Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.9 LAccepted-AOC | ₹5.9 L | L1 | Accepted-AOC R1 |
| 2 | L2₹5.9 LRejected-Finance | ₹5.9 L | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | Vijayan L2 | P.Venkadesh L1 |
|---|---|---|---|---|---|
| 1.00Main Estimate | |||||
| 2.00 | Dismantling and removing damaged Terracing work in roof Pressed tiles (2/3 area) including all labour chargesetc.,Complete. | 71.04 | cum | 83 ₹5,896.32 | 82 ₹5,825.28 |
| 3.00 | Brick jelly lime concrete using 20mm brick jelly with slacked lime in the ratio of 32:12.5 including cost and conveyance of all materials to site and all labour charges for mixing , laying ,and finishing etc complete | 7.99 | sqm | 4,106 ₹32,806.94 | 4,105 ₹32,798.95 |
| 4.00 | Finishing the top of roof with one course of PRESSED TILES of size 23 cm X 23 cm X 2 cm laid in cement mortar 1:3 (One cement and three Sand) 12mm thick mixed with water proofing compound conforming to I.S. at 2% by weight. | 116.68 | sqm | 1,327 ₹1.5 L | 1,326 ₹1.5 L |
| 5.00 | Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete. | 134.67 | sqm | 310 ₹41,747.70 | 309 ₹41,613.03 |
| 6.00 | Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc | 160.11 | sqm | 283 ₹45,311.13 | 282.5 ₹45,231.08 |
| 7.00 | Supplying and fixing P.V.C rainwater down fall pipe of 110mm dia with necessary shoes, bends,& clamps etc., | 24 | sqm | 564 ₹13,536 | 563.5 ₹13,524 |
| 8.00 | Distempering two coats using best quality and approved colour of oil bound distemper over one coat of cement paint primer including all cost and conveyance of materials, labour charges etc., complete. | 383.48 | sqm | 212 ₹81,297.76 | 211.5 ₹81,106.02 |
| 9.00 | Exterior Emulsion painting two coats with best approved quality and colour emulsion paint over one coat of Base coat including cost and convyance of all materials to work site and labour charges etc., complete. | 266.81 | sqm | 269 ₹71,771.89 | 268.5 ₹71,638.49 |
| 10.00 | Painting with approved colour Over old Iron work including cost and conveyance and labour charges etc., complete. | 93.66 | sqm | 157 ₹14,704.62 | 156 ₹14,610.96 |
Tender Value
₹6.4 L
EMD Value
₹6,370
Closing Date
25 Feb 2026, 3:00 pmClosed
BDO (B.PT)
KEELAPAVOOR PANCHAYAT UNION
Renovation of Community Hall building at Melakrishnaperi Village in Melakrishnaperi Panchayat in kelapavoor Union in Keelapavoor Panchayat Union Tenkasi District
2026_RDTN_662897_1
Melakrishnaperi Renovation of Community Hall building
Open Tender
Civil Works
KEELAPAVOOR
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹6,370
Yes
16 Mar 2026
20 Feb 2026
25 Feb 2026
20 Feb 2026
25 Feb 2026
20 Feb 2026
20 Feb 2026 - 25 Feb 2026
Main Estimate
Dismantling and removing damaged Terracing work in roof Pressed tiles (2/3 area) including all labour chargesetc.,Complete.
Brick jelly lime concrete using 20mm brick jelly with slacked lime in the ratio of 32:12.5 including cost and conveyance of all materials to site and all labour charges for mixing , laying ,and finishing etc complete
Finishing the top of roof with one course of PRESSED TILES of size 23 cm X 23 cm X 2 cm laid in cement mortar 1:3 (One cement and three Sand) 12mm thick mixed with water proofing compound conforming to I.S. at 2% by weight.
Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete.
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
Supplying and fixing P.V.C rainwater down fall pipe of 110mm dia with necessary shoes, bends,& clamps etc.,
Distempering two coats using best quality and approved colour of oil bound distemper over one coat of cement paint primer including all cost and conveyance of materials, labour charges etc., complete.
Exterior Emulsion painting two coats with best approved quality and colour emulsion paint over one coat of Base coat including cost and convyance of all materials to work site and labour charges etc., complete.
Painting with approved colour Over old Iron work including cost and conveyance and labour charges etc., complete.
Provision for Electrification works
Fan Points
Light Points
b)SD36 (Plug Point)
a)Supply and fixing of single box type 4'40 W flu fitting complete with copper choke and condensor with TW
d)Supply of (15W LED bulb)SD.80
e)SD83 ( WT Bulk head fitting 15W LED bulb)
f)SD110 (Supply and fixing of 1200 mm (48") AC ceiling fan complete with stepped electronic 300W regulator with 300mm down rod on the existing clamp.)
GST Amount for providing Service to Government Contract Works for the above RENEWAL Works. { GST Amount is the Total GST Amount for overall quoted amount above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_795816.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.17 MB
BOQ_795816.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid