Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹10.2 LAccepted-Finance | ₹10.2 L | 1 | Accepted-Finance Single bidder participated. |
| 2 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹12.3 L
EMD Value
₹24,523
Closing Date
20 Jul 2026, 10:00 amClosed
Executive Engineer, Store Division, APWD, Sri Vija
Executive Engineer, Store Division, APWD, Sri Vijayapuram
Repair and replacement of GI Rack in Various Section under Store Division.
2026_APWD_23755_1
e-Tender/DB/SD/2026-27/356 dt 13/07/26
Open Tender
Civil Works - Others
Percentage
90 days
Executive Engineer, Store Division, APWD, Store Di
4 documents required · 4 mandatory
₹0
₹24,523
Yes
22 Jul 2026
14 Jul 2026
20 Jul 2026
14 Jul 2026
20 Jul 2026
14 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. | |||||
| 1.01 | All kinds of soil. | 13.82 | Cum | 334.8 | ₹4,626.94 |
| 1.02 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 and for all lif. | 6.05 | Cum | 181.5 | ₹1,098.08 |
| 2Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : | |||||
| 2.01 | 1:2:4 (1 cement : 2 coarse sand (zone-Ill) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 17 | Cum | 11,363.2 | ₹1,93,174.4 |
| 3Centering and shuttering including strutting, propping etc. and removal of form work for: | |||||
| 3.01 | Foundations, footings, bases for columns | 172.8 | Sqm | 401.65 | ₹69,405.12 |
| 4Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete. | |||||
| 4.01 | On steel work | 1,306 | sqm | 231.5 | ₹3,02,339 |
| 5 | Removing white or colour wash by scrapping and sand papering and preparing the surface smooth including necessary repairs to scratches etc. Complete | 1,306 | Sqm | 17.95 | ₹23,442.7 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.11 MB
TenderDocument.pdf
Tender Documents • 3.49 MB
BOQ_25170.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .