| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹7.7 LAdmitted-Finance | -0.30% | ₹7.7 L | L1 | Admitted-Finance |
| 2 | L2₹7.8 L+₹10,018.09 (1.30%)Admitted-Finance | +1.00% | ₹7.8 L+₹10,018.09 (1.30%) | L2 | Admitted-Finance |
| 3 | L3₹7.8 L+₹13,871.20 (1.81%)Admitted-Finance | +1.50% | ₹7.8 L+₹13,871.20 (1.81%) | L3 | Admitted-Finance |
Tender Value
₹7.7 L
EMD Value
₹15,450
Closing Date
15 Jun 2026, 2:00 pmClosed
DG (WATER SUPPLY)
OFFICE OF THE DIRECTOR GENERAL (WATER SUPPLY) 5, S. N. Banerjee Road, Kolkata-700013
Installation of 1600 mm dia MS blank on SS line inside Nature Park along with construction of masonry chamber with other ancillary work.
2026_KMC_1024689_1
KMC/WS/GRWW/T-01/2026-27
Open Tender
MECHANICAL
Percentage
7 days
INSIDE NATURE PARK.
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹15,450
8 Sept 2026
19 May 2026
17 Jun 2026
19 May 2026
15 Jun 2026
19 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches levelling, dressing and
ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm | 1 | CUBIC METER PERCENT | 119.27 | ₹119.26 |
| 2 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches levelling, dressing and ramming the bottom, bailing out water as required complete (b) Depth of excavation for additional depth beyond 1,500 mm. and upto 3,000 mm. but not requiring shoring | - | CUBIC METER PERCENT | 192.38 | - |
| 3 | Hire and labour charges for shoring work (including necessary close plank walling, framing, Eucalyptus/Jhou bulla piling, strutting etc) complete as
per direction of the Engineer-in charge for foundation excavation (vertical surface are in contact with supported earth is to be measured.) (This item should be executed on specific direction of the Enginner in charge).(a) Depth upto 1.5 m. | - | SQUARE METER | 386 | - |
| 4 | Hire and labour charges for shoring work (including necessary close plank walling, framing, Eucalyptus/Jhou bulla piling, strutting etc) complete as
per direction of the Engineer-in charge for foundation excavation (vertical surface are in contact with supported earth is to be measured.) (This item should be executed on specific direction of the Enginner in charge)(b) For additional depth beyond 1.5 m. and upto 3.00 m | - | SQUARE METER | 439 | - |
| 5 | Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity) | - | CUBIC METER PERCENT | 936.21 | - |
| 6 | Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. | - | SQUARE METER | 358 | - |
| 7 | Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement, if any, in ground floor as per relevant IS codes. a) Pakur Variety | - | CUBIC METER | 3,886 | - |
| 8 | Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor).(When the height of a particular floor is more than 4 m the equivalent floor height shall be taken as 4 m and extra for works
beyond the initial 4 m ht. shall be allowed under 12 (e) for every 4 m or part thereof).(a) 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-In-Charge.Notes:- For shuttering in shell roof, grid roof with vertical faces folded plate, arched roof the rate in 36 (a), 36 (b) & 37 (c) of subhead B above to be increased by 100%. For grid roof with splayed faces, rate is to be increased by 150%. | 1.8 | SQUARE METER | 335 | ₹603 |
| 9 | Dismantling all types of masonry excepting cement concrete plain or reinforced, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m. (a) In ground floo including roof. | 1 | CUBIC METER | 447 | ₹447 |
| 10 | Brick work with 1st class bricks in cement mortar (1:4) (a In foundation and plinth | 0.2 | CUBIC METER | 5,575 | ₹1,114.94 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.93 MB
TECH.pdf
Tender Documents • 1.44 MB
OID.pdf
Additional Documents • 0.63 MB
BOQ_2518250.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .