Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹1.8 Cr
EMD Value
₹11.1 L
Closing Date
18 Mar 2026, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
S.E, Jhansi Circle, P.W.D., Jhansi
Office of the S.E, Jhansi Circle, P.W.D., Jhansi
Construction of Remaining part of Atarchala to Uud link road in Km- 1,2 and 3(700)
2026_CEJNS_1123522_1
1262/ 44 C- Jhansi Circle/2025 Date 10.03.2026
Open Tender
Civil Works - Roads
Fixed-rate
365 days
Orai (Jalaun)
Please refer Tender documents.
3 documents required · 3 mandatory
₹4,759
₹11.1 L
Yes
Office of the S.E, Jhansi Circle, P.W.D., Jhansi
13 Apr 2026
11 Mar 2026
18 Mar 2026
11 Mar 2026
18 Mar 2026
11 Mar 2026
12 Mar 2026
Construction of embankment with approved material obtained from local pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 (Page 3-3) Including cost of material labour and T&P but excluding cost of GST.
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with al lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table 300.2 with lead uo to 1000 m as per techmnical spacification cause 303.1 including stablization with 2% staked lime including its mixing with rotabator complate two layer. Including cost of material labour and T&P but excluding cost of GST.
Providing , laying and spreading material on a prepared sub grade, adding Cemented Sub Base GSB 2% Cement by weight to the spread material manually, mixing in place with rotavator and compacting with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of sub-base. . Including cost of material labour and T&P but excluding cost of GST.
Providing , laying and spreading and compacting graded stone aggregate to wet mix macadam specification stablized with @ 4%cement including premixing the material with water at OMC in mechanical mixer (pug mill) carriage of mixed material by tipper ot site. Including cost of material labour and T&P but excluding cost of GST.
Providing and applying tack coat with Bitumen VG-10 using bitumin pressure distributor at the rate of 0.30 kg per sqm on the prepared dry and hungry bituminous surface cleaned with Air compressor as per Technical Specification Clause 503. (Page 5-4) Including cost of material labour and T&P but excluding cost of GST.
Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a sutable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either type A or Type B or Type C as per Technical Sepecification Clause 508. (Page 5-26) Including cost of material labour and T&P but excluding cost of GST.
Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 510 (Page 5-52) Including cost of material labour and T&P but excluding cost of GST.
Earthwork in excavation for structures as per drawing and technical specifications clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal up to a lead of 50 m, dressing of sides and bottom and back filling in trenches with excavated suitable material. Including cost of material labour and T&P but excluding cost of GST.
Sand filling in foundation trenches abutment wall etc,in layers including watering ,compacting including all lead & lift and also all materials ,labour,T&P etc. required for proper completion of work . Including cost of material labour and T&P but excluding cost of GST.
Brick masonry work in 1:4 cement mortar in foundation complete excluding pointing and plastering as per drawing and technical specifications clauses 600,1200 & 1203 (Brick masonry in 1:4 cement mortar) Including cost of material labour and T&P but excluding cost of GST.
Plastering with cement mortar (1:4) mm thick on brick work in substructure as per techinical specification clauses 613.4 & 1204. Including cost of material labour and T&P but excluding cost of GST.
Providing concrete for plain/reinforced concrete in open foundations complete as per drawing and technical specifications clauses 802,803,1202 & 1203 (P.C.C grage M-15) Including cost of material labour and T&P but excluding cost of GST.
Supply & Laying of Hume pipe S & S Type in position with cement and sand mortar in 1:2 withsun including labour and T & P etc. required for proper completion of work as per direction of by the Engineer-in-charge (Labour rate only) N.P-3-Type (a) 350 mm dia . Including cost of material labour and T&P but excluding cost of GST.
Supply & Laying of Hume pipe S & S Type in position with cement and sand mortar in 1:2 withsun including labour and T & P etc. required for proper completion of work as per direction of by the Engineer-in-charge (Labour rate only) N.P-3-Type (a) 1000 mm dia . Including cost of material labour and T&P but excluding cost of GST.
Providing concrete for plain/reinforced concrete in open foundations complete as per drawing and technical specifications clauses 802,803,1202 & 1203 (Nominal mix 1:3:6) Including cost of material labour and T&P but excluding cost of GST.
Providing concrete for reinforced concrete in bed block and slab complete as per drawing and technical specifications clauses 802,803,1202 & 1203 (R.C.C grade M-20) Including cost of material labour and T&P but excluding cost of GST.
Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in substructrue complete as per drawings and technical specification Clauses 1002,1005,1010 & 1202 Including cost of material labour and T&P but excluding cost of GST.
Back filling behind abutment, wing wall and return wall complete as per drawings & technical specification clause 1204.3.8 Including cost of material labour and T&P but excluding cost of GST.
Supply & fixing Km. Stone and theire pinting & Lerter writing etc. complete.( Ch-10 page-17-18) Including cost of material labour and T&P but excluding cost of GST.
Supply & fixing HM Stone and theire pinting & Lerter writing etc. complete.( Ch-10 page-17-18) Including cost of material labour and T&P but excluding cost of GST.
Construction of embankment with approved material obtained from local pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 (Page 3-3) Including cost of material labour and T&P but excluding cost of GST.
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with al lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table 300.2 with lead uo to 1000 m as per techmnical spacification cause 303.1 including stablization with 2% staked lime including its mixing with rotabator complate two layer. Including cost of material labour and T&P but excluding cost of GST.
Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth roller to achieve the desired density, complete as per clause 401. for Grading-I (Ch- 4 page- 2) Including cost of material labour and T&P but excluding cost of GST.
Providing laying spreading and compacting stone aggregates of specific size to water bound macadam specification including spreading in uniform thickness, hand packing rolling with three wheel 80-100 KN static roller in stages to proper grade and camber , Applying and brooming crushable screening to fill up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per MORD specifications 405-3 (Ch- 4 page- 18) Including cost of material labour and T&P but excluding cost of GST.
Cement Concrete Pavement Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days, using curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501. Including cost of material labour and T&P but excluding cost of GST.
Earthwork in excavation for structures as per drawing and technical specifications clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal up to a lead of 50 m, dressing of sides and bottom and back filling in trenches with excavated suitable material. Including cost of material labour and T&P but excluding cost of GST.
Providing concrete for plain/reinforced (M-10) concrete in open foundations complete as per drawing and technical specifications clauses 802,803,1202 & 1203
Brick masonry work in 1:4 cement mortar in foundation complete excluding pointing and plastering as per drawing and technical specifications clauses 600,1200 & 1203 (Brick masonry in 1:4 cement mortar) Including cost of material labour and T&P but excluding cost of GST.
Plastering with cement mortar (1:4) mm thick on brick work in substructure as per techinical specification clauses 613.4 & 1204. Including cost of material labour and T&P but excluding cost of GST.
The routine maintenance of above road work including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 1st year maintenance cost (0.00% Construction Cost) (Excluding GST)
The routine maintenance of above road work including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 2nd year maintenance cost (0.75% Construction Cost) (Excluding GST)
The routine maintenance of above road work including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 3rd year maintenance cost (1.50% Construction Cost) (Excluding GST)
The routine maintenance of above road work including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 4th year maintenance cost (2.25% Construction Cost) (Excluding GST)
The routine maintenance of above road work including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 5th year maintenance cost (3.00% Construction Cost) (Excluding GST)
The routine maintenance of above road work including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 1st year maintenance cost (0.00% Construction Cost) (Excluding GST) CC Work
The routine maintenance of above road work including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 2nd year maintenance cost (0.25% Construction Cost) (Excluding GST) CC Work
The routine maintenance of above road work including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 3rd year maintenance cost (0.50% Construction Cost) (Excluding GST) CC Work
The routine maintenance of above road work including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 4th year maintenance cost (0.75% Construction Cost) (Excluding GST) CC Work
The routine maintenance of above road work including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 5th year maintenance cost (1.00% Construction Cost) (Excluding GST) CC Work
stage.html
html • 0.02 MB
cancelled_1.pdf
pdf • 0.35 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.65 MB
T2.pdf
Tender Documents • 1.32 MB
BOQ_2093036.xls
BOQ • 0.33 MB
1262.pdf
PDF • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .