Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.0 LAdmitted-Finance 0 DHARAMBUGH KRALPORA BAGI MEHTAB B K PORA BUDGAM JAMMU KASHMIR 190019 | SRINAGAR | JAMMU AND KASHMIR | 190019 | ₹8.0 L | L1 | Admitted-Finance |
| 2 | L2₹8.6 L+₹60,883 (7.65%)Admitted-Finance | ₹8.6 L+₹60,883 (7.65%) | L2 | Admitted-Finance |
| 3 | L3₹8.8 L+₹86,683 (10.9%)Admitted-Finance | ₹8.8 L+₹86,683 (10.9%) | L3 | Admitted-Finance |
| 4 | L4₹9.4 L+₹1.5 L (18.6%)Admitted-Finance | ₹9.4 L+₹1.5 L (18.6%) | L4 | Admitted-Finance |
| Sl No | Description | Qty | Unit | MIR IRFAN ELECTRICAL/SUPPLIERS L1 | MS BISMILLAH ENTERPRISES L2 | M/S BHAT ELECTRICALS L3 | FAYAZ AHMAD DAR L4 |
|---|---|---|---|---|---|---|---|
| 1.00 | Supply, Installation, Testing & commissioning of 9 Mtr. Long Pole (ST-410 SP33) | 10 | No.'s | 20,000 ₹2,00,000 | 19,500 ₹1,95,000 | 13,800 ₹1,38,000 Lowest | 18,100 ₹1,81,000 |
| 2.00 | Supply, Installation, Testing & commissioning of 8 Mtr. Long Pole (ST-410 SP15) | 17 | No.'s | 16,000 ₹2,72,000 | 15,300 ₹2,60,100 | 12,000 ₹2,04,000 Lowest | 14,750 ₹2,50,750 |
| 3.00 | Supply, Installation, Testing & commissioning of ACSR 0.05 Conductor (50 mm² ACSR Conductor) | 3 | Km.'s | 34,000 ₹1,02,000 Lowest | 54,000 ₹1,62,000 | 70,000 ₹2,10,000 | 73,500 ₹2,20,500 |
| 4.00 | Supply, Installation, Testing & commissioning of ACSR 0.03 Conductor (30 mm² ACSR Conductor) | 3 | Km.'s | 27,000 ₹81,000 Lowest | 38,000 ₹1,14,000 | 43,000 ₹1,29,000 | 44,500 ₹1,33,500 |
| 5.00 | Supply, Installation, Testing & commissioning of GI Channel/ Angle/ Flat iron for cross, braces of sizes including clamps and GI Nut Bolts with all accessories | 300 | Kgs | 116 ₹34,800 Lowest | 129 ₹38,700 | 140 ₹42,000 | 126 ₹37,800 |
| 6.00 | Supply, Installation, Testing & commissioning of GI Guy Wire | 20 | Kgs | 100 ₹2,000 Lowest | 100 ₹2,000 Lowest | 130 ₹2,600 | 128 ₹2,560 |
| 7.00 | Supply, Installation, Testing & commissioning of Mucki clamps/LT Shackles with insulators | 45 | No.'s | 700 ₹31,500 | 360 ₹16,200 | 300 ₹13,500 | 275 ₹12,375 Lowest |
| 8.00 | Supply, Installation, Testing & commissioning of 11kV Polymeric composite Pin Insulator 12kV, 5kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm | 35 | No.'s | 170 ₹5,950 Lowest | 250 ₹8,750 | 250 ₹8,750 | 200 ₹7,000 |
| 9.00 | Earthing Complete by GI Pipe 40 mm 3 mtr long through GI Strip 25x3 mm as per REC Standards. | 27 | No.'s | 500 ₹13,500 | 430 ₹11,610 Lowest | 900 ₹24,300 | 1,300 ₹35,100 |
| 10.00 | Providing of Painting of Poles Red Oxide as per standards | 27 | No.'s | 1 ₹27 Lowest | 20 ₹540 | 100 ₹2,700 | 30 ₹810 |
Tender Value
₹8.6 L
EMD Value
₹17,200
Closing Date
8 May 2026, 11:00 amClosed
XEN ED PULWAMA
OFFICE OF THE XEN ED PULWAMA
Reconstruction of damaged electrical infrastructure of HT/LT lines of KPDCL ED Pulwama, Sub-Division Newa for the damages caused due to recent floods in Kashmir during Aug-Sep 2025 under SASCI Part-I (Disaster) for the year 2025-26
2026_PDD_308559_1
KPDCL/OM/PUL/06 of 2026-27 Dated 24-04-2026.
Open Tender
Electrical Works
Turn-key
40 days
XEN ED PULWAMA
Please refer Tender documents.
2 documents required · 2 mandatory
₹700
Executive Engineer ED Pulwama
₹17,200
27 Jun 2026
24 Apr 2026
8 May 2026
24 Apr 2026
8 May 2026
24 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supply, Installation, Testing & commissioning of 9 Mtr. Long Pole (ST-410 SP33) | 10 | No.'s | - | - |
| 2 | Supply, Installation, Testing & commissioning of 8 Mtr. Long Pole (ST-410 SP15) | 17 | No.'s | - | - |
| 3 | Supply, Installation, Testing & commissioning of ACSR 0.05 Conductor (50 mm² ACSR Conductor) | - | Km.'s | - | - |
| 4 | Supply, Installation, Testing & commissioning of ACSR 0.03 Conductor (30 mm² ACSR Conductor) | - | Km.'s | - | - |
| 5 | Supply, Installation, Testing & commissioning of GI Channel/ Angle/ Flat iron for cross, braces of sizes including clamps and GI Nut Bolts with all accessories | 300 | Kgs | - | - |
| 6 | Supply, Installation, Testing & commissioning of GI Guy Wire | 20 | Kgs | - | - |
| 7 | Supply, Installation, Testing & commissioning of Mucki clamps/LT Shackles with insulators | 45 | No.'s | - | - |
| 8 | Supply, Installation, Testing & commissioning of 11kV Polymeric composite Pin Insulator 12kV, 5kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm | 35 | No.'s | - | - |
| 9 | Earthing Complete by GI Pipe 40 mm 3 mtr long through GI Strip 25x3 mm as per REC Standards. | 27 | No.'s | - | - |
| 10 | Providing of Painting of Poles Red Oxide as per standards | 27 | No.'s | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.19 MB
BOQ_999792.xls
BOQ • 0.24 MB
SBDSASCINEWA.pdf
Tender Documents • 1.66 MB
ANNEXURESASCINEWA.pdf
Tender Documents • 0.42 MB
DRAWINGS.pdf
Other Document • 15.02 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .