Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹67.7 LAccepted-AOC R O 115 SECTOR 24 PHASE III INDUSTRIAL ESTATE BARHI GANNAUR SONIPAT HARYANA | L-1 | Accepted-AOC L-1 | |
| 2 | L-2₹81.4 L+₹13.7 L (20.2%)Rejected-Finance | L-2 | Rejected-Finance Not Found L-1 | |
| 3 | L-3₹87.5 L+₹19.8 L (29.2%)Rejected-Finance | L-3 | Rejected-Finance Not Found L-1 |
Tender Value
₹1.1 Cr
EMD Value
₹1.4 L
Closing Date
12 May 2022, 5:00 pmClosed
Executive Engineer Jal Shakti Divn No.1 Una HP
Executive Engineer Jal Shakti Divn No.1 Una HP
Providing Sewerage Scheme to Una Town in Distt. Una (SH Operation and maintenance of Sewerage Treatment Plant distribution network and plant laboratory for 3 years.)
2022_HPIPH_60405_1
No. JSV-1/E -tender/ 22-2590-2625 dt 06-05-2022
Open Tender
Civil Works
Item Rate
1095 days
Una Town
as per NIT
8 documents required · 8 mandatory
₹1,500
Yes
Executive Engineer Jal Shakti Divn No.1 Una HP
₹1.4 L
7 Jul 2022
7 May 2022
13 May 2022
7 May 2022
12 May 2022
7 May 2022
7 May 2022 - 12 May 2022
Amount
To operate, repair & maintain all civil work s and electro- mechanical equipments relating to sewerage system to Una town which consists sewerage plants of capacity 2.53 MLD for Zone A & B 0.65 MLD for Zone-D & septic tank for Zone-C, total sewer net work 31.03 KM and Sewage Laboratory for the period of 3 years in all respect to the entire satisfaction of Engineer-in-Charge. Firm should do comply the stringent effluent standards laid down by HP Pollution Control Board.
Scope of Work :-
Operation Repair and maintenance of civil works shall cover following
Sewerage treatment plants of capacity 2.53 MLD for Zone A & B at Rampur.
Sewerage treatment plant of 0.65 MLD cap for Zone-D at Chanderlok colony .
Septic tank for Zone-C for 1140 Users
Total sewer net work of Sewerage Scheme = 31.03 KM
sewage Laboratory
Operation Repair and maintenance of electrical and mechanical equipment works of Treatment plant of 2.53 MLD shall cover following :
Sewerage treatment plant of capacity 2.53 MLD for Zone A & B at Rampur
In wet well-Submersible pump sets = 5 Nos. x 10 HP =50 HP
For Aeration Tank:-Centrifugal pump sets =2 Nos. x 30 HP =60 HP
In Pump house filter press-Centrifugal pump sets. = 2 Nos. x 15 HP =30 HP
In Pump house for Recycling -Centrifugal pump sets. = 2 Nos. x 7.50 HP =15 HP
For Sludge thickener-Centrifugal pump set. = 1 No. x 1.50 HP =1.50 HP & 2Nos. x 10 HP =20 HP
Filtration pump set. = 1 No. x 1.50 HP =1.5 HP
Secondary clarifilter pump set = 1 Nos. x 2.00 HP = 2.00 HP
Submersible pump set for Hand Pump. = 1 Nos. x 2.00 HP = 2.00 HP
Operation Repair and maintenance of electrical and mechanical equipment works of Treatment plant of 0.65 MLD shall cover following :
For Aeration Tank:-Centrifugal pump sets 1 No. x 15 HP = =15 HP
In Pump house for Lifting:-Centrifugal pump sets. = 1 Nos. x 5 HP =5.00 HP
In Pump house for Recycling-Centrifugal pump sets. = 2 Nos. x 2.00 = 4.00 HP
Submersible pump set for Hand Pump. 1 Nos. x 2.00 HP = 2.00 HP
Operation of Sewage Laboratory for sewage test should do comply the stringent effluent standards laid down by HP Pollution Control Board and terms and conditions shall be covered
Operation, Repair and maintenance of total sewer net work =31.03 KM and also made the newly connection with main sewage network.
Operation Complaint room with telephone, Internet etc.
Providing Chemical and other regents to be used for testing in Sewage Laboratory.
Providing Bleaching powder to be used for chlorination.
Clearance of sludge from septic tank for Zone C and disposal to dump at nearest site at least twice in a year.
Maintenance Squade for Sewer net work of Zone A,B,C & D =31.03 Km , Labour for Maintenance of Treatment plant for Zone-A&B (2.53 MLD), Treatment plant for Zone-D (0.65 MLD), Labour for Sewage Laboratory and for newly connection with 5% increase yearly. The Maintenance Squad for 1st year as under:-
Sweeper/Sewerman / Grass cutter = 8 Nos.
Supervisor cum Complaint attendant = 1 No.
Pump Operator = 6 Nos.
Beldar = 2 Nos.
Assistant Chemist = 1 No.
Helper =1 No.
Plumber = 1 No.
KANWAR ENTERPRISES
Chetan Chabba
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .