Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹3.5 L
Closing Date
15 Jul 2026, 3:00 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (RSP)
44 conditions · 6 needing a document upload
The tender shall submit the following documents for their credential.
Bid Security: Payment receipt of Bid Security submission.
The bidder who claims exemption of Bid Security Deposit shall submit documentary evidence for the same as mentioned above. Without such documentary evidence, their offer will lead to summarily rejection of their offer.
The bidders who do not claim exemption to Bid Security Deposit shall submit the documentary evidence of Bid Security deposit.
Documentary evidence in support of Special Financial Criteria
Submission of Annexure-V(A) (If applicable)
Submission of Annexure-VI(B) (If applicable)
Documentary evidence in support of Special Technical Criteria.
Documents to be Submitted Along with Tender as applicable
For details regarding Para 1.4 above of check list, please refer Para 14 of Tender Form Second Sheet of The General conditions of contract for works April 2022 with all correction slips/amendments.
Declaration regarding association of the tenderer with serving/retired Gazette Railway Officer(s). In connection with para 3 of technical-compliance Declaration to be submitted by the tenderer along with the tender. Note- If no serving/retired Gazette Railway Officer(s), then please write "NIL".
The Tender form first and Second sheet uploaded in document section of tender as Tender form first and Second sheet (Tenderformfirstsheetsecondsheet.pdf) is to be mandatorily filled, stamped, signed and uploaded along with the offer
List of Personnel, Organization available on hand and proposed to be engaged for the subject work.
List of Plant & Machinery available on hand (own) and proposed to be inducted (own and hired to be given separately) for the subject work.
For all the tenders having advertised cost of Rs 10 lakh or above, the contractor shall have the option to take payment from Railways through a letter of credit (LC) arrangement as per RB's letter No.2018/CEI/CT/9, dated:04.06.2018 copy of which is enclosed in Document Section.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Retrofitment of SS Pipelines in Air Brake System of Coaches.
ICF-SS-Pipeline-250-R2
ICF-SS-Pipeline-250-R2
Open
Works - General
12 Months
Paschim Medinipur, West Bengal
₹0
₹3.5 L
15 Jul 2026
23 Jun 2026
1 Jul 2026
3 items across 1 schedule
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 1,72,92,365 | ||
| — | 250.00 | — | — | ||
| Retrofitment of SS Pipelines in Air Brake System of Coaches. (Advertised rate/cost is inclusive of cost of material, labour Cost for fitment, Cost for consumables, machineries, PPEs & uniforms along with all taxes, duties & GST etc.) | — | — | — | 1,72,92,365 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
2025_01_09IIndianRailwaysStandardGeneralConditionsofContractApril-2022AdvanceCorrectionSlipNo_9ACS-9.pdf
ATTACHMENT
10 GCC April
ATTACHMENT
Annexure-VA.pdf
ATTACHMENT
Annexure-VIB.pdf
ATTACHMENT
Tenderformfirstsheetsecondsheet.pdf
ATTACHMENT
AdvanceCorrectionSlipNo_112026_03_13IndianRailwaysStandardGeneralConditionsofContractApril2022_compressed.pdf 11 GCC April
ATTACHMENT
Annexure-I.pdf
ATTACHMENT
Annexure-II.pdf
ATTACHMENT
RBLetternewlaborcode.pdf
ATTACHMENT
IRStandardGCCApril2022.pdf
ATTACHMENT
2022_CE-I_CT_GCC-2022Policy14_07_2022_1.pdf
ATTACHMENT
2022_12_13RBCE_CE-I-CTIndianRailwaysStandardGeneralConditionsofContractApril2022ACSNo_2.pdf
ATTACHMENT
3 GCC April
ATTACHMENT
4 GCC April
ATTACHMENT
5 GCC April
ATTACHMENT
2023_12_21IndianRailwaysStandardGeneralConditionsofContractApril-2022AdvanceCorrectionSlipNo_6ACS-61.pdf
ATTACHMENT
2024_09_25IndianRailwaysStandardGeneralConditionsofContractApril-2022AdvanceCorrectionSlipNo_7ACS-7.pdf
ATTACHMENT
2024_12_20IndianRailwaysStandardGeneralConditionsofContractApril-2022AdvanceCorrectionSlipNo_8ACS-8.pdf
ATTACHMENT
ScopeofWork_1.pdf
ATTACHMENT
SpecialConditionsofcontract.pdf
ATTACHMENT
2018_CE-I_CT_9Date04_06_2018.pdf
ATTACHMENT
2023_04_26RBCE_CE-I-CTIndianRailwaysStandardGeneralConditionsofContractApril-2022AdvanceCorrectionSlipNo_3ACS-311.pdf
ATTACHMENT
2023_04_26RBCE_CE-I-CTIndianRailwaysStandardGeneralConditionsofContractApril-2022AdvanceCorrectionSlipNo_4ACS-4.pdf
ATTACHMENT
2023_10_20RBCE_CE-I-CTIndianRailwaysStandardGeneralConditionsofContractApril-2022AdvanceCorrectionSlipNo_5ACS-53.pdf
ATTACHMENT
2025_03_04RBCE_CE-I-CTIndianRailwaysStandardGeneralConditionsofContractApril-2022AdvanceCorrectionSlipNo_10ACS-10.pdf
ATTACHMENT
AdvanceCorrectionSlipNo_112026_03_13IndianRailwaysStandardGeneralConditionsofContractApril2022_compressed.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .