Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹9.8 LAccepted-AOC | 1 | Accepted-AOC Accepted | |
| 2 | 2₹10.3 L+₹51,597.30 (5.28%)Rejected-Finance | 2 | Rejected-Finance Rejected |
Tender Value
₹13 L
EMD Value
₹13,000
Closing Date
3 Jan 2024, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Officer
Kadambur Town Panchayat
Rejuvenation of Manjakulam ward No 1 Survey no 1 in Kadambur Town Panchayat at Thoothukudi District
2023_DTP_399668_1
79/2023
Open Tender
Civil Works - Others
Works
180 days
Kadambur Town Panchayat
Please Refer Tender Documents
2 documents required · 2 mandatory
₹0
₹13,000
Yes
8 Jan 2024
14 Dec 2023
3 Jan 2024
14 Dec 2023
3 Jan 2024
14 Dec 2023
Amount
Dismantling, claering away and carefully stacking materials useful for reuse any thicknees of walls Brick / Stone masnory in cement mortar walls under 3m High
Earth work excavating and depositing on bank with initial lead of 10 m & initial lift of 2m in Hard stiff clay, stiff black cotton, hard red earth, shales,murram, gravel, stoney earth and earth mixed with small size boulders SS.20B
Dismantling Plain cement concrete complying with standard specification
Earthwork excavation for foundation in all soils and sub soils in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders and to full depth as may be directed,except in hard rock,requiring blasting including shoring and shuttering and bailing out of water wherever necessary,refilling the sides of foundation with excavated earth or sand in layer of not more than 15cm thick.well rammed and consolidated and depositing on bank with initial lead and lift of 10m & initial lift of 2m and depositing the surplusr earth within the compound in places shown by the departmental officers with iniital lead and lifts,clearing and levelling the site etc., complete as per SS20B and as directed by departmental Engineers(TNBP No.17,23,24).
Plain Cement Concrete 1:4:8 mix (One Part of Cement, Four part of Fine Aggregate and Eight part of Coarse Aggregate) Using 40mm ISS HBG metal for foundation and basement including dewatering if found necessary and laid in layer of not more than 15cm thick and consolidated including all cost conveyance of materials and labour charges etc. complete as per standard specifications and as directed by departmental Engineers(TNBP No.28).
Plain Cement Concrete 1:2:4 mix (One part of Cement, Two part of Fine Aggregate and Four part of Coarse Aggregate) Using 20mm ISS HBG metal for foundation and basement including dewatering if found necessary and laid in layer of not more than 15cm thick and consolidated including all cost conveyance of materials and labour charges etc. complete as per standard specifications and as directed by departmental Engineers(TNBP No.28).
Plain Cement Concrete 1:11/2:3 mix (One part of Cement,One and a half part of Fine Aggregate and Three part of Coarse Aggregate) Using 20mm ISS HBG metal for foundation and basement including dewatering if found necessary and laid in layer of not more than 15cm thick and consolidated including all cost conveyance of materials and labour charges etc. complete as per standard specifications and as directed by departmental Engineers(TNBP No.28)( for wearing coat)
Providing Steel Centering for RCC Slabs, beams or plain surfaces including strutting upto 3.29 m high using MS sheets, 10 guage thick of size 90cm x 60cm, Stiffened with Ms angles of size 25mm x 25mm x 3mm laid over silver oak joists of size 10 cm x 6.5 cm spaced at 90 cm c/c and supported by casurina props of 10 cm to 13cm dia spaced at 75 cm c/c and removing the centering and shuttering after specified period without damaging the concrete laid, complying with standard specification and as directed (For Retaining walls and Sluices)
Reinforced Cement Concrete 1:1.5:3 mix (One cement and One and a half Fine Aggregate and Three Coarse Aggregate) Using 20mm ISS HBG metal including all cost conveyance of materials and labour charges for curing,finishing but excluding centering,shuttering and cost of reinforcement grills, including vibrating charges etc. complete as per standard specification and as directed by departmental Engineers(TNBP No.30).
Supplying fabricating and placing in position of M.S/ RTS rods for all RCC works as per design given including cost of steel, binding wire , labour charges for cutting , bending ,laying in positon complete for various depth and height below and above ground level as directed by the departmental engineer complying with standard specification.
Providing Fabricating, Supplying and Erection of Steel Shutters of Size 500mm x 500mm made out of 10mm thick Mild steel as skin plates using ISMC channels 75mm x 40mm x 500mm for horizontal stiffeners minimum 3 Nos and ISMC channels 75mm x 40mm x 400mm for vertical stiffeners 3 Nos and 10mm Mild Steel plate for Gusset Plate 2 Nos of size 200mmx200mm with required bolts and nuts, providing Screw rod the shutter lifted with 50mm dia rod to a length of 3000mm threaded with 6mm square thread of 1000mm. The screw rod operated with Screw Gearing Cast Iron Head set is to be rest on the top ISMC Channels. 2Nos for a of made up of ISMC 100mm x 50mm x 6.2mm x 2nos of 1400mm length fixed to the pier with 20mm dia Foundation bolt 500mm length and fix plate 2Nos. fabrications in Sill ISM Channel of 75mm x 40mm x 800mm length and Groove Channels of 75mm x 40mm length of 3000mm face to face 2 Nos and both Groove side. The whole shutter assembly is painted. Erecting the Shutter assembly by fixing the top beam with necessary materials. The rate is including of all materials, labour charges including Lathing, Drilling, Welding, Gas cutting, hire charges of Crane and also inclusive of cost of all Shutter materials, all bolt and nuts, conveyance to this site, Loading and unloading charges, Grease packing, Lubricating oil, Operating key and Painting with two coats of A/C black paint over one coat of Zinc chromate Primer and checking the Shutter operation etc., complete as directed by the Departmental Officers.
Refixing of cut stone slab set in cm 1:3 (using old available stone) labour charges only.
Refilling with excavated earth after construction of sluice
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete.
Amirah Constructions
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_475801.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .