| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.7 LAccepted-AOC HIMACHAL PRADESH | SHIMLA | HIMACHAL PRADESH | 172029 | L1 | Accepted-AOC Accepted | |
| 2 | L2₹14.5 L+₹1.8 L (13.9%)Rejected-Finance 126 RAJ KUMAR SANGAT SINGH NAGAR ADARSH NAGAR JALANDHAR JALANDHAR PUNJAB 144008 | JALANDHAR | PUNJAB | 144008 | L2 | Rejected-Finance Rejected | |
| 3 | L3₹15.9 L+₹3.2 L (24.9%)Rejected-Finance | L3 | Rejected-Finance Rejected | |
| 4 | L4₹16.3 L+₹3.6 L (28.1%)Rejected-Finance | L4 | Rejected-Finance Rejected | |
| 5 | L5₹17.3 L+₹4.6 L (35.9%)Rejected-Finance C O VERMA NIWAS SANJAULI SHIMLA 6 | SHIMLA | HIMACHAL PRADESH | 171001 | L5 | Rejected-Finance Rejected |
Tender Value
₹18.2 L
EMD Value
₹34,800
Closing Date
22 Feb 2022, 10:30 amClosed
Executive Engineer
HP City Transport and Bus Stand Management And Development Authority Tutikandi Shimla -4
SH Construction of RCC 4.50 mtrs span slab culvert at entry and Exit point over Nallah
2022_BSMDA_56472_9
HPBSMDA/EE/(2)/2021 Tenders Vol-III
Open Tender
Civil Works
Item Rate
180 days
Parwanoo
Please refer Tender Document
9 documents required · 9 mandatory
₹500
HP BSMDA ,Tutikandi Shimla-4
₹34,800
2 Mar 2022
7 Feb 2022
22 Feb 2022
8 Feb 2022
22 Feb 2022
8 Feb 2022
Amount
Excavation work by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil in all kind of soil and disposal of surplus excavated soils upto approvrd dumping site, including all leads, lifts and carriage of materials, complete in all respect of as per entire satisfaction of the Engineer in charge.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (One Cement isto three coarse sand isto six graded stone aggregate) 40 mm (forty millimeter) nominal size, including all leads, lifts and carriage of materials, complete in all respect of as per entire satisfaction of the Engineer in charge.
Providing and laying in position cement concretein retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc., up to floor five level, excluding the cost of centering, shuttering and finishing :- 1:3:6 (one cement isto three coarse sand isto six graded stone aggregate) 20 mm (twenty millimeter) nominal size, including all leads, lifts and carriage of materials, complete in all respect of as per entire satisfaction of the Engineer in charge.
Centering and shuttering including strutting, propping etc. and removal of form work for : Foundations, footings, bases for columns, including all leads, lifts and carriage of materials, complete in all respect of as per entire satisfaction of the Engineer in charge.
Centering and shuttering including strutting, propping etc. and removal of form work for : Retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc., including all leads, lifts and carriage of materials, complete in all respect of as per entire satisfaction of the Engineer in charge.
Centering and shuttering including strutting, propping etc. and removal of form work for : Suspended floors, roofs, landings, balconies and access platform, including all leads, lifts and carriage of materials, complete in all respect of as per entire satisfaction of the Engineer in charge.
Centering and shuttering including strutting, propping etc. and removal of form work for : Edges of slabs and breaks in floors and walls above 20 cm (twenty centimeter) wide, including all leads, lifts and carriage of materials, complete in all respect of as per entire satisfaction of the Engineer in charge.
Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (one cement isto one and half coarse sand isto three graded stone aggregate) 20 mm (twenty millimeter) nominal size in:- Retaining walls, return walls, walls (any thickness) including attached pilasters buttresses, plinth and string courses fillets, kerbs and steps etc. including all leads, lifts and carriage of materials, complete in all respect of as per entire satisfaction of the Engineer in charge.
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position including cost of binding wire and binding all complete above plinth level, including all leads, lifts and carriage of materials, complete in all respect of as per entire satisfaction of the Engineer in charge.
Dry stone pitching 22.5 cm (twenty two point five millimeter) thick including supply of stones and preparing surface complete. including all leads, lifts and carriage of materials, complete in all respect of as per entire satisfaction of the Engineer in charge.
Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required In:- gratings, frames, guard bar, ladder,railings,brackets, gates and similar works. including all leads, lifts and carriage of materials, complete in all respect of as per entire satisfaction of the Engineer in charge.
Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two or more coat applied @ 0.90 ltr/ 10 sqm over an under coat of primer applied @ 0.80 ltr/ 10 sqm of approved brand and manufacture, including all leads, lifts and carriage of materials, complete in all respect of as per entire satisfaction of the Engineer in charge.
Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars/hading over usefull material to Department and disposal of unserviceable material up to approved dumping site, including all leads, lifts and carriage of materials, complete in all respect of as per entire satisfaction of the Engineer in charge.
RAJ KUMAR
Devender
SANDEEP KANT SHARMA
Manik Verma
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .