| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.5 LAccepted-AOC VADIVELAYYANAYAM | ₹10.5 L | L1 | Accepted-AOC Low |
| 2 | L2₹10.6 LRejected-AOC | ₹10.6 L | L2 | Rejected-AOC High |
| Sl No | Description | Qty | Unit | Murugesan L1 | M/s Sri Kumaran Borewells L2 |
|---|---|---|---|---|---|
| 1.00Construction of Padithurai via Noyyal River at Seengupathy H/o Madvarayapuram Panchayat | |||||
| 2.00 | Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete
Footing and Grade beam | 118.13 | M3 | 263.58 ₹31,136.71 Lowest | 265 ₹31,304.45 |
| 3.00 | Cement Concrete 1:4:8 (One Cement, Four M.Sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification
Footing and Grade beam | 7.88 | M3 | 5,730.59 ₹45,157.05 Lowest | 5,735 ₹45,191.8 |
| 4.00Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. (Payment for centering shall be given after the concrete is laid) Below GL | |||||
| 5.00 | footing | 24 | M3 | 546.5 ₹13,116 Lowest | 548 ₹13,152 |
| 6.00 | For Roof and sundhade | 115.02 | M2 | 1,094 ₹1,25,831.88 Lowest | 1,100 ₹1,26,522 |
| 7.00 | For Column | 24.75 | M2 | 1,203.5 ₹29,786.63 Lowest | 1,208 ₹29,898 |
| 8.00 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire) | 3.1 | MT | 91,937.4 ₹2,85,005.94 Lowest | 91,939 ₹2,85,010.9 |
| 9.00 | Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers | 35.48 | M3 | 9,614.83 ₹3,41,134.17 Lowest | 9,618 ₹3,41,246.64 |
| 10.00 | Hand Rail provision | 1 | No | 22,000 ₹22,000 Lowest | 22,500 ₹22,500 |
Tender Value
₹10.7 L
EMD Value
₹10,690
Closing Date
11 Mar 2026, 3:00 pmClosed
Special Officer, Madvarayapuram
Panchayat Office, Madvarayapuram Panchayat
Construction of Padithurai via Noyyal River at Seengupathy H/o Madvarayapuram Panchayat
2026_RDTN_671614_1
1/2023-2024/FRA MP
Open Tender
Civil Works
Item Rate
Seengupathy
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹10,690
Yes
Panchayat Office, Madvarayapuram Panchayat
13 Mar 2026
6 Mar 2026
11 Mar 2026
6 Mar 2026
11 Mar 2026
6 Mar 2026
10 Mar 2026
Construction of Padithurai via Noyyal River at Seengupathy H/o Madvarayapuram Panchayat
Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete Footing and Grade beam
Cement Concrete 1:4:8 (One Cement, Four M.Sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification Footing and Grade beam
Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. (Payment for centering shall be given after the concrete is laid) Below GL
footing
For Roof and sundhade
For Column
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire)
Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers
Hand Rail provision
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.51 MB
PBPADUTHURAIMP.pdf
Tender Documents • 0.34 MB
TBPADUTHURAIMP.pdf
Tender Documents • 0.38 MB
BOQ_807088.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].