| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.5 CrAccepted-AOC ADD 5 SARDAR PATEL MARG CIVIL LINES PRAYAGRAJ | PRAYAGRAJ | PRAYAGRAJ | UTTAR PRADESH | ₹5.5 Cr | L1 | Accepted-AOC AOC |
| 2 | L2₹5.8 Cr+₹28.2 L (5.08%)Rejected-Finance | ₹5.8 Cr+₹28.2 L (5.08%) | L2 | Rejected-Finance Rejected Being Higher Rates |
| 3 | L3₹6.5 Cr+₹1.0 Cr (18.1%)Rejected-Finance 0 JAGDISHPUR SOHOULI MARTINGANJ TEH MARTINGANJ AZAMGARH UTTAR PRADESH 276301 | AZAMGARH | UTTAR PRADESH | 276301 | ₹6.5 Cr+₹1.0 Cr (18.1%) | L3 | Rejected-Finance Rejected Being Higher Rates |
| 4 | L4₹6.8 Cr+₹1.3 Cr (23.4%)Rejected-Finance | ₹6.8 Cr+₹1.3 Cr (23.4%) | L4 | Rejected-Finance Rejected Being Higher Rates |
| 5 | L5₹7.0 Cr+₹1.4 Cr (25.7%)Rejected-Finance | ₹7.0 Cr+₹1.4 Cr (25.7%) | L5 | Rejected-Finance Rejected Being Higher Rates |
| Sl No | Description | Qty | Unit | M/S ANAND ENTERPRISES L3 | M/S BABY SHAHI L8 | M/S DEEPAK KUMAR AGARWAL L7 | Raghvendra Pratap Singh Contractor L6 | Narayan Construction L4 | M/s VIJENDRA PRATAP SINGH L9 | KANCHANABHA CONSTRUCT TECH PRIVATE LIMITED L2 | M/S ADITYA ENTERPRISES L1 | M/S SUN CONSTRUCTION L5 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness. | 7,029.6 | Cum | 10 ₹70,296 | 10 ₹70,296 | 15 ₹1,05,444 | 16.69 ₹1,17,324.02 | 5 ₹35,148 Lowest | 21 ₹1,47,621.6 | 13.36 ₹93,915.46 | 10 ₹70,296 | 16.15 ₹1,13,528.04 |
| 2.00 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the. All kinds of soil. As Per SOR Ch-07 Item No-2.8 | 2,465 | Cum | 130 ₹3,20,450 | 190 ₹4,68,350 | 75 ₹1,84,875 | 156.59 ₹3,85,994.35 | 50 ₹1,23,250 Lowest | 150 ₹3,69,750 | 125.37 ₹3,09,037.05 | 100 ₹2,46,500 | 151.51 ₹3,73,472.15 |
| 3.00 | Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. | 17,023 | Cum | 120 ₹20,42,760 | 190 ₹32,34,370 | 75 ₹12,76,725 Lowest | 158.53 ₹26,98,656.19 | 100 ₹17,02,300 | 198 ₹33,70,554 | 126.92 ₹21,60,559.16 | 100 ₹17,02,300 | 153.39 ₹26,11,157.97 |
| 4.00 | Taking out existing CC interlocking paver blocks from footpath/ central verge, including removal of rubbish etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge. As Per SOR Ch-25 Item No-36. | 8,700 | Sqm | 28 ₹2,43,600 | 45 ₹3,91,500 | 125 ₹10,87,500 | 37.36 ₹3,25,032 | 150 ₹13,05,000 | 46 ₹4,00,200 | 29.91 ₹2,60,217 | 20 ₹1,74,000 Lowest | 36.15 ₹3,14,505 |
| 5.00 | Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 | 3,770 | Cum | 2,400 ₹90,48,000 | 440 ₹16,58,800 Lowest | 3,400 ₹1,28,18,000 | 3,531.96 ₹1,33,15,489.2 | 2,500 ₹94,25,000 | 442 ₹16,66,340 | 2,950 ₹1,11,21,500 | 2,600 ₹98,02,000 | 3,417.33 ₹1,28,83,334.1 |
| 6.00 | Laying old cement cocrete interlocking paver blocks of any design/ shape laid in required line, level, curvature, colour and pattern over and including 50 mm thick compacted bed of coarse sand, filling the joints with fine sand etc. all complete as per the direction of Engineer-in-charge. (Old CC paver blocks shall be supplied by the department free of cost). As Per SOR Ch-25 Item No-35. | 5,568 | Sqm | 200 ₹11,13,600 | 250 ₹13,92,000 | 275 ₹15,31,200 | 207.46 ₹11,55,137.28 | 100 ₹5,56,800 Lowest | 260 ₹14,47,680 | 166.1 ₹9,24,844.8 | 150 ₹8,35,200 | 200.74 ₹11,17,720.32 |
| 7.00 | Disposal of moorum/building rubbish/ malba/ similar unserviceable, dismantled or waste material by mechanical transport including loading, transporting, unloading to approved municipal dumping ground for lead upto 10 km for all lifts, complete as per directions of Engineer-in-charge. as per SOR Ch-25 Item no. 52 | 3,480 | Cum | 150 ₹5,22,000 | 230 ₹8,00,400 | 175 ₹6,09,000 | 188.39 ₹6,55,597.2 | 100 ₹3,48,000 Lowest | 236 ₹8,21,280 | 150.83 ₹5,24,888.4 | 150 ₹5,22,000 | 182.28 ₹6,34,334.4 |
| 8.00 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. as per MORT&H Specification 406 | 4,350 | Cum | 2,700 ₹1,17,45,000 Lowest | 4,700 ₹2,04,45,000 | 3,600 ₹1,56,60,000 | 3,762.38 ₹1,63,66,353 | 3,600 ₹1,56,60,000 | 4,732 ₹2,05,84,200 | 3,100 ₹1,34,85,000 | 3,000 ₹1,30,50,000 | 3,640.27 ₹1,58,35,174.5 |
| 9.00 | Providing and applying primer coat with SS-2 grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means. As per MORT&H Specification No 502. | 29,000 | Sqm | 33 ₹9,57,000 | 40 ₹11,60,000 | 32 ₹9,28,000 | 33.11 ₹9,60,190 | 30 ₹8,70,000 | 41 ₹11,89,000 | 26.51 ₹7,68,790 | 20 ₹5,80,000 Lowest | 31.67 ₹9,18,430 |
| 10.00 | Providing and applying tack coat with bitumen VG-10 using bitumen pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. As per MORT&H Specification No 503. | 29,118 | Sqm | 11 ₹3,20,298 | 12 ₹3,49,416 | 10 ₹2,91,180 | 9.6 ₹2,79,532.8 | 7 ₹2,03,826 Lowest | 12 ₹3,49,416 | 7.69 ₹2,23,917.42 | 10 ₹2,91,180 | 9.24 ₹2,69,050.32 |
Tender Value
₹9.2 Cr
EMD Value
₹18.4 L
Closing Date
14 Jan 2026, 12:00 pmClosed
SE Lucknow Circle PWD Lucknow
Office of the SE Lucknow Circle PWD Lucknow
Widening and Strengthening work of Lucknow- Kursi- Mahmoodabad road Km 9 to Madiyaon Shukla Chauraha in Lucknow District - Civil Work
2025_CEUCZ_1103118_1
7800/523 C (PDL) Lko.Cir./2025-26 Dated 23.12.2025
Open Tender
Civil Works - Roads
Percentage
270 days
Lucknow
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
₹18.4 L
Office of the SE Lucknow Circle PWD Lucknow
9 Apr 2026
31 Dec 2025
14 Jan 2026
31 Dec 2025
14 Jan 2026
31 Dec 2025
9 Jan 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness. | 7,029.6 | Cum | 12.16 | ₹85,479.94 |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the. All kinds of soil. As Per SOR Ch-07 Item No-2.8 | 2,465 | Cum | 13,552.13 | ₹3,34,06,000.45 |
| 3 | Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. | 17,023 | Cum | 15,108.95 | ₹25,71,99,655.85 |
| 4 | Taking out existing CC interlocking paver blocks from footpath/ central verge, including removal of rubbish etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge. As Per SOR Ch-25 Item No-36. | 8,700 | Sqm | 13,552.13 | ₹11,79,03,531 |
| 5 | Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 | 3,770 | Cum | 15,108.95 | ₹5,69,60,741.5 |
| 6 | Laying old cement cocrete interlocking paver blocks of any design/ shape laid in required line, level, curvature, colour and pattern over and including 50 mm thick compacted bed of coarse sand, filling the joints with fine sand etc. all complete as per the direction of Engineer-in-charge. (Old CC paver blocks shall be supplied by the department free of cost). As Per SOR Ch-25 Item No-35. | 5,568 | Sqm | 13,552.13 | ₹7,54,58,259.84 |
| 7 | Disposal of moorum/building rubbish/ malba/ similar unserviceable, dismantled or waste material by mechanical transport including loading, transporting, unloading to approved municipal dumping ground for lead upto 10 km for all lifts, complete as per directions of Engineer-in-charge. as per SOR Ch-25 Item no. 52 | 3,480 | Cum | 15,108.95 | ₹5,25,79,146 |
| 8 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. as per MORT&H Specification 406 | 4,350 | Cum | 13,552.13 | ₹5,89,51,765.5 |
| 9 | Providing and applying primer coat with SS-2 grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means. As per MORT&H Specification No 502. | 29,000 | Sqm | 15,108.95 | ₹43,81,59,550 |
| 10 | Providing and applying tack coat with bitumen VG-10 using bitumen pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. As per MORT&H Specification No 503. | 29,118 | Sqm | 13,552.13 | ₹39,46,10,921.34 |
stage.html
html • 0.07 MB
technical_2034211.pdf
techsummary_2034211.pdf
finance_2034211.pdf
BOQ Comparative Chart
xlsx
finsummary_2034211.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.16 MB
SBD_7800.pdf
Tender Documents • 1.62 MB
BOQ_2034211.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .