| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹40.2 LAdmitted-Finance | ₹40.2 L | L1 | Admitted-Finance |
| 2 | L2₹40.4 LAdmitted-Finance | ₹40.4 L | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | K MANIKANNAN L1 | mitesh construction L2 |
|---|---|---|---|---|---|
| 1.00 | Ordinary soil SS20A Earth work excavating and depositing on bank with initial lead of 10m and initial lift of 2 m in sand, silt or other loose soil, wet sand or silt not under, light black cotton soil sandy loam and ordinary soil including excavated earth SS.20.A MORTH NO.301 | 27 | M3 | 2,222.1 ₹2,222.10 | 2,241 ₹2,241 |
| 2.00 | Construction of Granular Sub-base by providing close graded material,mixing in a machanical plant at OMC,carriage of mixed material to work site,spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to acheive the desired density,Complete as per clause 401. | 40.5 | M3 | 1,17,389.25 ₹1.2 L | 1,17,652.5 ₹1.2 L |
| 3.00 | Providing, Laying, Spreading and Compacting grading aggregates to WET MIX MECADAM Specification in 250mm thick in two layers each layer in 125mm thick including premixing the materials with water at OMC in mechanical mix plant. Cariage of mixed materials by tipper to work site laying in uniform layers with pavers in sub base/base course on well prepared surface and compacting with vibratory roller to acheive the desired density etc complete 111,112,406 &900 MORTH Specification | 95 | M3 | 2,98,110 ₹3.0 L | 2,98,775 ₹3.0 L |
| 4.00 | Providing and applying of Prime coat using emulsion bitumen at the rate of 7kg per 10m2 over the WET MIX MECADAM Surface preparatory to another bituminous construction over it etc. complete. MORTH 502 | 945 | M2 | 82,876.5 ₹82,876.50 | 85,050 ₹85,050 |
| 5.00 | Providing and applying of Tack coat over WMM Surface treated with prime coat using 2.50kg bitiminous emulsion per 10m2 As per 111,112,501,503,&900 MORTH Specification | 945 | M2 | 19,183.5 ₹19,183.50 | 20,790 ₹20,790 |
| 6.00 | Providing and laying Tack Coat over existing B.T Surface using 2.00 Kg of Bitumen Emulsion (RS1) per 10 sqm for prparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5 | 2,708 | M2 | 78,829.88 ₹78,829.88 | 89,364 ₹89,364 |
| 7.00 | Providing and laying 50mm consolidated thick Dense Bituminous Macadam using 0.24cum of 26.50-13.20mm,0.25cum of 13.20-2.36mm and 0.23cum of 2.36mm &below and with 53.20 Kgs of VG30/VG40 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMPsite,heating the bitumen and aggregate to required temperature and mixing the min required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to work site, spreading the mix to uniform thickness of 50mm with paver to the specified grades and cross sections and compacted by Vibratory/Pneumatic Roller to the required density etc.,including labou for attending to paver at site etc.,including hire charges and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher / 9m paver finisher, Vibratory/Pneumatic rollers and all other tools and plant required, including fuel and all other incidental charges etc.,complete a sper specification using CMP as per clause 505 MORTH Rev-5 | 183 | M3 | 20,76,135 ₹20.8 L | 20,80,710 ₹20.8 L |
| 8.00 | Providing and laying Bituminous Concrete 30mm Consolidated thick using 0.13 cum of 19.00 – 9.50mm,0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 mm & below with 45.27 kgs of 60/70 Grade Bulk bitumen and 5.03 kgs of shredded plastic for premixing per 10 Sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20 – 30 ton capacity, Conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40 mm with mechanical pavers to the specified grades and cross sections and compaction by Vibratory/Pneumatic rollers to the required density etc., including labour for loading bitumen into bitumen tank and Metal to feeder unit, labour for attending to paver site etc., including hire charges and fuel charges for 20 – 30 ton CMP With bitumen boiler tipper,trucks, paver Finisher/9M, Vibrator rollers and all other tools and plants required,including all other incidental charges etc., complete as per standard specification using CMP Clause 507 of MORTH Rev-5 | 110 | M3 | 13,45,410 ₹13.5 L | 13,47,500 ₹13.5 L |
Tender Value
₹48.5 L
EMD Value
₹48,500
Closing Date
23 Jan 2026, 3:00 pmClosed
Executive Officer
Swamimalai Town Panchayat
Improvement of BT Road at Murari Colony, Abinaya Nagar, Abinaya Nagar 1st Cross, Abinaya Nagar 2nd Cross, Abinaya Nagar 3rd Cross, Muslim Street main road, Muslim Street 1st Cross, Muslim Street 2nd Cross, Rahmath Nagar Main, Rahmath Nagar 1st Cross
2026_DTP_641988_1
458/2025/A
Open Tender
Civil Works - Roads
180 days
Swamimalai Town Panchayat
Please Refer the Tender Documents
3 documents required · 3 mandatory
₹0
₹48,500
Yes
2 Feb 2026
10 Jan 2026
23 Jan 2026
10 Jan 2026
23 Jan 2026
10 Jan 2026
10 Jan 2026 - 23 Jan 2026
Ordinary soil SS20A Earth work excavating and depositing on bank with initial lead of 10m and initial lift of 2 m in sand, silt or other loose soil, wet sand or silt not under, light black cotton soil sandy loam and ordinary soil including excavated earth SS.20.A MORTH NO.301
Construction of Granular Sub-base by providing close graded material,mixing in a machanical plant at OMC,carriage of mixed material to work site,spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to acheive the desired density,Complete as per clause 401.
Providing, Laying, Spreading and Compacting grading aggregates to WET MIX MECADAM Specification in 250mm thick in two layers each layer in 125mm thick including premixing the materials with water at OMC in mechanical mix plant. Cariage of mixed materials by tipper to work site laying in uniform layers with pavers in sub base/base course on well prepared surface and compacting with vibratory roller to acheive the desired density etc complete 111,112,406 &900 MORTH Specification
Providing and applying of Prime coat using emulsion bitumen at the rate of 7kg per 10m2 over the WET MIX MECADAM Surface preparatory to another bituminous construction over it etc. complete. MORTH 502
Providing and applying of Tack coat over WMM Surface treated with prime coat using 2.50kg bitiminous emulsion per 10m2 As per 111,112,501,503,&900 MORTH Specification
Providing and laying Tack Coat over existing B.T Surface using 2.00 Kg of Bitumen Emulsion (RS1) per 10 sqm for prparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5
Providing and laying 50mm consolidated thick Dense Bituminous Macadam using 0.24cum of 26.50-13.20mm,0.25cum of 13.20-2.36mm and 0.23cum of 2.36mm &below and with 53.20 Kgs of VG30/VG40 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMPsite,heating the bitumen and aggregate to required temperature and mixing the min required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to work site, spreading the mix to uniform thickness of 50mm with paver to the specified grades and cross sections and compacted by Vibratory/Pneumatic Roller to the required density etc.,including labou for attending to paver at site etc.,including hire charges and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher / 9m paver finisher, Vibratory/Pneumatic rollers and all other tools and plant required, including fuel and all other incidental charges etc.,complete a sper specification using CMP as per clause 505 MORTH Rev-5
Providing and laying Bituminous Concrete 30mm Consolidated thick using 0.13 cum of 19.00 – 9.50mm,0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 mm & below with 45.27 kgs of 60/70 Grade Bulk bitumen and 5.03 kgs of shredded plastic for premixing per 10 Sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20 – 30 ton capacity, Conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40 mm with mechanical pavers to the specified grades and cross sections and compaction by Vibratory/Pneumatic rollers to the required density etc., including labour for loading bitumen into bitumen tank and Metal to feeder unit, labour for attending to paver site etc., including hire charges and fuel charges for 20 – 30 ton CMP With bitumen boiler tipper,trucks, paver Finisher/9M, Vibrator rollers and all other tools and plants required,including all other incidental charges etc., complete as per standard specification using CMP Clause 507 of MORTH Rev-5
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.44 MB
Tendernotice_2.pdf
PDF • 0.84 MB
BOQ_768969.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid