Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹9.3 L
EMD Value
₹18,657
Closing Date
19 Dec 2025, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Office of the Executive Engineer, Tamluk Division,
Office of the Executive Engineer,Tamluk Division, P.H.Engg. Dte.P.H.E. Complex 1st floor, Parbatipur,Tamluk, Purba Medinipur 721636
Laying of Distribution pipe line by HDPE pipes after Re-desing LDS Drawing with allied works of Taladiha its adjoining moujas PWSS in Patashpur I Block under Contai Sub Division of Tamluk Division, PHE Dte. Purba Medinipur district.
2025_PHED_953959_1
EE/TD/NIeT_24/24-25 3rdCall SL 01
Open Tender
CIVIL WORKS
Percentage
25 days
Patashpur-I Block
Please refer Tender documents.
2 documents required · 2 mandatory
₹18,657
Office of the Executive Engineer,Tamluk Division,
12 Dec 2025
21 Nov 2025
22 Dec 2025
21 Nov 2025
19 Dec 2025
24 Nov 2025
24 Nov 2025
Supplying HDPE (Materials grade PE-100) pipes conforming to IS 4984- 1995 with latest revision & amendments if any with necessary HDPE specials (excluding cost of CIDF valves) including labour charges for earth work in excavation in any kind of soil including mixed soil with boulder,road sub-grade and aits flank but excluding moorum laterite or sand stone / hard rock cutting with chisel required including cutting road flank/ brick pavement etc. without damaging the exisiting telephone/electrical cable line etc.(in case of damage of any type of cable line by the agency at the time of execution necessary damage charge as applicable by the respective authority will have to be brone by the agency at his own cost)upto the depth (av.) so as to maintain 1.10m.earth cushion from top of the pipe upto G.L. including loading unloading carrying lowering laying fitting fixing carefully pipes, valves and specials with the all types of jointing materials in trenches maintaining proper levels and alignment jointing the pipes and specials by butt welding/ adopting suitable method (But weld jointing with help of hydraulic tack and trimming machines, Hitter etc. for reaching at necessary melting point of HDPE pipe so that joint can be monolithic) so as to facilitate the maintenance of pipe line locally as per conventional method in future.
(A) Pressure Rating : PN 6
(ii) Laying of pipe line including cost of pipe & fittings/specials but excluding cost of valves.
Filling the pipe line with water, testing hydraulically as per I.S 3114-1965 (Article-6) in section of a length not exceeding 500mtr. for head of pressure as per specification including supplying installing and fixing all equipments such as diesel pump set, blank flange, pressure gauge, valve, pressure pump and all other tools and plants including drilling topping and plugging of necessary holes to pipes, blocking ends providing temporary thrust block and subsequent blocking of holes and other jointing materials and dismantling and removal of the same including disposal of water etc. all complete as per specification and direction of EIC. The rate is inclusive of cost of requisite water to be arranged by the contractor (Recovery rate of water @ Rs.10.00/m3, if contractor used water from deptt. source).
For UPVC/HDPE Pipe
Cleaning thoroughly the inner surface of pipe line including specials and valves by flushing with water and subsequently disinfection of the samepipe line by flushing again with water containing bleaching powder resulting in residual chlorine not less than 15mg/ltrs. after 24hrs. of such filling including laboratory testing of water samples obtain from the disinfested pipe line and disposal of water from the pipe line after completion of the work. The rates including of cost of requisite water to be arranged by the contractor) (The rate of water @Rs. 10/m3 may be recovered, if the contractor used water from deptt. source).
For UPVC/HDPE Pipe
Submission of complete detailed drawing of distribution system, rising main etc. after execution of work showing position of different types of valves, fittings/specials sluice valve chamber with location, node to node wise in the sanctioned drawing as completion drawing of the water supply scheme as per direction and satisfaction of EIC. The list of dia wise fitting/specials, different pipes ;of valve used in the rising main should be shown in the completion drawing (not separate) with verified by SAE & AE in-charge of the scheme. The above drawing will be submitted in 5 copies.
Add GST@18% (CGST@9% + SGST@9%)
Add Cess@1%
stage.html
html • 0.02 MB
cancelled_1.pdf
pdf • 0.19 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.74 MB
BOQ_2293238.xls
BOQ • 0.35 MB
WBF2911.pdf
Tender Documents • 2.20 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .