Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.8 LAccepted-AOC | ₹12.8 L | L1 | Accepted-AOC L1 |
| 2 | L2₹13.5 L+₹70,201 (5.47%)Rejected-AOC | ₹13.5 L+₹70,201 (5.47%) | L2 | Rejected-AOC L2 |
| 3 | L3₹14.6 L+₹1.8 L (13.7%)Rejected-AOC | ₹14.6 L+₹1.8 L (13.7%) | L3 | Rejected-AOC L3 |
| Sl No | Description | Qty | Unit | S SANJAY GANDHI L3 | S SUBBIAH L2 | THIRUPPATHI M R L1 |
|---|---|---|---|---|---|---|
| 1.01 | Dismantling Chipping of concrete and roughening the
surface (Picking The Existing Damaged Chipping of
concrete and roughening the surface | 130 | m2 | 44.2 ₹5,746 | 41 ₹5,330 | 38.92 ₹5,060.02 Lowest |
| 2.01 | Dismantling RCC by manual / by using deploying
machineries | 4 | m3 | 4,721.3 ₹18,885.2 | 4,380.6 ₹17,522.4 | 4,153.82 ₹16,615.27 Lowest |
| 3.01 | Earth work excavation in all kinds of soils except hard rock requiring blasting, inclusive of shoring, struttingn and baling out water wherever necessary refilling the sides of foundation with excavated earth in layers of 15cm thick well rammed and consolidated depositing the surplus earth within compound in places as shown by the deptl.officers, clearing and leveling the site with initial lead of 10M and lift of 2M etc.Comp.SI.No.62-rate for 10m3 MDU-CORP-BUILDING DATA-P-18-SL No:1 | 9 | m3 | 297.1 ₹2,673.9 | 275.7 ₹2,481.3 | 261.43 ₹2,352.91 Lowest |
| 4.01 | Supplying and filling in foundation and basement with filling Quarry Dust in layers of not more than
15cm.thick well rammed watered and compacted etc., complete complying with standard specification | 1 | m3 | 692 ₹692 | 642.1 ₹642.1 | 608.85 ₹608.85 Lowest |
| 5.01 | Cement concrete 1:4:8 (one cement four sand and eight aggregates) Using 40mm gauge hard broken granite jelly for foundation inc. consolidation and dewatering for foundation wherever necessary etc.complete. MDUCORP- BUILDING DATA-P-21-SL No:10 | 1 | m3 | 6,651 ₹6,651 | 6,171.2 ₹6,171.2 | 5,851.68 ₹5,851.68 Lowest |
| 6.01 | Supplying and erecting shuttering with necessary
supports for plain surface such as RCC boxing side slab, and similar,RCC Slab with all cross bracings etc., complete in all floors of any height (The retrieved
materials should be taken back by the contractor). The payment for centering shall be given after the concrete is laid. (Vertical Portion Only) using steel plates10m2. | 31 | m2 | 1,215.4 ₹37,677.4 | 1,127.7 ₹34,958.7 | 1,069.33 ₹33,149.35 Lowest |
| 7.01 | Reinforced cement concrete 1:1 1/2 :3 (One cement One and half sand and three aggregate) using 20mm machine broken gauge bard granite jelly for RCC worksthe rate excluding the cost of reinforcement grills,centering and shuttering etc., complete in G.F | 10.5 | m3 | 10,213.7 ₹1,07,243.85 | 9,476.8 ₹99,506.4 | 8,986.12 ₹94,354.3 Lowest |
| 8.01 | Supplying fabricating and placing in position of MS
grills for reinforcement rate inc. the cost of steel for all works (the rate to include cost of binding wire also). Below 16mm Dia, complete in G.F | 735 | kg | 97.7 ₹71,809.5 | 90.7 ₹66,664.5 | 85.97 ₹63,190.46 Lowest |
| 9.01 | Brick work in CM 1:5 (one cement & Five Crushed
Stone Sand (MSand) using II class ground moulded
bricks of size 9" X 43/8"X 2 3/4" including finishing,
curing, etc., complete complying with standard
specification - 100CFT | 2.5 | m3 | 8,769.4 ₹21,923.5 | 8,136.8 ₹20,342 | 7,713.65 ₹19,284.13 Lowest |
| 10.01 | Manufacturing and fixing inposition RCC precast slab inC.C.1:2:4, using 20mm HBGS machine crushed jelly offollowing thickness, excluding cost of rein forcementgrill but including moulding, finishing, curing and fixing inposition etc. Complete. 75mm thick MDU-CORPBUILDING DATA-P-135-SL No:86 | 11 | m2 | 1,024.4 ₹11,268.4 | 950.5 ₹10,455.5 | 901.32 ₹9,914.47 Lowest |
Tender Value
₹14.2 L
EMD Value
₹14,248
Closing Date
22 Jan 2026, 3:00 pmClosed
The Commissioner Madurai Corporation
Aringar Anna Maligai , Thallakulam , Madurai
Maintenance and Painting work to OHT tank at AR line in ward 15
2026_MAWS_640033_1
E8 / EST.379 / 2025-26
Open Tender
Civil Works
Lump-sum
Madurai
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹14,248
11 Mar 2026
9 Jan 2026
22 Jan 2026
9 Jan 2026
22 Jan 2026
9 Jan 2026
Dismantling Chipping of concrete and roughening the surface (Picking The Existing Damaged Chipping of concrete and roughening the surface
Dismantling RCC by manual / by using deploying machineries
Earth work excavation in all kinds of soils except hard rock requiring blasting, inclusive of shoring, struttingn and baling out water wherever necessary refilling the sides of foundation with excavated earth in layers of 15cm thick well rammed and consolidated depositing the surplus earth within compound in places as shown by the deptl.officers, clearing and leveling the site with initial lead of 10M and lift of 2M etc.Comp.SI.No.62-rate for 10m3 MDU-CORP-BUILDING DATA-P-18-SL No:1
Supplying and filling in foundation and basement with filling Quarry Dust in layers of not more than 15cm.thick well rammed watered and compacted etc., complete complying with standard specification
Cement concrete 1:4:8 (one cement four sand and eight aggregates) Using 40mm gauge hard broken granite jelly for foundation inc. consolidation and dewatering for foundation wherever necessary etc.complete. MDUCORP- BUILDING DATA-P-21-SL No:10
Supplying and erecting shuttering with necessary supports for plain surface such as RCC boxing side slab, and similar,RCC Slab with all cross bracings etc., complete in all floors of any height (The retrieved materials should be taken back by the contractor). The payment for centering shall be given after the concrete is laid. (Vertical Portion Only) using steel plates10m2.
Reinforced cement concrete 1:1 1/2 :3 (One cement One and half sand and three aggregate) using 20mm machine broken gauge bard granite jelly for RCC worksthe rate excluding the cost of reinforcement grills,centering and shuttering etc., complete in G.F
Supplying fabricating and placing in position of MS grills for reinforcement rate inc. the cost of steel for all works (the rate to include cost of binding wire also). Below 16mm Dia, complete in G.F
Brick work in CM 1:5 (one cement & Five Crushed Stone Sand (MSand) using II class ground moulded bricks of size 9" X 43/8"X 2 3/4" including finishing, curing, etc., complete complying with standard specification - 100CFT
Manufacturing and fixing inposition RCC precast slab inC.C.1:2:4, using 20mm HBGS machine crushed jelly offollowing thickness, excluding cost of rein forcementgrill but including moulding, finishing, curing and fixing inposition etc. Complete. 75mm thick MDU-CORPBUILDING DATA-P-135-SL No:86
Supplying fabricating and placing in position of MS grills for reinforcement rate inc. the cost of steel for allworks (the rate to include cost of binding wire also).Below 16mm Dia
Plastering with cement mortar (1:3) 12mm ,thick in allfloors including cost and conveyance of all materilas to site and labour charges etc,complete as per standard specifications.
R.C.C.Jolly by a new of following size in M20 Concrete using 20mm gauge hard broken granite stone jelly and river sand excluding cost of reinforcement but includingcharges,fabrication charges curing neat finishing and labour charges for fixing the jolly in position with standard spefication.
Painting old wall surface with Two coat of Plastic Emulsion paint of approved quality including cleaning of plaster surface with soap soda and water by manual labour.
Providing two legged scaffolding using suitable sizes of casurina posts of 1.50cm over all length 3m height +0.50 lap) The distance between the two rows being 2m and the spacing of posts being 2m in both rows with two horizontal posts with 0.50m.over lap on either side and braces at 2m C/C including longitudinal and transwere middle of 40 mm thick and 1m width etc. incomplete shape using coir and nails and as directed by the Departmental Officers.
Labour Charges for Attending Water Supply Contamination Works For Fitter I (Pipe laying )
For Fitter II (Pipe laying )
Supply, Delivery of G.M GATE VALVES AS PER IS BS 5154 and related IS Specifications For 100mm Valve
For 125mm Valve
Add GST 18%
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.64 MB
document.pdf
Tender Documents • 0.82 MB
BOQ_766296.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .