Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.8 LAccepted-AOC 159A VILLAGE BAJGHERA MAJOR VINOD RANA MARG GURUGRAM HARYANA 122017 | GURUGRAM | GURUGRAM | HARYANA | 122017 | L1 | Accepted-AOC L1 | |
| 2 | L2₹11.2 L+₹37,494.96 (3.47%)Rejected-AOC RAM GOPAL COLONY 1708 10 124001 | ROHTAK | ROHTAK | HARYANA | 124001 | L2 | Rejected-AOC L2 | |
| 3 | L3₹11.9 L+₹1.1 L (10.4%)Rejected-AOC PLOT NUMBER 629 PLOT NO 629 TEMPLE STREET SECTOR 39 NEAR CYBER PARK GURUGRAM 122001 122001 | GURUGRAM | GURUGRAM | HARYANA | 122001 | L3 | Rejected-AOC L3 | |
| 4 | L4₹12.2 L+₹1.4 L (13.2%)Rejected-AOC 314 20 SHAKTI NAGAR GURUGRAM 122001 | GURUGRAM | GURUGRAM | HARYANA | 122001 | L4 | Rejected-AOC L4 | |
| 5 | L5₹13.3 L+₹2.4 L (22.5%)Rejected-AOC | L5 | Rejected-AOC L5 |
| Sl No | Description | Qty | Unit | M/s Jai Hind Enterprises L2 | Ranjan Kumar Contractor L5 | Guru Engineering Works L4 | Liberal Protech Engineering & Facilities Pvt Ltd L3 | The Shri Nath Co Operative Labour and Construction Society Limited L6 | LOHANS GROUP L1 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Supply and topping of 200 KVA and 315 KVA transformer Silicone Transformer Oil - High Dielectric Strength Fluid in conservator tank and including replacement of dirty silica gel in transformers. | 120 | Litre | 94 ₹11,280 Lowest | 180 ₹21,600 | 99 ₹11,880 | 850 ₹1,02,000 | 190 ₹22,800 | 99.9 ₹11,988 |
| 2.00 | Repair and testing including over hauling of 11kv HT Coil and HT Rod 200 KVA Transformer replacement of its defective coil/rod. | 2 | Each | 18,840 ₹37,680 | 2,000 ₹4,000 Lowest | 20,000 ₹40,000 | 50,000 ₹1,00,000 | 25,000 ₹50,000 | 19,998 ₹39,996 |
| 3.00 | operation of tubewell /boosting station (22664) | 12 | Each | 17,792 ₹2,13,504 | 22,000 ₹2,64,000 | 20,000 ₹2,40,000 | 16,000 ₹1,92,000 | 22,000 ₹2,64,000 | 15,992 ₹1,91,904 Lowest |
| 4.00 | Repair of submersible/horizontal pumping sets more than 20BHP for tube wells and boosting stations consisting of mainly of motor pumps, electric panel, starter, cable, CT PT, meter box, MS Pipe, G.I Pipe and all other accessories like sluice valve, NRVs, specials etc. including all appurtenances inside the premises of water works/ boosting station. Vertical Submersible pump set more than 20 HP For Year 2025-2027 | 3,240 | Per Month | 131 ₹4,24,440 | 133 ₹4,30,920 | 124 ₹4,01,760 | 100 ₹3,24,000 Lowest | 133 ₹4,30,920 | 105 ₹3,40,200 |
| 5.00 | Repair of submersible/horizontal pumping sets upto 20BHP for tube wells and boosting stations consisting of mainly of motor pumps, electric panel, starter, cable, CT PT, meter box, MS Pipe, G.I Pipe and all other accessories like sluice valve, NRVs, specials etc. including all appurtenances inside the premises of water works/ boosting station. Vertical Submersible pump set more than 20 HP For Year 2025-2027 | 975 | Per Month | 105 ₹1,02,375 | 168 ₹1,63,800 | 154 ₹1,50,150 | 100 ₹97,500 Lowest | 168 ₹1,63,800 | 100 ₹97,500 Lowest |
Tender Value
₹13.5 L
EMD Value
₹27,039
Closing Date
5 May 2026, 12:00 pmClosed
PARVEEN KUMAR
Municipal Corporation Gurugram
Operation and maintenance of boosting stations and tubewell in Ward No-2 Division No-3A, MCG. Re-call
2026_HRY_517596_1
20263A970F02 5227 4786 BA0B 7C84D4C7C1EF285ULB
Open Tender
Civil Works
Works
140 days
Gurugram
2 documents required · 2 mandatory
₹1,000
₹27,039
Yes
11 May 2026
25 Apr 2026
5 May 2026
25 Apr 2026
5 May 2026
25 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supply and topping of 200 KVA and 315 KVA transformer Silicone Transformer Oil - High Dielectric Strength Fluid in conservator tank and including replacement of dirty silica gel in transformers. | 120 | Litre | - | - |
| 2 | Repair and testing including over hauling of 11kv HT Coil and HT Rod 200 KVA Transformer replacement of its defective coil/rod. | 2 | Each | - | - |
| 3 | operation of tubewell /boosting station (22664) | 12 | Each | - | - |
| 4 | Repair of submersible/horizontal pumping sets more than 20BHP for tube wells and boosting stations consisting of mainly of motor pumps, electric panel, starter, cable, CT PT, meter box, MS Pipe, G.I Pipe and all other accessories like sluice valve, NRVs, specials etc. including all appurtenances inside the premises of water works/ boosting station. Vertical Submersible pump set more than 20 HP For Year 2025-2027 | 3,240 | Per Month | - | - |
| 5 | Repair of submersible/horizontal pumping sets upto 20BHP for tube wells and boosting stations consisting of mainly of motor pumps, electric panel, starter, cable, CT PT, meter box, MS Pipe, G.I Pipe and all other accessories like sluice valve, NRVs, specials etc. including all appurtenances inside the premises of water works/ boosting station. Vertical Submersible pump set more than 20 HP For Year 2025-2027 | 975 | Per Month | - | - |
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.78 MB
BOQ_596465.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .