| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹31.2 LAccepted-AOC MAJARHATI BARPETA P O BARPETA P S BARPETA DISTRICT BARPETA PIN 781301 | BARPETA | ASSAM | 781301 | ₹31.2 L | L1 | Accepted-AOC BEC |
| 2 | L1₹31.2 LRejected-Finance | ₹31.2 L | L1 | Rejected-Finance BEC |
| Sl No | Description | Qty | Unit | Debadib Das L1 | Mrinal Jyoti das L1 |
|---|---|---|---|---|---|
| 1.00 | Earth Work in excavation by mechanical means/manual means over areas (exceeding 30cm in depth,1.50m in width as well as 10sqm on plan) including getting out and disposal of excavated earth, lead upto 50 m and lift upto 1.5 m, as directed by Engineering in-charge 2.6.1, all kinds of soil. | 224.31 | M3 | 120.24 ₹26,971.03 | 120.24 ₹26,971.03 |
| 2.00 | Dry brick on edge flooring in required pattern with bricks of class designation 7.5 on a bed of 12 mm mud mortar, including filling joints with Jamuna sand, with common burnt clay non modular bricks | 241.2 | M2 | 450 ₹1.1 L | 450 ₹1.1 L |
| 3.00 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Mild steel and Medium Tensile steel bars | 14,333.17 | KG | 100 ₹14.3 L | 100 ₹14.3 L |
| 4.00 | Centering and shuttering including strutting, propping etc. and removal
of form for Foundations, footings, bases of columns, etc. for mass
concrete | 80.4 | M2 | 300 ₹24,120 | 300 ₹24,120 |
| 5.00 | Walls (any thickness) including attached pilasters , Butteresses, plinth and string course etc. | 750.4 | M2 | 350 ₹2.6 L | 350 ₹2.6 L |
| 6.00 | Suspended floors, roofs, landings, balconies and access
platform | 187.6 | M2 | 305.41 ₹57,294.92 | 305.41 ₹57,294.92 |
| 7.00 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size de rived from natural sources) | 88.44 | M3 | 9,500 ₹8.4 L | 9,500 ₹8.4 L |
| 8.00 | Reinforced cement concrete work in beams, suspended floors, roofshaving slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinthlevel up to floor five level, excluding the cost of centering , shuttering,finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarsesand(zone-III) derived graded stone aggregate from natural sources : 3 | 21.44 | M3 | 9,000 ₹1.9 L | 9,000 ₹1.9 L |
| 9.00 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent
design mix) | 28.8 | M3 | 4,000.06 ₹1.2 L | 4,000.06 ₹1.2 L |
| 10.00 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.In cement mortar | 27 | M3 | 1,000.16 ₹27,004.32 | 1,000.16 ₹27,004.32 |
Tender Value
₹32.9 L
EMD Value
₹65,700
Closing Date
26 Dec 2024, 4:00 pmClosed
CHAIRMAN,BMB
BMB
Construction of a Stormwater Drain at L. C. Nayak Road under the Bank Interest of UIDSSMT Scheme.
2024_UDD_40924_1
NIT No. 13 of 2024-25
Open Tender
Civil Works
45 days
BMB
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,000
₹65,700
Yes
9 Feb 2026
7 Dec 2024
27 Dec 2024
7 Dec 2024
26 Dec 2024
7 Dec 2024
Amount
Earth Work in excavation by mechanical means/manual means over areas (exceeding 30cm in depth,1.50m in width as well as 10sqm on plan) including getting out and disposal of excavated earth, lead upto 50 m and lift upto 1.5 m, as directed by Engineering in-charge 2.6.1, all kinds of soil.
Dry brick on edge flooring in required pattern with bricks of class designation 7.5 on a bed of 12 mm mud mortar, including filling joints with Jamuna sand, with common burnt clay non modular bricks
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Mild steel and Medium Tensile steel bars
Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete
Walls (any thickness) including attached pilasters , Butteresses, plinth and string course etc.
Suspended floors, roofs, landings, balconies and access platform
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size de rived from natural sources)
Reinforced cement concrete work in beams, suspended floors, roofshaving slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinthlevel up to floor five level, excluding the cost of centering , shuttering,finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarsesand(zone-III) derived graded stone aggregate from natural sources : 3
Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)
Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.In cement mortar
A Provisional sum (fixed Amount of 1% ) for the items of Contigencies like site clearence,sign board etc of Rs.32521.00 (Not to be changed by the Bidders in BOQ)
Mrinal Jyoti das (BID ID -252824)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid