Loading
Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.3 LAccepted-Finance | ₹2.3 L | 1 | Accepted-Finance low |
| 2 | 2₹2.3 LAccepted-Finance | ₹2.3 L | 2 | Accepted-Finance high |
| Sl No | Description | Qty | Unit | SP CONSTRUCTION L2 | velmurugan.s L1 |
|---|---|---|---|---|---|
| 1.00CONSTRUCTION OF DRAIN WITH CULVERT | |||||
| 1.01 | Earthwork excavation in all soils and sub soils except hard rock requiring blasting with initial lead and lift including re-filling the sides of foundation in layer of 15 cm thick watering , ramming ,depositing the surplus earth in the premises as directed by departmental officers etc., complete as per standard specification. as per SS 20 B TNDSS NO: 23&24VI (S2), VII 9,10 | 53 | Cum | 159.5 ₹8,453.5 | 159.25 ₹8,440.25 |
| 2.00 | Plain cement concrete 1:4:8 mix ( One Part of Cement,Four Part of Sand and Eight Part of aggregates) using 40 mm ISS HBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying,consolidating and curing etc complete as per the standard specifications. TNDSS NO: 28 V, VI (S2) V,VI (S5A) VII | 7.5 | Cum | 4,640 ₹34,800 | 4,639.5 ₹34,796.25 |
| 3.00 | Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. (Payment for centering shall be given after the concrete is laid) | 172 | Sqm | 250 ₹43,000 | 249.3 ₹42,879.6 |
| 4.00 | Vibrated Plain Cement Concrete 1:3:6 Mix (One part of cement, three part of sand and six part of aggrigate) using 20 mm size ISS HBG metal from approved quarry including cost and conveyance of all materials to site. Loading and unloading charges and labour charges for mixing. Laying and curing etc. complete. Complying with standard. specifications.. TNDSS NO: 24 | 25.5 | Cum | 5,403.95 ₹1,37,800.73 | 5,403.7 ₹1,37,794.35 |
| 5.00 | Supply and fixing of RCC Non Pressure spun Pipe of size 300mm as per 458/2003 with socket and spigot ends with suplhate reswistant cement with 12mm high alumina lining rubber ring joint including cost and conveyance of all materials and all labour charges etc complete | 7 | RM | 1,023 ₹7,161 | 1,023 ₹7,161 |
| 7.00 | Finishing the top of flooring with granothatic flooring with cement concrete 1:2:4 (one cement, two sand and four aggrigate) using 10 to 12mm stone chips – 25mm tk etc., including cost and conveyance of all materials to work site and all labour charges for mixing, laying,consolidating and curing etc complete as per the standard specifications. | 21 | Sqm | 150.8 ₹3,166.8 | 150.5 ₹3,160.5 |
Tender Value
₹2.8 L
EMD Value
₹2,800
Closing Date
29 Jan 2024, 3:00 pmClosed
Executive Officer,Vadamadurai Town Panchayat
Vadamadurai town panchayat
Construction of Drainage at 8th ward muthu nagar in Vadamadurai Town Panchayat
2024_DTP_412476_1
191/2023(4)
Open Tender
Civil Works
60 days
Vadamadurai Town Panchayat
asper norms
2 documents required · 2 mandatory
₹0
₹2,800
Yes
17 Jun 2026
24 Jan 2024
29 Jan 2024
24 Jan 2024
29 Jan 2024
24 Jan 2024
24 Jan 2024 - 29 Jan 2024
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid