| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.6 LAccepted-AOC MAJAN KALA P O KACHANI DIST SINGRAULI M P 486887 | SINGRAULI | MADHYA PRADESH | 486887 | L1 | Accepted-AOC As per TCR | |
| 2 | L2₹4.3 L+₹40,100 (10.3%)Rejected-Finance BINA ROAD PARASI PO KAKRI DISTT SONEBHADRA UP PIN 231220 | KAKRI | SONEBHADRA | UP | 231220 | L2 | Rejected-Finance As per TCR | |
| 3 | L3₹4.5 L+₹57,586 (14.7%)Rejected-Finance COALGATE RENUSAGAR PARASI P O RENUSAGAR DISTT SONEBHADRA U P 231218 | RENUSAGAR | SONEBHADRA | UTTAR PRADESH | 231218 | L3 | Rejected-Finance As per TCR |
Tender Value
₹6.0 L
EMD Value
₹7,600
Closing Date
22 Feb 2025, 9:00 amClosed
Staff Officer (EM), Bina
Office of Area General Manager Bina Project NCL U.P. 231220
Installation, shifting , commissioning and dismantling of pontoons, pump-motor sets and other associated electrical equipment at various locations in mines before, during and after monsoon 2025 at Bina Project.
2025_NCL_328303_1
B/EM/eTender/2024-25/79 dt. 07.02.2025
Open Tender
Electrical and Maintenance Works
Item Rate
120 days
Bina Project
3 documents required · 3 mandatory
₹7,600
24 Mar 2025
10 Feb 2025
24 Feb 2025
10 Feb 2025
22 Feb 2025
11 Feb 2025
10 Feb 2025 - 17 Feb 2025
Amount
Transportation, installation & commissioning of 7 Nos. pontoons, 6.88 Ton Weight each of blocks in Turra main sump , Turra North Sump & Purewa bottom sump before and during monsoon including as per instruction of Engineer In Charge. (Note -Required Nut bolt and welding electrodes will be arranged by Contractor, MS steel material & gases will be provided by Bina Project, NCL )
Dismantling, transportation, stacking of 7 Nos. pontoons 6.88 Ton weight of 9 blocks in Turra main sump, Turra north sump & Purewa botton sump after monsoon 2025 as per instruction of Engineer In charge.(Note -Required Nut bolt and welding electrodes will be arranged by Contractor, MS steel material & gases will be provided by Bina Project, NCL )
Installation of pump motor set/ alignment of motor, field switch, starter as per requirement including fixing of suction pipe, moving unit, priming, testing etc with Loading and unloading of pump motor set and its accessories for installation before, during and after monsoon 2025 as per instruction of Engineer Incharge. (Note - Required welding electrode will be arranged by contractor & Gases will be provided by Bina Project, If required)
Dismantling of pump motor set & other associated electrical equipments such as switch, starter etc as per requirement including suction pipe, moving unit, etc with Loading and unloading of pump motor set, starter, field switch and its accessories for placing at safe place during and after monsoon 2025 as per instruction of Engineer Incharge. (Gases and welding electrode will be provided by NCL, If required)
Total impact of GST for the purpose of CTC
M/s M. B. Brothers (BID ID -1130900)
M/S. SAKUR AND SANJAY ENTERPRISES (BID ID -1129469)
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .