| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹47.2 LAccepted-AOC | ₹47.2 L | 1 | Accepted-AOC Tender Coated As per Estimated Amount |
| 2 | 2₹49.1 LRejected-Finance | ₹49.1 L | 2 | Rejected-Finance Tender Coated Above Estimated Amount |
| Sl No | Description | Qty | Unit | MRP Infratech Private Limited L2 | K.JAGANATHAN L1 |
|---|---|---|---|---|---|
| 1.00 | Providing and laying Tack coat over BT surface using 3Kg of bitumen 60/70 for 10sqm area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat | 5,313 | Sqm | 36 ₹1.9 L | 34.1 ₹1.8 L |
| 2.00 | Providing and laying 50mm compacted thickness bituminous macadem using 0.42Cum of 26.5-11.2mm metal and 0.10cum of 11.2-2.80mm metal and 0.18cum of 2.80mm metal and below with 38Kgs of bitumen for premixing 10 sqm including cost and conveyance of all mate | 265.65 | cum | 8,800 ₹23.4 L | 8,745 ₹23.2 L |
| 3.00 | BITUMINOUS CONCRETE 25/30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5 | 132.83 | cum | 12,279 ₹16.3 L | 11,279 ₹15.0 L |
| 4.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}18% | 1 | GST Amount | 7,48,801.36 ₹7.5 L | 7,20,444.98 ₹7.2 L |
Tender Value
₹47.7 L
EMD Value
₹48,000
Closing Date
13 Jan 2026, 3:00 pmClosed
The Block Developement Office (VP)
St Thomas Mount Panchayat union
Providing BT Road to Sithalapakkam to Nookampalayam Road in Perumbakkam Panchayat at punithathomaiyarmalai Panchayat Union. 14th CFC Fund Having PKG NO 08 Estimate Amount Rs 47.73 Lakhs
2026_RDTN_640388_1
0019/2026/B2, dt. 05.01.2026,
Open Tender
Civil Works - Roads
120 days
PERUMBAKKAM
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹48,000
Yes
12 Feb 2026
7 Jan 2026
13 Jan 2026
7 Jan 2026
13 Jan 2026
7 Jan 2026
Providing and laying Tack coat over BT surface using 3Kg of bitumen 60/70 for 10sqm area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat
Providing and laying 50mm compacted thickness bituminous macadem using 0.42Cum of 26.5-11.2mm metal and 0.10cum of 11.2-2.80mm metal and 0.18cum of 2.80mm metal and below with 38Kgs of bitumen for premixing 10 sqm including cost and conveyance of all mate
BITUMINOUS CONCRETE 25/30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}18%
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_766828.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.23 MB
TENDER.pdf
Tender Documents • 0.54 MB
BOQ_766828.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid