
M&L for concrete bed for 200 mm dia pipe including packing under and haunching against the sides of pipe after they are laid and tested in cement concrete 1:4:8 type D2 usingn 40mm graded crushed stone aggregate complete all as specified and directed.
Cutting into the existing manhole for connecting new drain pipe 150mm internal dia metre making good to pipe and rendering cutting out existing benching for and forming branch channel (1/2 round or 3/4 section) in cement concrete (1:2:4) type B1 smooth finished even and smooth benching as required.
Cutting into the existing manhole for connecting new drain pipe 200mm internal dia metre making good to pipe and rendering cutting out existing benching for and forming branch channel (1/2 round or 3/4 section) in cement concrete (1:2:4) type B1 smooth finished even and smooth benching as required.
Excavation in trenches n'exc 1.5m wide and n'exc 1.5 mtr deep for sewage pipe line and manhole etc and getting out in soft/loose soil.
M&L for cement concrete 1:4:8 type D2 using 40mm graded aggregate as in foundation all as specified and directed.
M&L PCC 1:2:4 type B1 as in channel and benching of manholes all as specified and directed.
Extra for forming fair finished drain or channel 30 cm inner girth in cement concrete, using extra cement, including forms, moulds, mitred/stopped ends etc all as specified and directed.
Returning, filling incl spreading, levelling watreing and well rammingh in layers n'exc 25cm in soft/loose soil for sewage pipe line manholes sides and cleaning the site all as specified and directed by Engineer-in-charge.
Removing excavated material to a distance not exceeding 50m and depositing as directed by Engineer-in-charge.
Dismantling old damaged manhole cover of any size and description in any position complete all as specified and directed.
M&L for precast moulded reinforced cement concrete factory made precast moulded and vibro compacted manhole covers with necessary handles of size 900X450X100 mm medium duty confirming to IS 12592 -2002 placed in position wherever required all as directed. Note: Manhole cover shall be of "BMC pattern" precast slab as in RMC M30 obtained from approved manufacturer as directed by GE.
S&F 900X600MM Rectangular FRP mahole cover with Frame 50KN/5MT Light duty confirming to relevant EN-124 specifications. Products shall be tested as per EN-124 for load testing and permanent set.
S&F 600X600MM Rectangular FRP mahole cover with Frame 50KN/5MT Light duty confirming to relevant EN-124 specifications. Products shall be tested as per EN-124 for load testing and permanent set.
S&F 300X300MM Rectangular FRP mahole cover with Frame 50KN/5MT Light duty confirming to relevant EN-124 specifications. Products shall be tested as per EN-124 for load testing and permanent set.
S&F 710mm Dia circular FRP Mahole cover with frame 250KN/ 25MT heavy Duty confirming to relevants EN-124 specifications.Product shall be tested as per EN-124 for load Testing and permanent set.
Demolition of brick work masonary built in cement mortar including all quions arches, pillar etc all as specified and directed.
M&L for brick work with sub class 'B' bricks straight or curved on plan exc 6m mean radius built in cement mortar 1:4 all as specified and directed.
Taking down cement plaster or cement lime plaster of any description raking out joint hacking for key scrubbing down with water etc. all as specified and directed.
M&L for rendering 15mm thick on other than fair faces of brick work in CM 1:4 finished even & fair Complete all as specified and as directed.
M&L rendering 15mm thick on fair faces of brick work or concrete surfaces in CM 1:4 incl even and smooth finish Complete all as specified and as directed.
Dismantling and breakingup drain pipes AC /CI /PVC set in cement mortar 100mm bore and 75mm bore.
S&F PVC (SWR) pipes single socketed in any length with rubberring joints fixed to wall/floors 110mm bore including suitable clamps etc complete all as specified and directed.
S&F PVC (SWR) bends any radius 110mm bore.
S&F PVC (SWR) branch piece single (single 'Y') equal or unequal 110mm bore.
S&F PVC (SWR) branch piece double (single 'Y') equal or unequal 110mm bore.
S&F PVC(SWR) junction single (single T') equal or unequal 110mm bore.
S&F PVC(SWR) junction double (double T') equal or unequal 110mm bore.
S&F 75mm cast iron soil,waste and vent pipe, in any length with or without ears,with cements joints but fixed to walls including suitable clamps all as specified and directed.
S&F Cast iron branch piece single (single 'Y') equal or unequal 75mm bore.
S&F Cast iron branch piece double (single 'Y') equal or unequal 75mm bore.
S&F 100mm Cast iron vent cowels
S & F Cast iron nahani trap 100mm dia, with grating including jointing to waste pipe fixed in cement concrete type B-1 (1:2:4)
S&F PVC (SWR) floor trap 75mm dia, plain with grating including jointing with solvent cement complete all as specified and directed
S&F in repair viterous china wash down water closet pen (pedestal pattern) white (excluding fixing bolts, flushing cisterns & flush pipes) incl seat cover complete all as specified and directed.
S&F vitreous China squatting pan, ‘Orissa’ pattern, size 580 x 440 mm white, with integral foot rests (excluding flushing cistern and flush pipe) complete all as specified and directed.
Providing precast cement concrete 1:2:4 type B1 using 20mm graded stone aggregate as in cover slab and similar work including necessary formwork.
M&L Mild steel TMT bars 10mm dia and over, cut to length, bent to shape required, including cranking, bending spirally for hooping for columns, hooking ends and binding with and including mild steel wire (annealed) not less than 0.9mm dia or securing with clips all as specified and directed.
M&L cement concrete 1:2:4 tye B1 using 20mm graded stone aggregate in lintels upto 1.5m clear span, cills, steps; seismic and other similar bands, plinth courses, string courses, lacing courses, parapets and railings upto 60 cm in height, copings, kneelers, apex stones, bed plates, kerbs not provided for in Item 04028, water troughs and the like including weathering, slightly rounded or chamfered angles and throating, as directed
BLANK
Dismantling floor, hearth or wall tiling including cement mortar bedding (but not backing), removing serviceable tiles to store and rubbish off the premises all as specified and directed.
S&F Coloured Non Skid ceramic tiles 7 to 8mm thick (squares/rectangular) area of each tile exceeding 0.06 sqm but not exceeding 0.11 sqm, in floors etc. set and jointed in neat cement slurry and pointed in white or coloured cement to match over 15mm thick screed in CM(1:6) all as specified and directed.
S&F Coloured Glazed ceramic tiles in vertical surfaces 350x250mmx7mm/450x350x7mm thick set and jointed in neat cement slurry and pointed in white or coloured cement to match over 10mm thick plaster in CM(1:4) on fair face of brick or concrete surface all as specified and directed.
Demolition of cement concrete of any description in any position not otherwise specifically provided for all as specified and directed.
Hardcore of Broken stone/boulders gauge n exc. 63mm, deposited, spread & levelled in layers n exc. 15 cm thick, watered & rammed to a true surface all as specified and directed.
M&L 100mm thick cement concrete 1:2:4 type B-2 using 40mm graded stone aggregate as in paving , hardstanding and similar works all as specified and directed.
M&L 75mm thick PCC 1:3:6 type C-2 using 40mm graded stone aggregate finished even and smooth witout using extra cement as in plinth protection.
S&F Machine pressed precast conctete interlocking paver block any shape and size confirming to IS 15658-2006 of 60 mm thickness M-40 Grade all as specified and directed.
Cleaning & maintainance of solid/liquid mud/any type of solid content including mud, brick bats, empty containers of any type, rags, polythene or similar items deposited in soakwll/septic tank etc. at any depth and any size(in plan area) using SUPER SUCTION MACHINE TRUCK MOUNTED HAVING SUCTION CAPACITY 1000 TO 4000 Cum/Hrs at any location under NOFRA. Bottom surface of soakwell/septic tank should be visible after cleaning process. Sludges/sludge water/any type of waste recovered from sewage lines/manholes/inspection chambers shall be disposed off at authorized dumping site declared by local administration outside Ministry of defence land complete all as specified and as directed by the engineer in charge. NOTE NO:- 01 a) Once cleared will be maintained through out the period of the contract for free flow. If there is any blockage during the period of the contract, the same will be cleared without any extra cost by the contractor.
Cleaning & maintainance of solid/liquid mud/any type of solid content including mud, brick bats, empty containers of any type, rags, polythene or similar items deposited in manhole etc. at any size(in plan area) and any depth, using SUPER SUCTION MACHINE TRUCK MOUNTED HAVING SUCTION CAPACITY 1000 TO 4000 Cum/Hrs at any location under NOFRA. Bottom surface of manholes should be visible after cleaning process. Sludges/sludge water/any type of waste recovered from manholes shall be disposed off at authorized dumping site declared by local administration outside Ministry of defence land complete all as specified and as directed by the engineer in charge. NOTE NO:- 01 a) Once cleared will be maintained through out the period of the contract for free flow. If there is any blockage during the period of the contract, the same will be cleared without any extra cost by the contractor. NOTE NO:- 02 i) Work done of item No 54 shall be completed within one month after handing over of site (either full or in phased manner and no any claim shall be admissible on this account in later stage) to the contractor . However period of completion is 330 days of the whole work/BOQ. Four months has been reserved for output performance of sewage (ii) Payment shall be made to the contractor against the work done as under:- (a) 70% after one month from date of cleaning the sewage line on alloted site. (b) 10% after two months from the date of cleaning the sewage line on alloted site. (c) 10% after three months from the date of cleaning the sewage line on alloted site. (d) 10% (in the final RAR.
Cleaning & clearing of any size of bore underground/above ground sewage line from any type of trap (WCs/Gully trap/ floor traps/CI pipes/Nahani traps/Bathrooms etc) upto 1st Manhole of any description from ground floor to forth floor(both vertical and horizontal) including scafolding and safety measures and at any height/depth by removing any type of blockage including de-silting and de-chocking (Sludge / sludge water shall be disposed off at authorized dumping site declared by local administration outside MD land complete all as specified and as directed by Engr-in-Charge. NOTE No-1 :- (a) The complaint shall be attended on the same day and complaints slips duly signed by the user will be deposited back to the JE(Civil) on the same day (b) A penalty of Rs 200/- per complaint will be levied in case complaint not rectified by the contractor on the same day. (c) A pucca bound register shall be maintained for this purpose which shall always be kept in the custody of JE Civil indicating date and time of complaint informed and rectified respectively.
NOTE No-2 :- (a) The contractor shall deploy minium 01 safaiwala, 01 helper (Total 02 people ) alongwith T&P to attend the complaints. The contractor/his rep will report to JE (Civil) in complaint cell/service centre of AGE B/R-I under GE(NW) Karanja between 0900 to 0930 hrs (except on Sunday/Gazetted holidays). (b) The complaints shall be attended on the same day and complaints slips duly signed by the user will be depo sited back to JE (Civil) on the same day . (c) Working time for all people employed the contractor will be from 0900 to 1700 hrs . In case of emergency , they can be called any time beyond specified time and will be given off at the discretion of Engr-in-charge (d) A penalty of Rs 200/- per day per person will be levied in case of absence of any safaiwala or helper (e) A pucca bound register shall be mainted for this purpose which shall always be maintained in the custody of JE (Civ) indicating date and time of complaint informed and rectified respectively. (f) Man power /employees deployed by contractor shall have saftey measures for the job and life insurance policy for compensation in case of any accident. The cost for the same is deemed to be included in the unit quoted rate by the bidder . No extra claim shall be entertained by the department
Cleaning & clearing of any size of bore underground/above ground sewage line from any type of trap (WCs/Gully trap/ floor traps/CI pipes/Nahani traps/Bathrooms etc) upto 1st Manhole of any description from fifth floor to top floor(both vertical and horizontal) including scafolding and safety measures and at any height/depth by removing any type of blockage including de-silting and de-chocking (Sludge / sludge water shall be disposed off at authorized dumping site declared by local administration outside MD land complete all as specified and as directed by Engr-in-Charge. NOTE No-1 :- (a) The complaint shall be attended on the same day and complaints slips duly signed by the user will be deposited back to the JE(Civil) on the same day (b) A penalty of Rs 200/- per complaint will be levied in case complaint not rectified by the contractor on the same day. (c) A pucca bound register shall be maintained for this purpose which shall always be kept in the custody of JE Civil indicating date and time of complaint informed and rectified respectively.
NOTE No-2 :- (a) The contractor shall deploy minium 01 safaiwala, 01 helper (Total 02 people ) alongwith T&P to attend the complaints. The contractor/his rep will report to JE (Civil) in complaint cell/service centre of AGE B/R-I under GE(NW) Karanja between 0900 to 0930 hrs (except on Sunday/Gazetted holidays). (b) The complaints shall be attended on the same day and complaints slips duly signed by the user will be depo sited back to JE (Civil) on the same day . (c) Working time for all people employed the contractor will be from 0900 to 1700 hrs . In case of emergency , they can be called any time beyond specified time and will be given off at the discretion of Engr-in-charge (d) A penalty of Rs 200/- per day per person will be levied in case of absence of any safaiwala or helper (e) A pucca bound register shall be mainted for this purpose which shall always be maintained in the custody od JE (Civ) indicating date and time of complaint informed and rectified respectively (f) Man power /employees deployed by contractor shall have saftey measures for the job and life insurance policy for compensation in case of any accident. The cost for the same is deemed to be included in the unit quoted rate by the bidder . No extra claim shall be entertained by the department . (g) Five complaints will be counted as Each Job for payment purpose.
Cleaning of sewage line of any dia by roding or any other suitable method to clean the sludge/blockage inside the sewage line and well flushing with water to drainage the sludge etc. cease the flow of sewage incl removing and refixing the manhole cover all as specified and directed NOTE NO:-1. Once cleared will be maintained through out the period of the contract for free flow. If there is any blockage during the period of the contract, the same will be cleared without any extra cost by the contractor. NOTE NO:-2. i) Work done of item No 57 shall be completed within one month after handing over of site (either full or in phased manner and no any claim shall be admissible on this account in later stage) to the contractor . However period of completion is 330 days of the whole work/BOQ. Four months has been reserved for output performance of sewage (ii) Payment shall be made to the contractor against the work done as under:- (a) 70% (after one month from date of cleaning the sewage line on alloted site). (b) 10% (after two months from the date of cleaning the sewage line on alloted site). (c) 10% (after three months from the date of cleaning the sewage line on alloted site). (d) 10% (in the final RAR).
Demolition of cement concrete of any description in any position not otherwise specifically provided for.
Water proofing treatment to sunken floor of RCC slab as following steps-
(a) After cleanig the surface applying a coat of cement slurry @ 3kg/sqm and 15mm thick cement plaster in 1:3 with WPC @ weight of cement on bottom/sides of RCC.
(b) Applying first coat of chemical pidifin 2K (DR Fixit or equivalent) on cleaned plastered surfaces @ 0.86 kg/sqm (min) as recommended by manufacturers. Then Provide a layer glass fibre mesh of size 2.25mm x 2.25mm (45 GSM) over first coat of chemical pidifin 2K as manufactures recommendations after that Apply second coat of chemical pidifin 2K (DR Fixit or equivalent) @ 0.86 kg/sqm (min) layer glass fibre mesh as recommended by manufacturers.
(c) Spouts of 40mm dia PVC pipes projecting at least by 150mm clear of face of the outer wall.
(d) 30 mm thick PCC 1:2:4 type B1 using 20mm graded stone aggregate mixed with WPC @ 3% by weight of cement shall be provided on bottom.
(e) 15mm thick cement plaster in 1:3 with WPC @ by weight of cement on sides of RCC.
(f) After laying of CI connections apply two coats of hot bitumen 85/25 grade @ 1.7 kg/sqm over vertical sides and floor of sunken portion.
(g) The sunken portion shall be filled with PCC 1:7:12 type F2 using 40mm brick aggregate after carrying out required test for joints/water proofing. Note 1:- The treatment shall also be provided over side wall upto a ht of 150 mm above FFL Note 2:- Water proofing treatment will be carried out through authorised applicators approved by GE and testing charge included in item rate.
M&L 40 mm thick, Cement concrete 1:2:4, type B1 (using 20 mm graded stone aggregate)as in floors finished even and smooth using extra cement.
Pheonix Engineers & Contractors
M/s S.D Construction Co
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .