| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹25.0 LAccepted-Finance 126 2 BECHARAM CHATT ERJEE ROAD KOLKATA 700034 | KOLKATA | KOLKATA | WEST BENGAL | 700034 | L1 | Accepted-Finance LOWEST BIDDER. | |
| 2 | L2₹26.2 L+₹1.2 L (5.00%)Rejected-Finance 78 2 23 B ROY RD WES T CAL 61 700061 | KOLKATA | KOLKATA | WEST BENGAL | 700061 | L2 | Rejected-Finance BID HIGHER THAN L1. | |
| 3 | L3₹26.6 L+₹1.7 L (6.70%)Rejected-Finance 1 JOYRAMPUR JALA ROAD MAIL 42C SARADAMA UPANIBESH BEHALA KOLKATA 700060 | KOLKATA | WEST BENGAL | 700060 | L3 | Rejected-Finance BID HIGHER THAN L2. |
Tender Value
₹29.7 L
EMD Value
₹60,000
Closing Date
28 Feb 2026, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
DIRECTOR GENERAL (ROADS)
5/2, CHOWRINGHEE PLACE, KOL-700013 WEST BENGAL
REPAIRING AND WIDENING OF ROAD FROM165D, SECTOR EA CANAL SOUTH RD TO 197, SECTOR A CANAL SOUTH RD IN WARDNO-57.
2026_KMC_998999_1
KMC/ROADS/2025-2026/784
Open Tender
CIVIL WORKS
Percentage
60 days
CANAL SOUTH RD
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹60,000
2 Nov 2026
5 Feb 2026
5 Mar 2026
5 Feb 2026
28 Feb 2026
5 Feb 2026
120 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in cutting to form road section in correct profile including
removal of spoil not exceeding initial lead of 50m and initial lift of
1.5m (Mode of measurement: pre works and post works | 702.72 | CUBIC METER | 89.9 | ₹63,174.53 |
| 2 | Supplying, spreading and compacting Sand to required thickness, in
layers not exceeding 150 mm to proper gradient and camber,
inundating each layer by water and packing and ramming layer by
layer to achieve desired compaction, including lighting, guarding,
barricading and making adequate earthen bundh where necessary,
curing with water as per direction, mending cracks and depressions
by ramming wherever necessary.
Note:- Add cost at site of the materials to arrive at the complete rate.
The compaction factor for dry, clean sand may be taken as 0.835.
(The payment is to be made on the basis of finished compacted
volume).
(a) For Fine Sand ( Ref :PWD (Rds & Brdgs)-2018, It. No. 4.05 Page
No.245 & page-222 sl. No-3) | 307.2 | CUBIC METER | 1,400.03 | ₹4,30,089.22 |
| 3 | Construction of Sub Base using Local Materials, spreading in uniform
layers with Motor grader on prepared surface, including screening the
metal as necessary, mixing by mix in place method with Rotavator at
OMC, and compacting with vibratory roller to achieve the desired density, lighting, guarding and barricading including cost and carriage
of all materials and making necessary earthen bundh of one metre
wide on each side to protect the edges complete as per Clause 401
of Specifications for Road & Bridge Works of MoRT&H (5th Revision).
(i) For Construction of Sub Base by compacting 1st class brick
aggregates (40 mm down) and sand (in proportion of 60:40) ( Ref
:PWD (Rds & Brdgs)-2018, It. No. 4.09 Page No.247 & page-222 sl.
No- 2 & 5 (g)) | 153.6 | CUBIC METER | 2,130.8 | ₹3,27,290.88 |
| 4 | Wet Mix Macadam Base Course Providing, laying, spreading and
compacting graded stone aggregate to Wet Mix Macadam
specification including screening of aggregates and granular
materials, premixing the material with water at OMC in Wet Mix Plant,
carriage of mixed material by tipper to site, laying in uniform layers
with Paver in Sub- base / Base course on well prepared surface and
compacting with Vibratory Roller to achieve the desired density,
including supply of all materials, machinery, fuel and lubricants,
including incidental costs for lighting. guarding, barricading, making
earthen bundh to protect the edges including cost of quality control
complete as per Clause 406 of Specifications for Road & Bridge
Works of MoRT&H (5th Revision).(Rate as per PWD(WB) schedule of
rates 2018(Roads & Bridge Work) , page-249(item-4.12) &
212(table3.3-1) and 4th Addenda & Corrigenda) | 153.6 | CUBIC METER | 2,421.44 | ₹3,71,933.18 |
| 5 | DENSE BITUMINOUS MACADAM [Using Bitumen VG-40 (30/40)]
Providing and laying dense bituminous macadam with Hot Mix Plant
using crushed aggregate of specified grading, filler(Cement /hydrated
lime / Rock dust) premixed with bituminous binder of approved grade
@4.0% (min) for Grading -1 and 4.5% (min) for Grading -2 by weight
of total mix as per table 500-10 and mix design done as per table
500-11 and job mix formula as per clause 505.3.3 of MoRT&H (5th
Revision), including screening, cleaning of chips, transporting the hot
mix to work site, laying the mixed materials at specified laying
temperature, as specified in Table 500-2 with a hydrostatic paver
finisher with sensor control to the required grade, level and alignment
over prepared surface coated with tack coat, rolling with smooth
wheeled and vibratory or tandem rollers or with a pneumatic tyre
roller of 12 to 15 tonne weight with a tyre pressure of at least 0.56
Mpa, to achieve the desired density as per clause 505.3.5, all
including cost and carriage of bitumen, crushed aggregates, filler
materials and hire charges of machinery and equipment for
construction and quality control complete as per Clause 505 of
Specifications for Road & Bridge Works of MoRT&H (5th Revision).
B. For Grading 2 (26.5 mm nominal size, 50-75 mm thick.) (i) Using
Batch Type HMP of minimum capacity 100-120 TPH. (Rate as per
PWD(WB) schedule of rates 2018(Roads & Bridge
Work),page-213(table-3.3-1) & 253(item 5.05)./ 8th Addenda &
Corrigenda , SOR:2018,7th Addenda & Corrigenda SOR 2018) | 57.6 | CUBIC METER | 7,500.3 | ₹4,32,017.28 |
| 6 | Taking out stone slab of kerb & channel of road side drain and
stacking as directed.
b) flat channel stone. ( Ref :Rate based on PWD Current SOR.
[PWD(B)2017,p-303]) | 108 | METER | 8.17 | ₹882.36 |
| 7 | Cement concrete with graded jhama khoa (30 mm size) excluding
shuttering In ground floor and foundation.
(a) 1:3:6 proportion ( Ref :PWD (Bldg.)-2017, It. No. 1, Page No.23 &
3rd Corrigenda Addenda dtd-04.06.18, P-9 & 10 | 12.15 | CUBIC METER | 4,761 | ₹57,846.15 |
| 8 | Resetting of Stone Slabs of kerb & channel of road side drain to
correct line and level including cement pointing (1:2).
b) flat channel stone. ( Ref :Rate based on PWD Current SOR.
[PWD(B) 2017, p-303 & 3rd corri. Addea dtd-04.06.2018. P-52 ]) | 108 | METER | 18.3 | ₹1,976.4 |
| 9 | Supplying and laying factory made flat channel stone of cement
concrete M-20 (1:1.5:3) machanicaly vibrated; size 500mm X 300mm
X 100 mm; making joints with cement mortar (1:4) incldg cost of all
materials and labours but excluding the cost of under bed (for
road-diveder) ( Ref :Rate based on PWD Current SOR [PWD(B)
2017, p-26 (it -10(i)), consumption chart pg-B-60, sl-3 and Annex-II ,
Format-A & 3rd Corr. & adda. dtd-04.06.2018, p-303 , p-191 (i -6)
and 3rd Corr. & Adda, page-52, PWD-2018(R & B) p-332 (it
-18.05)), Chapter-1, pg-227 I-1.03, pg-230,Table-I , Table III-2
pg-226, ) | 864 | EACH | 265.54 | ₹2,29,426.56 |
| 10 | Supplying and laying factory made flat channel stone of cement
concrete M-20 (1:1.5:3) machanicaly vibrated; size 500mm X 300mm
X 100 mm; making joints with cement mortar (1:4) incldg cost of all
materials and labours but excluding the cost of under bed (for
road-diveder) ( Ref :Rate based on PWD Current SOR [PWD(B)
2017, p-26 (it -10(i)), consumption chart pg-B-60, sl-3 and Annex-II ,
Format-A & 3rd Corr. & adda. dtd-04.06.2018, p-303 , p-191 (i -6)
and 3rd Corr. & Adda, page-52, PWD-2018(R & B) p-332 (it
-18.05)), Chapter-1, pg-227 I-1.03, pg-230,Table-I , Table III-2
pg-226, ) | 864 | EACH | 214.63 | ₹1,85,440.32 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.91 MB
tform784.pdf
Tender Documents • 0.93 MB
BOQ_2446433.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .