Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.5 CrAccepted-AOC | L1 | Accepted-AOC Accepted | |
| 2 | L2₹6.9 Cr+₹12.9 L (1.90%)Rejected-AOC 4 6 1 KALABAIRAVANKADU AYAKKARANBULAM II VEDHARANYAM TALUK NAGAPATTINAM DISTRICT 614707 | AYAKKARANBULAM | NAGAPATTINAM | TAMIL NADU | 614707 | L2 | Rejected-AOC Rejected | |
| 3 | L3₹7.1 Cr+₹24.8 L (3.65%)Rejected-AOC NO 75 76 DHANALAKSHMI NAGAR EXTENSION GUNDUSALAI CUDDALORE 607001 | CUDDALORE | CUDDALORE | TAMIL NADU | 607001 | L3 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | MUTHUSWAMY CONSTRUCTION L3 | VIJAYASANKAR R L1 | SRI EZHUMALAIYANCONSTRUCTION L2 |
|---|---|---|---|---|---|---|
| 1.00 | Dismantling, clearing away and carefully stacking materials useful for re-use for any thickness of Brick / stone masonry in Cement mortar walls under 3m high etc., complete complying with standard specification. | 38 | cum | 303 ₹11,514 Lowest | 303 ₹11,514 Lowest | 303 ₹11,514 Lowest |
| 2.00 | Dismantling of RCC clearing away and carefully stacking materials useful for re-use etc., complete complying with standard specification. | 9 | cum | 4,700 ₹42,300 | 4,610 ₹41,490 Lowest | 4,610 ₹41,490 Lowest |
| 3.00 | Dismantling, clearing away and carefully stacking materials useful for re-use for AC sheet roofing without roof timbers etc., complete complying with standard specification. | 21 | sqm | 19 ₹399 Lowest | 19 ₹399 Lowest | 19 ₹399 Lowest |
| 4.00 | Dismantling, clearing away and carefully stacking materials useful for re-use for Chipping of concrete & roughening the surface etc., complete complying with standard specification. | 387 | sqm | 43 ₹16,641 Lowest | 43 ₹16,641 Lowest | 43 ₹16,641 Lowest |
| 5.00 | Dismantling, clearing away and carefully stacking materials useful for re-use for Floor finish and dadooing walls in cement mortar with mosaic tiles / glazed tiles / cuddapah slabs etc., complete complying with standard specification. | 153 | sqm | 66 ₹10,098 Lowest | 66 ₹10,098 Lowest | 66 ₹10,098 Lowest |
| 6.00 | Earth work excavation for foundation by Mechanical means for Isolated & Combined Footing etc in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms etc., complete complying with standard specification and as directed by the departmental officers.- Upto 2.40m Footing Depth.Data worked out for 48 m3 per day/8 hrs. | 1,332 | cum | 364 ₹4,84,848 Lowest | 364 ₹4,84,848 Lowest | 364 ₹4,84,848 Lowest |
| 7.00 | Earth work Open excavation by Mechanical Means for Open Earthwork in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the
surplus earth within the compound in places shown by the departmental officers with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms etc., complete complying with standard specification and as directed by the departmental officers.Upto 2.40m Depth. Data worked out for 64 m3 per day/8 hrs. | 139 | cum | 197 ₹27,383 Lowest | 197 ₹27,383 Lowest | 197 ₹27,383 Lowest |
| 8.00 | Supplying and filling in foundation, basement, etc with Sand Gravel mix in ratio of 1:3 in layers of not more than 15cm thick thoroughly mixed, well watered, rammed with surface vibrator and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 287 | cum | 1,388 ₹3,98,356 Lowest | 1,388 ₹3,98,356 Lowest | 1,388 ₹3,98,356 Lowest |
| 9.00 | Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and including curing etc. complete complying with standard specification and as directed by the departmental officers -Mixing by mechanical means | 137.5 | cum | 6,450 ₹8,86,875 | 6,350 ₹8,73,125 Lowest | 6,400 ₹8,80,000 |
| 10.00 | Cement Concrete 1:5:10 (One cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken jelly for flooring including laying, consolidating,finishing, rendering the top surface rough to receive the floor, curing, etc. complete complying with standard specification and as directed by the departmental officers. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers - Mixing by mechanical means | 56 | cum | 6,450 ₹3,61,200 | 6,350 ₹3,55,600 Lowest | 6,400 ₹3,58,400 |
Tender Value
₹6.5 Cr
EMD Value
₹3.4 L
Closing Date
2 Dec 2025, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Chief Engineer
Office of Chief Engineer, Public Works Department, Projects, Chepauk, Chennai 05
Construction of 24 class rooms, 1 Boys and 1 Girls Toilet in Govt Arts College, Chidambaram.
2025_HE_623401_1
Chidambaram_2025
Open Tender
Civil Works - Buildings
Lump-sum
420 days
Chidambaram
Please refer Tender documents.
9 documents required · 9 mandatory
₹0
₹3.4 L
Yes
7 Mar 2026
14 Nov 2025
3 Dec 2025
14 Nov 2025
2 Dec 2025
14 Nov 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Dismantling, clearing away and carefully stacking materials useful for re-use for any thickness of Brick / stone masonry in Cement mortar walls under 3m high etc., complete complying with standard specification. | |||||
| 2Dismantling of RCC clearing away and carefully stacking materials useful for re-use etc., complete complying with standard specification. | |||||
| 3Dismantling, clearing away and carefully stacking materials useful for re-use for AC sheet roofing without roof timbers etc., complete complying with standard specification. | |||||
| 4Dismantling, clearing away and carefully stacking materials useful for re-use for Chipping of concrete & roughening the surface etc., complete complying with standard specification. | |||||
| 5Dismantling, clearing away and carefully stacking materials useful for re-use for Floor finish and dadooing walls in cement mortar with mosaic tiles / glazed tiles / cuddapah slabs etc., complete complying with standard specification. | |||||
| 6Earth work excavation for foundation by Mechanical means for Isolated & Combined Footing etc in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms etc., complete complying with standard specification and as directed by the departmental officers.- Upto 2.40m Footing Depth.Data worked out for 48 m3 per day/8 hrs. | |||||
| 7Earth work Open excavation by Mechanical Means for Open Earthwork in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms etc., complete complying with standard specification and as directed by the departmental officers.Upto 2.40m Depth. Data worked out for 64 m3 per day/8 hrs. | |||||
| 8Supplying and filling in foundation, basement, etc with Sand Gravel mix in ratio of 1:3 in layers of not more than 15cm thick thoroughly mixed, well watered, rammed with surface vibrator and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | |||||
| 9Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and including curing etc. complete complying with standard specification and as directed by the departmental officers -Mixing by mechanical means | |||||
| 10Cement Concrete 1:5:10 (One cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken jelly for flooring including laying, consolidating,finishing, rendering the top surface rough to receive the floor, curing, etc. complete complying with standard specification and as directed by the departmental officers. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers - Mixing by mechanical means | |||||
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.23 MB
BOQ_745413.xls
BOQ • 0.56 MB
Chidambaram_CoverI.pdf
Tender Documents • 0.80 MB
Chidambaram_CoverII.pdf
Additional Documents • 2.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .