Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.5 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹12.7 L+₹26,505.30 (2.13%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹13.3 L+₹81,445.50 (6.54%)Admitted-Finance | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | JYOTI CONSTRUCTION INCORPORATION L1 | M Abdul Hameed L2 | KMS CONSTRUCTION L3 |
|---|---|---|---|---|---|---|
| 1.00Providing and applying tack coat using hot straight run bitumen of grade VG - 10, including heating the bitumen, spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler, cleaning and preparing the existing road surface as per specifications : | ||||||
| 1.10 | On bituminous surface @ 0.50 Kg/sqm | 603.3 | Sqm | 70 ₹42,231 Lowest | 72 ₹43,437.6 | 90 ₹54,297 |
| 2.002 cm premix carpet surfacing with 1.8 cum and 0.90 cum of stone chippings of 13.2 mm size and 11.2 mm size respectively per 100 sqm and 52 kg and 56 kg of hot bitumen per cum of stone chippings of 13.2 mm and 11.2 mm size respectively, including a tack coat with hot straight run bitumen, including consolidation with road roller of 6 to 9 tonne capacity etc. complete (tack coat to be paid for separately).( Use shredded plastic @10% of total bitumen i.e 90% VG-30 & 10% shredded plastic) | ||||||
| 2.10 | With paving Asphalt grade VG - 30 with no solvent | 603.3 | Sqm | 350 ₹2,11,155 | 410 ₹2,47,353 | 300 ₹1,80,990 Lowest |
| 3.00Providing and laying Bitumen Penetration Macadam with hard stone aggregate of quality, size and grading as specified, with bitumen of suitable penetration grade, including required key aggregate as specified, spreading coarse aggregate with the help of self propelled/ tipper tail mounted aggregate spreader and applying bitumen by a pressure distributor and then spreading key aggregate with the help of aggregate spreader complete, including consolidation with road roller of minimum 8 to 10 tonne capacity to achieve specified values of compaction and surface accuracy : | ||||||
| 3.10 | For 50mm compacted thickness using coarse aggregate of size 50-20 mm graded @ 0.60 cum per 10 sqm key aggregate of size 12.5 mm graded @ 0.15 cum per 10 sqm. With paving asphalt grade VG - 10 @ 50 kg/ 10 sqm. | 603.3 | Sqm | 700 ₹4,22,310 Lowest | 710 ₹4,28,343 | 800 ₹4,82,640 |
| 3.20 | For 75 mm compacted thickness in two layers using stone aggregate of size 63-41 mm graded @ 0.90 cum per 10 sqm key aggregate of size 20.0 mm graded @ 0.18 cum per 10 sqm. With paving asphalt grade VG - 10 @ 68 kg/ 10 sqm. | 433.03 | Sqm | 900 ₹3,89,727 | 840 ₹3,63,745.2 Lowest | 900 ₹3,89,727 |
| 4.00 | Providing and laying seal coat of premixed fine aggregate ( passing 2.36 mm and retained on 180 micron sieve) with bitumen using 128 kg of bitumen of grade VG - 10 bitumen per cum of fine aggregate and 0.60 cum of fine aggregate per 100 sqm of road surface, including rolling and finishing with road roller all complete. | 603.3 | Sqm | 135 ₹81,445.5 Lowest | 150 ₹90,495 | 200 ₹1,20,660 |
| 5.0005 Years Maintenance Provision. | ||||||
| 5.10 | 1st Year 0.25% of Upgradation amount | 1 | Job | 3,283 ₹3,283 Lowest | 3,283 ₹3,283 Lowest | 3,283 ₹3,283 Lowest |
Tender Value
₹14.1 L
EMD Value
₹28,234
Closing Date
10 Nov 2025, 3:00 pmClosed
Executive Engineer
Executive Engineer (PRI) South Andaman Division-I No. J/4, Old Councilor Bungalow, Junglighat, Sri Vijaya Puram, South Andaman
Repair and Maintenance of Rural Road from main road Dundas Point to Prem Prakash house at W.No. 04 under Gram Panchayat Namunaghar.
2025_RDPRI_20368_1
EE/PRI/SAD-I/RR(CCA)/25-26/127
Open Tender
Civil Works - Roads
Works
120 days
Namunaghar
Please refer Tender documents.
7 documents required · 7 mandatory
₹500
Executive Engineer, GPPS
₹28,234
13 Nov 2025
28 Oct 2025
11 Nov 2025
29 Oct 2025
10 Nov 2025
29 Oct 2025
Amount
Providing and applying tack coat using hot straight run bitumen of grade VG - 10, including heating the bitumen, spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler, cleaning and preparing the existing road surface as per specifications :
On bituminous surface @ 0.50 Kg/sqm
2 cm premix carpet surfacing with 1.8 cum and 0.90 cum of stone chippings of 13.2 mm size and 11.2 mm size respectively per 100 sqm and 52 kg and 56 kg of hot bitumen per cum of stone chippings of 13.2 mm and 11.2 mm size respectively, including a tack coat with hot straight run bitumen, including consolidation with road roller of 6 to 9 tonne capacity etc. complete (tack coat to be paid for separately).( Use shredded plastic @10% of total bitumen i.e 90% VG-30 & 10% shredded plastic)
With paving Asphalt grade VG - 30 with no solvent
Providing and laying Bitumen Penetration Macadam with hard stone aggregate of quality, size and grading as specified, with bitumen of suitable penetration grade, including required key aggregate as specified, spreading coarse aggregate with the help of self propelled/ tipper tail mounted aggregate spreader and applying bitumen by a pressure distributor and then spreading key aggregate with the help of aggregate spreader complete, including consolidation with road roller of minimum 8 to 10 tonne capacity to achieve specified values of compaction and surface accuracy :
For 50mm compacted thickness using coarse aggregate of size 50-20 mm graded @ 0.60 cum per 10 sqm key aggregate of size 12.5 mm graded @ 0.15 cum per 10 sqm. With paving asphalt grade VG - 10 @ 50 kg/ 10 sqm.
For 75 mm compacted thickness in two layers using stone aggregate of size 63-41 mm graded @ 0.90 cum per 10 sqm key aggregate of size 20.0 mm graded @ 0.18 cum per 10 sqm. With paving asphalt grade VG - 10 @ 68 kg/ 10 sqm.
Providing and laying seal coat of premixed fine aggregate ( passing 2.36 mm and retained on 180 micron sieve) with bitumen using 128 kg of bitumen of grade VG - 10 bitumen per cum of fine aggregate and 0.60 cum of fine aggregate per 100 sqm of road surface, including rolling and finishing with road roller all complete.
05 Years Maintenance Provision.
1st Year 0.25% of Upgradation amount
2nd Year 1.00% of Upgradation amount
3rd Year 1.50% of Upgradation amount
4th Year 2.00% o f Upgradation amount
5th Year 2.75% of Upgradation amount
M Abdul Hameed (BID ID -60349)
KMS CONSTRUCTION (BID ID -60160)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .