| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.8 LAccepted-AOC | ₹14.8 L | L1 | Accepted-AOC Low level quoted rate |
| 2 | L2₹15.4 LRejected-Finance | ₹15.4 L | L2 | Rejected-Finance High level quoted rate |
| Sl No | Description | Qty | Unit | PRABHU L2 | M/S MUNISHWARAN TRADERS L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation in all clauses of soil except hard rock which required blasting such as hard red earth, shalls, murrams including all cost and all labour charges etc.complete. As per SS 20B for foundation | 34 | Cum | 300 ₹10,200 | 263 ₹8,942 |
| 2.00 | Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) .GSB Grading III | 59.5 | Cum | 2,500 ₹1.5 L | 2,444 ₹1.5 L |
| 3.00 | CC 1:4:8 mix using 40mm ISS HBG Metal including all cost and conveyance etc.complete. | 73.1 | Cum | 5,500 ₹4.0 L | 5,267 ₹3.9 L |
| 4.00 | Supplying and centering shuttering including necessary supports for plane and conveyance of all materials to site and all labour charges etc comoplete | 289 | Sqm | 550 ₹1.6 L | 547 ₹1.6 L |
| 5.00 | Cement concrete 1:2:4mix using 20mm ISS HBG metal including all cost and labour charges etc.complete . Complying with standard specification etc. | 36.13 | Cum | 6,800 ₹2.5 L | 6,576 ₹2.4 L |
| 6.00 | Cement Concrete 1:1.5:3 (One Cement, one and half Sand and three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and curing etc. complete complying with standard specification | 44.63 | Cum | 7,500 ₹3.3 L | 7,128 ₹3.2 L |
| 7.00 | Supplying and fixing of Bitumen pad for expansion joints | 8.93 | Sqm | 250 ₹2,232.50 | 234 ₹2,089.62 |
| 8.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works.
{ GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount (in Rupees) | 2,34,466.47 ₹2.3 L | 2,25,947.49 ₹2.3 L |
Tender Value
₹15 L
EMD Value
₹15,000
Closing Date
24 Dec 2025, 3:00 pmClosed
Block Development Officer,Uthiramerur
Block Development Office,Uthiramerur
Providing CC Road in Gangaiyamman Koil Street at Paleshwaram Panchayat under PMAGY 2025-26
2025_RDTN_634978_1
R.C.No.DRDA/179/2025/A14 Dt.28.11.2025
Open Tender
Civil Works
Uthiramerur
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹15,000
5 Feb 2026
22 Dec 2025
24 Dec 2025
22 Dec 2025
24 Dec 2025
22 Dec 2025
Earth work excavation in all clauses of soil except hard rock which required blasting such as hard red earth, shalls, murrams including all cost and all labour charges etc.complete. As per SS 20B for foundation
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) .GSB Grading III
CC 1:4:8 mix using 40mm ISS HBG Metal including all cost and conveyance etc.complete.
Supplying and centering shuttering including necessary supports for plane and conveyance of all materials to site and all labour charges etc comoplete
Cement concrete 1:2:4mix using 20mm ISS HBG metal including all cost and labour charges etc.complete . Complying with standard specification etc.
Cement Concrete 1:1.5:3 (One Cement, one and half Sand and three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and curing etc. complete complying with standard specification
Supplying and fixing of Bitumen pad for expansion joints
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_759820.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.10 MB
Schedule.pdf
Tender Documents • 0.38 MB
BOQ_759820.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid