Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.9 LAccepted-AOC | ₹2.9 L | L1 | Accepted-AOC L1 |
| 2 | L2₹2.9 LRejected-AOC | ₹2.9 L | L2 | Rejected-AOC L2 |
| 3 | L3₹2.9 LRejected-AOC | ₹2.9 L | L3 | Rejected-AOC L3 |
| 4 | L4₹2.9 LRejected-AOC | ₹2.9 L | L4 | Rejected-AOC L4 |
Tender Value
₹2.9 L
EMD Value
₹5,724
Closing Date
15 Dec 2025, 10:30 amClosed
Executive Officer
Executive Officer Kalimpong-l Panchayat Samiti
Construction of Protection Wall near Jalpa Community Hall (near dhara).Booth No. 180 under Bong GP, within Kalimpong I Panchayat Samiti under Amader Para Amader Samadhan
2025_GTA_951618_2
EO/KPG-I/P.S/eNIT-14/2025-26
Open Tender
Electrical Work/ Equipment
45 days
kalimpong
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹5,724
Yes
3 Feb 2026
17 Nov 2025
17 Dec 2025
17 Nov 2025
15 Dec 2025
17 Nov 2025
Ref.PWD(WB)/BUILDING WORKS/PG-01-ITEM-2 E/W in excavation of foundation trenches or drains in all sorts of soils (including mixed soil but excluding laterite or sand stone) including removing, spreading or stacking the spoils within a lead of 75m as directed. The item includes necessary trimming the sides of trenches, ievelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1500mm
Ref.PWD(WB)/BUILDING WORKS/PG-229-ITEM-12 Labour for laying 150 mm to 200 mm boulder soling including rough dressing hand packing and ramming down small pieces in the interstics including rolling and preparing the bed to proper level and filling up all joints with sandy clay or earth. without rolling but including ramming..
Ref.PWD(WB)/BUILDING WORKS/PG-302-ITEM-18 Cost of Stone boulder 150 mm size delivered and stacked at site
PWD(WB)/BUILDING WORKS(CCS)/Page-34/Item-22II (II) Cement Concrete with 30 mm down graded shingles excluding shutrtering. N.B Variety. In ground floor. (a) 1:3:6 proportion
PWD(WB)/BUILDING WORKS(CCS)/Page-22/Item-44 Rubble masonry in cement (1:6) with hard dressed stones from approved quarries and clean, coarse and washed sand including carriage of all materials to siten
Ref.PWD(WB)/BUILDING WORKS/PG-42-ITEM-36.a Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor) (a) 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-In-Charge.
Contigency added @2%
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.50 MB
BOQ_2274821.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid