| 1 | L1₹27.9 CrAccepted-AOC | ₹27.9 Cr | L1 | Accepted-AOC Work is awarded to the evaluated L1 bidder |
| 2 | Rejected-Technical | - | - | Rejected-Technical Techno-Commercially disqualified due to non fulfillment of Technical Qualifying Requirement as per Clause 6.2 of DNIB. |
| 3 | Rejected-Technical NIRJULI SHORT CUT PO PS NIRJULI PAPUM PARE ARUNACHAL PRADESH 791109 | NIRJULI | PAPUM PARE | ARUNACHAL PRADESH | 791109 | - | - | Rejected-Technical Techno-Commercially disqualified due to non fulfillment of Technical Qualifying Requirement as per Clause 6.2 of DNIB. |
| 4 | Rejected-Technical | - | - | Rejected-Technical Techno-Commercially disqualified due to non fulfillment of Technical Qualifying Requirement as per Clause 6.2 of DNIB. |
| 5 | Rejected-Technical | - | - | Rejected-Technical Techno-Commercially disqualified due to non fulfillment of Qualifying Requirements as per Clause 6 of DNIB. |
Tender Value
₹25.8 Cr
Closing Date
23 Dec 2021, 2:00 pmClosed
CGM(C), i/c C and P, NEEPCO Ltd., Shillong
CGM(C), I/c C and P, NEEPCO Ltd., Shillong
CONSTRUCTION OF PLUNGE POOL AND EXTENSION OF APRON AT D/S OF BICHOM DAM UNDER KAMENG H.E. PLANT, ARUNACHAL PRADESH
2021_NEEPC_95299_1
NIB No. 406 DATED 18-11-202
Open Tender
Civil Works
780 days
Kameng H.E. Plant, A.P.
As per Bid document
3 documents required · 3 mandatory
₹11,800
Yes
NEEPCO Ltd.
Exempted
4 May 2022
18 Nov 2021
24 Dec 2021
18 Nov 2021
23 Dec 2021
18 Nov 2021
18 Nov 2021 - 1 Dec 2021
Amount
Earthwork in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of deleteriuos matter, dressing of sides and bottom and removal of excavated material as per direction of the department.
i) Ordinary Soil
B) By Mechanical Means
(ii) In Ordinary rock (Not requiring blasting)
B) By Mechanical Means
(iii) In hard rock requiring blasting
A) By Mannual Means/ Mechanical Means
B) Line Drilling/ Drilling of Dummy Holes
(iv) In hard rock (blasting prohibited)
A) By Mechanical Means
Plain and Reinforced cement concrete in open foundation complete including cost of formwork and nominal dewatering as per drawing and technical specification
RCC Grade M25
Reinforced cement concrete in Sub Structure complete including cost of formwork as per drawing and technical specification
A) RCC Grade M25 upto 5.0m height
Reinforced cement concrete in Super-Structure complete including cost of formwork as per drawing and technical specification
A) RCC Grade M25 (height 5.0m and above)
Supplying, fitting and placing of HYSD bar reinforcement complete as per drawing and technical specifications including all lead and lift
A) In sub-structure
B) In super-structure
Drilling holes up to 38mm dia. for Grouted Anchors and other purposes complete in all respect with all plant, materials and labour a sper drawing and specification and direction of Engineer In Charge.
Grouting of Anchor hole with Cement grout including all labour and material as directed by the Engineer In Charge
100 mm thick Shotcrete as per drawing & specification and instruction of Engineer in charge
Welded wire mesh for shotcrete as per drawing and specification and instruction of Engineer in charge.
Drilling 48 mm dia hole for laying drainage pipe and other purposes as per drawing and specification and as directed by Engineer in charge.
Supply, fitting and fixing 36mm dia PVC drainage pipe as per drawing and specification and as directed by Engineer in charge.
Supply, fitting & fixing Geo Textile on slopes as per drawing and specification and as directed by Engineer in Charge.
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)
Backfilling behind abutment, wing wall and return wall complete as per drawing and technical specification (A) Granular Materials
Coursed rubble masonry with hard stone in foundation and plinth in cement mortar 1 : 6 ( 1 - cement : 6 - fine sand) including all lead and lift.
12 mm cement Plaster 1:6 (1 - Cement : 6 - Sand)
Dewatering including cost of using all machinery, pipe line & fittings and labour complete as per direction of the Engineer in Charge.
Design & Engineering, Execution and Maintenance throughout the execution period of Diversion Arrangement for leakage water from Radial Gates for a maximum discharge of 1.5 Cumec.
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid