Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹23.7 CrAdmitted-Finance LB SHILPANGAN CF BUILDING SALT LAKE NORTH 24 PARGANAS WEST BENGAL 700098 | 24 PARAGANAS NORTH | WEST BENGAL | 700098 | ₹23.7 Cr | L1 | Admitted-Finance |
| 2 | L2₹27.1 CrAdmitted-Finance | ₹27.1 Cr | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | Rejected-Technical REJECTED |
| 4 | Rejected-Technical | - | - | Rejected-Technical REJECTED |
| Sl No | Description | Qty | Unit | Maheshwari Mining Pvt. Ltd. L1 | DCS Limited L2 |
|---|---|---|---|---|---|
| 1.00Laying and Jointing PVC Pipe. Heading | |||||
| 1.01 | Sinking of incline size 5.00m wide x 3.5m height | 514 | Metre | 4,62,062.25 ₹23.7 Cr | 5,27,004 ₹27.1 Cr |
Tender Value
₹25.3 Cr
EMD Value
₹50 L
Closing Date
18 Feb 2025, 3:00 pmClosed
General Manager
Tamra Bhawan, 1, Ashutosh Chowdhury Avenue, KOLKATA 700019
TENDER DOCUMENT FOR 514 METERS SINKING OF NORTH VENTILATION INCLINE FROM SURFACE AT KOLIHAN COPPER MINE, RAJASTHAN, INDIA
2025_HCL_222732_1
HCL/MnC/CO/KCC/NVI/2025
Open Tender
Mining
1095 days
KOLIHAN
As per NIT
4 documents required · 4 mandatory
₹0
₹50 L
Yes
WEBEX
28 Apr 2025
4 Jan 2025
19 Feb 2025
4 Jan 2025
18 Feb 2025
24 Jan 2025
16 Jan 2025
Amount
Laying and Jointing PVC Pipe. Heading
Sinking of incline size 5.00m wide x 3.5m height
DCS Limited (BID ID -819549)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.35 MB
BOQ_248266.xls
BOQ • 0.23 MB
BOQ.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid