| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹13.8 LAccepted-Finance | ₹13.8 L | 1 | Accepted-Finance above estimate rate |
| 2 | 2₹14.0 LRejected-Finance NO 5 NMK COLONY 1ST CROSS TRICHY 620020 | TRICHY | TRICHY | TAMIL NADU | 620020 | ₹14.0 L | 2 | Rejected-Finance below estimate rate |
| Sl No | Description | Qty | Unit | Sakthivel L2 | Mohankumar S L1 |
|---|---|---|---|---|---|
| 1.00 | Clearing the Light jungle including all labour charges for burying and burning etc., complete. | 207.36 | Sqm | 7 ₹1,451.52 | 6 ₹1,244.16 |
| 2.00 | Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for Cutting side drain etc, complete. as per SS 20 A | 172.8 | cum | 135 ₹23,328 | 132 ₹22,809.60 |
| 3.00 | Collection and supply of gritty gravel from approved quarry including all labour charges for spreading and compaction with power roller etc. complete, for Shoulders | 57.6 | cum | 615 ₹35,424 | 611 ₹35,193.60 |
| 4.00 | Picking 5 cm to 10 cm old BT surface and sectioning - 1 sq.m | 484.58 | cum | 25 ₹12,114.50 | 23 ₹11,145.34 |
| 5.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) 250 mm thick, including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory Soil Compactor to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as pwe clause 406 of MORTH Rev-5 | 181.72 | cum | 2,462 ₹4.5 L | 2,460 ₹4.5 L |
| 6.00 | Providing and laying of Prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it. | 1,453.75 | cum | 90 ₹1.3 L | 86 ₹1.3 L |
| 7.00 | Providing and laying of Tack Coate using Emulsion at the rate of 2.5 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it. | 1,453.75 | Sqm | 25 ₹36,343.75 | 20 ₹29,075 |
| 8.00 | BITUMINOUS CONCRETE 25/30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as
per specification using CMP as per clause 507 of MORTH Rev-5 | 43.21 | Sqm | 11,500 ₹5.0 L | 11,453.5 ₹5.0 L |
| 9.00 | GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) | 1 | GST Amount | 2,13,934 ₹2.1 L | 2,10,802 ₹2.1 L |
Tender Value
₹14.0 L
EMD Value
₹13,970
Closing Date
8 Jan 2026, 3:00 pmClosed
Block Development Officer BP Avinashi
PUO AVINASHI
Strengthening the BT road at Alangattupalayam ARRDEE Avenue H/O Nambiyampalayam Package NO 02
2025_RDTN_637811_1
1076/2025/A5 date 18.12.2025
Open Tender
Civil Works
Avinashi
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹13,970
Yes
PUO Office Avinshi
9 Jan 2026
31 Dec 2025
8 Jan 2026
31 Dec 2025
8 Jan 2026
31 Dec 2025
6 Jan 2026
Amount
Clearing the Light jungle including all labour charges for burying and burning etc., complete.
Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for Cutting side drain etc, complete. as per SS 20 A
Collection and supply of gritty gravel from approved quarry including all labour charges for spreading and compaction with power roller etc. complete, for Shoulders
Picking 5 cm to 10 cm old BT surface and sectioning - 1 sq.m
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) 250 mm thick, including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory Soil Compactor to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as pwe clause 406 of MORTH Rev-5
Providing and laying of Prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying of Tack Coate using Emulsion at the rate of 2.5 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
BITUMINOUS CONCRETE 25/30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Sakthivel (BID ID -1556689)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.01 MB
tkb.pdf
Tender Documents • 0.65 MB
BOQ_763362.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid