Loading…
Loading…
Tender Value
₹7.2 L
EMD Value
₹14,440
Closing Date
28 Sept 2026, 11:00 am6d left
Executive engineer
Heerawala
Annual rate contract for Work for Removing of Leakages in various size pipe line at various JJY scheme and operation of valve at JJY scheme Dhola under Jen section II Sub division Jamwaramgarh
2026_PHCJA_597623_1
EE PHED Dn JR NIT No 31/2026-27
Open Tender
Civil Works - Water Works
Percentage
365 days
Heerawala
as per TD
4 documents required · 4 mandatory
₹1,000
40796 EE PHED DIVISION JAMWARAMGARH
₹14,440
Yes
14 Sept 2026
14 Sept 2026
28 Sept 2026
14 Sept 2026
28 Sept 2026
14 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Maintenance of pipelines irrespective of size & material which includes Repairing of Bursts & leakages pollution control, survey & removal of choking, disconnection of illegal connections, Collection & recording minimum 10 nos. residual chlorine samples during supply timings, interconnections and all works related to pipeline network in existing distribution /rising main pipe lines of all sizes by digging out suitable size of pit in soft and loose soil/ hard soil including cutting of Black top, WBM & CC top of road of any size at work site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material to make repair leak proof and refilling of pit by excavated sand by ramming it at sides of pipes and upto ground level. For entire job contractor will use their own T & P. Contractor with his own resources shall arrange de-watering,JCB & Tractor compressor if any and restore any amenity at his own cost damaged while performing the work in this item. The work includes daily patrolling and repair the leakages within stipulated time and complete maintenance of pipe line network of rising and distribution pipeline network within the scope of work for per km pipe line per month.
Jointing material shall be provided by the department. | - | - | - | - |
| 2 | Minimum labour for a following kms pipelines to be deployed. | - | - | - | - |
| 3 | 1 km to 50 km - one fitter-II & one beldar
51 km to 100 km - one fitter-II & two beldar
(length of pipeline = 74.965Km)
Rates are exclusive of GST) | - | Per Km/Month | 666.95 | - |
| 4 | Daily/ periodical operation of valves at supply times for specified by department per sluice valve per month.
(Valve rod and cap to be arranged by contractor)
Rates are exclusive of GST)
80-300 mm | 120 | Per Km/Month | 1,016.95 | ₹1,22,034 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.78 MB
BOQ_1059605.xls
BOQ • 0.31 MB
TD31.pdf
Tender Documents • 7.58 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .