| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹28.4 CrAccepted-AOC | ₹28.4 Cr | L1 | Accepted-AOC Responsive |
| 2 | L2₹28.5 CrRejected-Finance | ₹28.5 Cr | L2 | Rejected-Finance Responsive |
| Sl No | Description | Qty | Unit | Jeet Construction L2 | OMPRAKASH SINGH L1 |
|---|---|---|---|---|---|
| 1.00 | Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m. Including cost of material, labour, T&P, Labour cess, all taxes but excluding GST. | 22,500 | cum | 51 ₹11.5 L | 49 ₹11.0 L |
| 2.00 | Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2. Including cost of material, labour, T&P, Labour cess, all taxes but excluding GST. | 22,500 | cum | 70 ₹15.8 L | 68 ₹15.3 L |
| 3.00 | Construction of embankment with approved material obtained from right of way with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. Including cost of material, labour, T&P, Labour cess, all taxes but excluding GST. | 33,700 | cum | 110 ₹37.1 L | 108 ₹36.4 L |
| 4.00 | Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. Including cost of material, labour, T&P, Labour cess, all taxes but excluding GST. | 32,000 | cum | 181 ₹57.9 L | 179 ₹57.3 L |
| 5.00 | Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per Morth Specification clause 401 (4.1A). Including cost of material, labour, T&P, Labour cess, Royalty, all taxes but excluding GST. | 8,820 | cum | 2,580 ₹2.3 Cr | 2,580 ₹2.3 Cr |
| 6.00 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with grader in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density as per Morth Specification clause 406 (4.14B). Including cost of material, labour, T&P, Labour cess, Royalty, all taxes but excluding GST. | 6,270 | cum | 2,670 ₹1.7 Cr | 2,674 ₹1.7 Cr |
| 7.00 | Providing and applying primer coat with SS1grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.60 kg/sqm using mechanical means. Including cost of material, labour, T&P, Labour cess, Royalty, all taxes but excluding GST. | 16,000 | Sqm | 28 ₹4.5 L | 24 ₹3.8 L |
| 8.00 | Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder VG-30 @ 4.0 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. G-I. Including cost of material, labour, T&P, Labour cess, Royalty, all taxes but excluding GST. | 1,680 | Cum | 8,600 ₹1.4 Cr | 8,609 ₹1.4 Cr |
| 9.00 | Providing and applying tack coat with bitumen using Bitumen pressure distributor at the rate of 0.20kg per sqm on the prepared bituminous surface cleaned with mechanical broom as per Morth Speciification 503 For BC. Including cost of material, labour, T&P, Labour cess, Royalty, all taxes but excluding GST. | 3,03,000 | Sqm | 9.5 ₹28.8 L | 10 ₹30.3 L |
| 10.00 | Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. G-II. Including cost of material, labour, T&P, Labour cess, Royalty, all taxes but excluding GST. | 4,535 | Cum | 8,950 ₹4.1 Cr | 8,940 ₹4.1 Cr |
Tender Value
₹28.5 Cr
EMD Value
₹43 L
Closing Date
15 Dec 2025, 3:00 pmClosed
SE Rampur Circle pwd rampur
Offive of SE Rampur Circle pwd rampur
Strengthening of Nagina Raipur Kotkadar Lalwala Kotdwar (O.D.R) from chainage 0.000 to 21.450 in 7.00 mtr and widening and strengthening of road from chainage 21.450 to 32.050 into 5.50 mtr to 7.00 mtr in District Bijnor. (Total length 32.050 Km) (in
2025_CEMBD_1097937_1
6040/E-Nivida-R.Circle/25-26 Dt. 06.10.2025
Open Tender
Civil Works - Roads
Najibabad
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹43 L
Offive of SE Rampur Circle pwd rampur
8 Jan 2026
10 Dec 2025
15 Dec 2025
10 Dec 2025
15 Dec 2025
10 Dec 2025
11 Dec 2025
Amount
Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m. Including cost of material, labour, T&P, Labour cess, all taxes but excluding GST.
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2. Including cost of material, labour, T&P, Labour cess, all taxes but excluding GST.
Construction of embankment with approved material obtained from right of way with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. Including cost of material, labour, T&P, Labour cess, all taxes but excluding GST.
Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. Including cost of material, labour, T&P, Labour cess, all taxes but excluding GST.
Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per Morth Specification clause 401 (4.1A). Including cost of material, labour, T&P, Labour cess, Royalty, all taxes but excluding GST.
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with grader in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density as per Morth Specification clause 406 (4.14B). Including cost of material, labour, T&P, Labour cess, Royalty, all taxes but excluding GST.
Providing and applying primer coat with SS1grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.60 kg/sqm using mechanical means. Including cost of material, labour, T&P, Labour cess, Royalty, all taxes but excluding GST.
Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder VG-30 @ 4.0 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. G-I. Including cost of material, labour, T&P, Labour cess, Royalty, all taxes but excluding GST.
Providing and applying tack coat with bitumen using Bitumen pressure distributor at the rate of 0.20kg per sqm on the prepared bituminous surface cleaned with mechanical broom as per Morth Speciification 503 For BC. Including cost of material, labour, T&P, Labour cess, Royalty, all taxes but excluding GST.
Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. G-II. Including cost of material, labour, T&P, Labour cess, Royalty, all taxes but excluding GST.
Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder VG-30 @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects. Including cost of material, labour, T&P, Labour cess, Royalty, all taxes but excluding GST.
Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2. Including cost of material, labour, T&P, Labour cess, all taxes but excluding GST.
Dismantling Brick / Tile work/ rubble masonary/ pitching/ etc by mechanical means. Including cost of material, labour, T&P, Labour cess, Royalty, all taxes but excluding GST.
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Including cost of material, labour, T&P, Labour cess, all taxes but excluding GST.
Providing and laying stone boulders of 25 to 60 kg weight, from approved Haridwar quarry including cost of all materials, labour and T&P etc. required for proper completion of work. Including cost of material, labour, T&P, Labour cess, Royalty, all taxes but excluding GST.
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. Including cost of material, labour, T&P, Labour cess, Royalty, all taxes but excluding GST.
RCC Grade M25 using batching plant transit mixer & manual placing. As per MoRTH Specification Clause 1500, 1700 & 2100. Including cost of material, labour, T&P, Labour cess, Royalty, all taxes but excluding GST.
HYSD steel in plain work such as R.C.C. work including binding for proper shape and including supply of steel and its wastage, bend hooks and authorised overlapping shall be measured. Including cost of material, labour, T&P, Labour cess, Royalty, all taxes but excluding GST.
RCC Grade M20 using batching plant transit mixer & manual placing. As per MoRTH Specification Clause 1500, 1700 & 2100. Including cost of material, labour, T&P, Labour cess, Royalty, all taxes but excluding GST.
Providing and laying of boulder apron laid in wire crates made with 4mm dia GI wire conforming to IS: 280 & IS:4826 in 150mm x 150mm mesh (weaved diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 40 kg each. Including cost of material, labour, T&P, Labour cess, Royalty, all taxes but excluding GST.
Providing and laying Filter material underneath pitching in slopes complete as per drawing and Technical specification. Including cost of material, labour, T&P, Labour cess, Royalty, all taxes but excluding GST.
Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications. Including cost of material, labour, T&P, Labour cess, Royalty, all taxes but excluding GST.
Brick Masonry Work in Cement Mortar 1:3 in Foundation complete excluding Pointing and Plastering, as per Drawing and Technical Specifications. Including cost of material, labour, T&P, Labour cess, Royalty, all taxes but excluding GST.
Plastering with cement mortar (1:3 ) on brick work in sub-structure as per Technical Specifications. Including cost of material, labour, T&P, Labour cess, Royalty, all taxes but excluding GST.
Pointing with cement mortar (1:3 ) on brick work in substructure as per Technical Specifications. Including cost of material, labour, T&P, Labour cess, Royalty, all taxes but excluding GST.
Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. (PCC-15). Including cost of material, labour, T&P, Labour cess, Royalty, all taxes but excluding GST.
Laying Reinforced cement concrete pipe NP3/prestressed concrete pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets . 600 mm dia. Including cost of material, labour, T&P, Labour cess, Royalty, all taxes but excluding GST.
Laying Reinforced cement concrete pipe NP3/prestressed concrete pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets . 900 mm dia. Including cost of material, labour, T&P, Labour cess, Royalty, all taxes but excluding GST.
Laying Reinforced cement concrete pipe NP3/prestressed concrete pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets . 1000 mm dia. Including cost of material, labour, T&P, Labour cess, Royalty, all taxes but excluding GST.
Routine Maintenance of road after completion work (A) Carriageway/Pavement: (a) Potholes,cracks,other surface defects (SWMM & BC), (b) Repair of Edges, Rutting (BC). (B) Road, Embankment, Cuttings, Shoulders, Trees & Plantation: (a) Roads Maintained free of edge drop, inadequate cross fall, undulations, settlement, Ponding (E/W), (b) Deficient slopes, rain cuts in embankments (E/W), (c) Vegetation growth, Loping of tree branches. (C) Bridges and Culverts: (a) De-silting, (b) Clearing vegetation growth (Jungle Clearance), (c) Damaged/disturbed boulder pitching, breast /toe wall retaining wall, apron flooring , guide bunds (Boulder Apron), (d) Parapet, any damage to foundations, (e) Any defects in sub-structures, (f) Any defects in superstructures, raillings, parapets., (g) wearing coat, (h) Approach slab, (i) Painting & lettering of No. plates, repairs. (D) Repair of Roadside Drains: (a) Brick Work in 1:4, (b) Plaster, (c) CC-1:2:4. (E) Road Furniture: (a) Cleaning, Painting & lettering of stones & sign boards, Replacement of damaged/ missing stones & sign boards., (b) 200 m stones, (c) Km stones, (d) 5th km stones,. Maintenance requirement as per above and Mentioned in Special Conditions of Contract for Maintenance. Payment of Maintenance work as Percentage of final Civil Construction Cost. For Ist Year @ 0.00 %
For Ist Year @ 0.00 %
For IInd Year @ 0.25 %
For IIIrd Year @ 0.50 %
For IVth Year @ 0.75 %
For Vth Year @ 1.00 %
Jeet Construction (BID ID -5741849)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 8.40 MB
SBD.pdf
Tender Documents • 1.19 MB
BOQ_2021915.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid