| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 3₹53.9 L+₹55,636.43 (1.04%)Accepted-Finance | 3 | Accepted-Finance L3 | |
| 2 | 1₹53.3 LRejected-Finance | 1 | Rejected-Finance L1 | |
| 3 | 2₹53.4 L+₹5,799.69 (0.11%)Rejected-Finance | 2 | Rejected-Finance L2 | |
| 4 | L4₹53.9 L+₹55,667.48 (1.04%)Rejected-Finance 26 106 1 BUTTAIPETA KRISHNA ANDHRA PRADESH KRISHNA ANDHRA PRADESH 521001 | KRISHNA | ANDHRA PRADESH | 521001 | L4 | Rejected-Finance L4 | |
| 5 | 4₹53.9 L+₹55,667.48 (1.04%)Rejected-Finance | 4 | Rejected-Finance L4 |
| Sl No | Description | Qty | Unit | j srinivas L2 | LINGAM RAVI KIRAN L4 | M N NAIDU CONSTRUCTIONS L3 | Krishna Rao Madugula L5 | V SURENDRA NAIDU L4 | T NARASIMHULU NAIDU L1 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00Name of the Monument / Site: Vellaturu village, Suryapet Dist., Telangana | |||||||||
| 1.01 | Construction C.R. Masonry in Lime mortar(1:2) with size of stone 0.30x0.30x0.45m as base structure below and above the ground level including cost of all materials and necessary bond stones at every 3.0 Sqm. Of area, conveyance, labour charges, curing etc., complete as per the directions of the ASI officials. | 57.93 | Cum | 10,967.5 ₹6,35,347.28 Lowest | 11,070 ₹6,41,285.1 | 11,070 ₹6,41,285.1 | 11,070 ₹6,41,285.1 | 11,070 ₹6,41,285.1 | 10,967.5 ₹6,35,347.28 Lowest |
| 1.02 | Resetting of Documented Adhistana layers with Lime mortar (1:2) as base structure below and above the ground level including cost of labour charges, curing etc., complete as per the directions of the ASI officials. | 76.96 | Cum | 22,795.28 ₹17,54,324.75 | 23,008.32 ₹17,70,720.31 | 23,008 ₹17,70,695.68 | 23,048.32 ₹17,73,798.71 | 23,008.32 ₹17,70,720.31 | 22,735.28 ₹17,49,707.15 Lowest |
| 1.03 | Resetting of Documented Stone Masonry Wall in Lime mortar (1:2) of Shiva Temple after taking all precautionary measures etc., to avoid any sort of damage to the members complete as per the directions of the ASI officials. | 19.95 | Cum | 25,145 ₹5,01,642.75 Lowest | 25,380 ₹5,06,331 | 25,380 ₹5,06,331 | 25,380 ₹5,06,331 | 25,380 ₹5,06,331 | 25,145 ₹5,01,642.75 Lowest |
| 1.04 | Filling of core between veneer walls with Brick aggregate lime concrete in (1:2:4) of Shiva Temple after taking all precautionary measures etc., to avoid any sort of damage to the members complete as per the directions of the ASI officials. | 38.99 | Cum | 19,153 ₹7,46,775.47 Lowest | 19,332 ₹7,53,754.68 | 19,332 ₹7,53,754.68 | 19,332 ₹7,53,754.68 | 19,332 ₹7,53,754.68 | 19,153 ₹7,46,775.47 Lowest |
| 1.05 | Resetting of Documented Stone Pillars and capitals of Shiva Temple after taking all precautionary measures etc., to avoid any sort of damage to the members complete as per the directions of the ASI officials. | 0.88 | Cum | 23,807.5 ₹20,950.6 | 24,030 ₹21,146.4 | 24,030 ₹21,146.4 | 24,030 ₹21,146.4 | 24,030 ₹21,146.4 | 23,707.5 ₹20,862.6 Lowest |
| 1.06 | Resetting of Documented Roof Beam, Lintel beams, and Jambs Members in Lime mortar (1:2) of Shiva Temple after taking all precautionary measures etc., to avoid any sort of damage to the members complete as per the directions of the ASI officials. | 3.49 | Cum | 28,896.42 ₹1,00,848.51 | 29,166.48 ₹1,01,791.02 | 29,166 ₹1,01,789.34 | 29,166.48 ₹1,01,791.02 | 29,166.48 ₹1,01,791.02 | 28,836.42 ₹1,00,639.11 Lowest |
| 1.07 | Resetting of Documented Floor Slabs in Lime mortar (1:2) of Shiva Temple after taking all precautionary measures etc., to avoid any sort of damage to the members complete as per the directions of the ASI officials. | 24.02 | Sqm | 1,498 ₹35,981.96 Lowest | 1,512 ₹36,318.24 | 1,512 ₹36,318.24 | 1,512 ₹36,318.24 | 1,512 ₹36,318.24 | 1,498 ₹35,981.96 Lowest |
| 1.08 | Resetting of Documented Roof Slab Members with Lime mortar (1:2) of Shiva Temple after taking all precautionary measures etc., to avoid any sort of damage to the members complete as per the directions of the ASI officials. | 11.45 | Cum | 34,775 ₹3,98,173.75 Lowest | 35,100 ₹4,01,895 | 35,100 ₹4,01,895 | 35,100 ₹4,01,895 | 35,100 ₹4,01,895 | 34,775 ₹3,98,173.75 Lowest |
| 1.09 | Providing Plain Brick aggregate Lime Concrete (1:2:4) as Roof water tightening with two pot tiles layers on prepared surface including cost of all materials, conveyance, labour charges, curing etc., complete as per the directions of the ASI officials. | 17.41 | Cum | 18,832 ₹3,27,865.12 Lowest | 19,008 ₹3,30,929.28 | 19,008 ₹3,30,929.28 | 19,008 ₹3,30,929.28 | 19,008 ₹3,30,929.28 | 18,832 ₹3,27,865.12 Lowest |
Tender Value
₹49.9 L
EMD Value
₹1.2 L
Closing Date
27 Aug 2026, 11:00 amClosed
Superintending Archaeologist
O/o The SA, ASI Kendriya sadan , Koti, Sultan Bazar Hyderabad
Construction CR masonry wall in lime mortar Resetting of documented adhistana layers Resetting of documented stone masnory wall Restting of documentd stone pillars
2026_ASI_921047_1
T-15015/27/2025-Hyderabad Circle/801
Open Tender
Civil Works
Works
Shiva Temple at vellaturu village
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹1.2 L
Yes
O/o The SA, ASI Kendriya sadan Hyderabad
23 Sept 2026
7 Aug 2026
28 Aug 2026
7 Aug 2026
27 Aug 2026
7 Aug 2026
14 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Name of the Monument / Site: Vellaturu village, Suryapet Dist., Telangana | |||||
| 1.01 | Construction C.R. Masonry in Lime mortar(1:2) with size of stone 0.30x0.30x0.45m as base structure below and above the ground level including cost of all materials and necessary bond stones at every 3.0 Sqm. Of area, conveyance, labour charges, curing etc., complete as per the directions of the ASI officials. | 57.93 | Cum | 10,250 | ₹5,93,782.5 |
| 1.02 | Resetting of Documented Adhistana layers with Lime mortar (1:2) as base structure below and above the ground level including cost of labour charges, curing etc., complete as per the directions of the ASI officials. | 76.96 | Cum | 21,304 | ₹16,39,555.84 |
| 1.03 | Resetting of Documented Stone Masonry Wall in Lime mortar (1:2) of Shiva Temple after taking all precautionary measures etc., to avoid any sort of damage to the members complete as per the directions of the ASI officials. | 19.95 | Cum | 23,500 | ₹4,68,825 |
| 1.04 | Filling of core between veneer walls with Brick aggregate lime concrete in (1:2:4) of Shiva Temple after taking all precautionary measures etc., to avoid any sort of damage to the members complete as per the directions of the ASI officials. | 38.99 | Cum | 17,900 | ₹6,97,921 |
| 1.05 | Resetting of Documented Stone Pillars and capitals of Shiva Temple after taking all precautionary measures etc., to avoid any sort of damage to the members complete as per the directions of the ASI officials. | 0.88 | Cum | 22,250 | ₹19,580 |
| 1.06 | Resetting of Documented Roof Beam, Lintel beams, and Jambs Members in Lime mortar (1:2) of Shiva Temple after taking all precautionary measures etc., to avoid any sort of damage to the members complete as per the directions of the ASI officials. | 3.49 | Cum | 27,006 | ₹94,250.94 |
| 1.07 | Resetting of Documented Floor Slabs in Lime mortar (1:2) of Shiva Temple after taking all precautionary measures etc., to avoid any sort of damage to the members complete as per the directions of the ASI officials. | 24.02 | Sqm | 1,400 | ₹33,628 |
| 1.08 | Resetting of Documented Roof Slab Members with Lime mortar (1:2) of Shiva Temple after taking all precautionary measures etc., to avoid any sort of damage to the members complete as per the directions of the ASI officials. | 11.45 | Cum | 32,500 | ₹3,72,125 |
| 1.09 | Providing Plain Brick aggregate Lime Concrete (1:2:4) as Roof water tightening with two pot tiles layers on prepared surface including cost of all materials, conveyance, labour charges, curing etc., complete as per the directions of the ASI officials. | 17.41 | Cum | 17,600 | ₹3,06,416 |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 8.80 MB
RFPCDSHIVa.pdf
Tender Documents • 8.79 MB
BOQ_967908.xls
BOQ • 0.29 MB
corrigendumCDworks.pdf
PDF • 0.22 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .