| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.1 LAdmitted-Fee/PreQual/Technical/Finance 121 THIRUMURUGAN NAGAR VEERIYAMPALAYAM ROAD KALAPATTY POST COIMBATORE 641048 | COIMBATORE | TAMIL NADU | 641048 | ₹6.1 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹6.6 L+₹54,588 (8.96%)Admitted-Fee/PreQual/Technical/Finance | ₹6.6 L+₹54,588 (8.96%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | RSK CONSTRUCTION AND PROJECTS L1 | SRI UTCHI CONSTRUCTION PRIVATE LIMITED L2 |
|---|---|---|---|---|---|
| 1.00 | Shifting of Over Head Line upto a length of 131 m including Supply Delivery ,shifting and erection of existing pole With Following Materials
42 *RSJ (478 KG each) - 3346kg , Base plate - 7 Nos , Tapping channel - 17 Nos , 4 1/2 Cross Arm - 3 Nos , HT TI Fitting - 3 Nos , 3 Ph Cross Arm - 20 No , S Ph Cross Arm - 7 nos , Back Clamp 9 Mtr - 8 Nos , Back Clamp for RSJ - 17 nos , Stay clamp 9 mtr - 6 Pair , Stay clamp for RSJ - 8 Pair , 22 KV Polymer Insulator - 28 Nos , 22 KV polymer Disc - 18 nos , HT Metal parts - 18 nos , LT Shackle - 58 Nos , LT Metal part -58 Nos , LT pin insulator - 12 nos , LT Gi pin - 12 nos , Stay set - 1 Set , Stay plate- 1 nos , Stay wire - 5 kg , GI Thimbles - 2 nos , Stay shackle HT - 2 nos , RSJ for DT Support - 100 Kg , pole Concreting - 7 Loc , GI Wire - 35 Kg , ACSR 7/4.09 - 662 mt , ACSR 7/2.59 - 66 mt , AAAC 7/2.50 - 1003 mt , Bolt & Nut 3 1/2x5/8 - 4 kg , Bolt & Nut 4 1/2x5/8 - 4 kg , MS Washer - 4 Kg
including labour and transport Charges For Loading Unloading ,eraction of new materials at new loaction as directed by the departmental officers . | 1 | JOB | 4,23,190 ₹4,23,190 Lowest | 4,44,000 ₹4,44,000 |
| 2.00 | Shifting of DT Structure including Supply Delivery ,shifting and erection of existing pole With Following Materials
9 Mtr PSC pole - 2 nos , Base plate - 2 nos , Tr.Str.Mat.complete set - 1 no , Tr.Str.Clamp - 1 no , Stay set - 4 nos ,. Stay plate - 4 nos , Stay wire - 20 kg , Stay clamp 9 mt - 4 pair , GI Thimbles - 8 nos ,
Stay Shackle HT - 8 nos , Earth pipe - 3 nos , GI wire - 50 kg , Bolt & nut 2 1/2x5/8 - 3 kg , Bolt & nut 3 1/2 x 5/8 - 3 kg , Bolt & nut 4 1/2 x 5/8 - 3 kg , Bolt & nut 6 x 5/8 - 3 kg , Bold & nut 12 x 5/8 - 3 kg , MS Washer - 3 kg , Structure concreting - 1 Loc , 22 KV AB Switch Complete set - 1 Set , 22 KV HG Fuse - 1 set , 22 KV polymer insulator - 6 nos , 22 KV LAS - 3 nos , LT open type fuse unit - 2 nos , LT LAS - 3 nos
including labour and transport Charges For Loading Unloading ,eraction of new materials at new loaction as directed by the departmental officers . | 1 | JOB | 94,095 ₹94,095 Lowest | 1,10,000 ₹1,10,000 |
| 3.00 | Shifting of DP Structure including Supply Delivery ,shifting and erection of existing pole With Following Materials
9 Mtr PSC pole - 2 nos , Base plate - 2 nos , Double Channel cross Arm - 1 no , Cross Bracing Set - 1 no ,
Stay set - 4 nos , Stay plate - 4 nos , Stay wire - 20 kg , Stay clamp 9 mt - 6 pair , GI Thimbles - 8 nos , Stay Shackle HT - 8 nos , Earth pipe - 2 nos , GI wire - 40 kg , Bolt & nut 2 1/2x5/8 - 5 kg , Bolt & nut 3 1/2 x 5/8 - 5 kg , Bolt & nut 4 1/2 x 5/8 - 5 kg , Bolt & nut 6 x 5/8 - 5 kg , Bold & nut 12 x 5/8 - 5 kg , MS Washer - 5 kg , Structure concreting - 1 Loc , 22 KV AB Switch Complete set - 1 Set , Tapping Channel - 2 nos , Guarding Cross arm - 2 nos , Back Clamp 9 Mt - 2 nos , 22KV LAS - 3 nos
including labour and transport Charges For Loading Unloading ,eraction of new materials at new loaction as directed by the departmental officers . | 1 | JOB | 92,127 ₹92,127 Lowest | 1,10,000 ₹1,10,000 |
Tender Value
₹8 L
EMD Value
₹8,000
Closing Date
22 Sept 2026, 3:00 pmClosed
COMMISSIONER
113 PALAI ROAD THOOTHUKUDI
Shifting of EB pole LT HT line along the buckle canal from Burma colony Bridge to Rajagopal nagar bridge in Thoothukudi Corporation
2026_MAWS_701737_9
E3/2402/2026
Open Tender
Electrical and Maintenance Works
Works
30 days
THOOTHUKUDI MUNICIPAL CORPORATION
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹8,000
22 Sept 2026
5 Sept 2026
22 Sept 2026
5 Sept 2026
22 Sept 2026
5 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Shifting of Over Head Line upto a length of 131 m including Supply Delivery ,shifting and erection of existing pole With Following Materials
42 *RSJ (478 KG each) - 3346kg , Base plate - 7 Nos , Tapping channel - 17 Nos , 4 1/2 Cross Arm - 3 Nos , HT TI Fitting - 3 Nos , 3 Ph Cross Arm - 20 No , S Ph Cross Arm - 7 nos , Back Clamp 9 Mtr - 8 Nos , Back Clamp for RSJ - 17 nos , Stay clamp 9 mtr - 6 Pair , Stay clamp for RSJ - 8 Pair , 22 KV Polymer Insulator - 28 Nos , 22 KV polymer Disc - 18 nos , HT Metal parts - 18 nos , LT Shackle - 58 Nos , LT Metal part -58 Nos , LT pin insulator - 12 nos , LT Gi pin - 12 nos , Stay set - 1 Set , Stay plate- 1 nos , Stay wire - 5 kg , GI Thimbles - 2 nos , Stay shackle HT - 2 nos , RSJ for DT Support - 100 Kg , pole Concreting - 7 Loc , GI Wire - 35 Kg , ACSR 7/4.09 - 662 mt , ACSR 7/2.59 - 66 mt , AAAC 7/2.50 - 1003 mt , Bolt & Nut 3 1/2x5/8 - 4 kg , Bolt & Nut 4 1/2x5/8 - 4 kg , MS Washer - 4 Kg
including labour and transport Charges For Loading Unloading ,eraction of new materials at new loaction as directed by the departmental officers . | 1 | JOB | - | - |
| 2 | Shifting of DT Structure including Supply Delivery ,shifting and erection of existing pole With Following Materials
9 Mtr PSC pole - 2 nos , Base plate - 2 nos , Tr.Str.Mat.complete set - 1 no , Tr.Str.Clamp - 1 no , Stay set - 4 nos ,. Stay plate - 4 nos , Stay wire - 20 kg , Stay clamp 9 mt - 4 pair , GI Thimbles - 8 nos ,
Stay Shackle HT - 8 nos , Earth pipe - 3 nos , GI wire - 50 kg , Bolt & nut 2 1/2x5/8 - 3 kg , Bolt & nut 3 1/2 x 5/8 - 3 kg , Bolt & nut 4 1/2 x 5/8 - 3 kg , Bolt & nut 6 x 5/8 - 3 kg , Bold & nut 12 x 5/8 - 3 kg , MS Washer - 3 kg , Structure concreting - 1 Loc , 22 KV AB Switch Complete set - 1 Set , 22 KV HG Fuse - 1 set , 22 KV polymer insulator - 6 nos , 22 KV LAS - 3 nos , LT open type fuse unit - 2 nos , LT LAS - 3 nos
including labour and transport Charges For Loading Unloading ,eraction of new materials at new loaction as directed by the departmental officers . | 1 | JOB | - | - |
| 3 | Shifting of DP Structure including Supply Delivery ,shifting and erection of existing pole With Following Materials
9 Mtr PSC pole - 2 nos , Base plate - 2 nos , Double Channel cross Arm - 1 no , Cross Bracing Set - 1 no ,
Stay set - 4 nos , Stay plate - 4 nos , Stay wire - 20 kg , Stay clamp 9 mt - 6 pair , GI Thimbles - 8 nos , Stay Shackle HT - 8 nos , Earth pipe - 2 nos , GI wire - 40 kg , Bolt & nut 2 1/2x5/8 - 5 kg , Bolt & nut 3 1/2 x 5/8 - 5 kg , Bolt & nut 4 1/2 x 5/8 - 5 kg , Bolt & nut 6 x 5/8 - 5 kg , Bold & nut 12 x 5/8 - 5 kg , MS Washer - 5 kg , Structure concreting - 1 Loc , 22 KV AB Switch Complete set - 1 Set , Tapping Channel - 2 nos , Guarding Cross arm - 2 nos , Back Clamp 9 Mt - 2 nos , 22KV LAS - 3 nos
including labour and transport Charges For Loading Unloading ,eraction of new materials at new loaction as directed by the departmental officers . | 1 | JOB | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.06 MB
BOQ_843609.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .