Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
₹77.7 L
EMD Value
₹78,000
Closing Date
29 Jul 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Project Director
O/o Project Director, DRDA, Sivagangai
AGAMT II 2021-22 Rejuvenation of water bodies works at Devakottai Block in Sivagangai District - Package No. 24
2022_RDTN_242465_1
24_Pack_AGAMT II 21-22/DVK
Open Tender
Civil Works
Item Rate
90 days
Sivagangai
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹78,000
13 Aug 2022
19 Jul 2022
29 Jul 2022
19 Jul 2022
29 Jul 2022
19 Jul 2022
90 days
Amount
DEEPENING AND DESILTING, RECONSTRUCTION OF SLUICE(1 NO) OF THONGUMATHI KANMOI (SF NO : 44) IN SIRUVATHI PANCHAYAT
Desilting & Deepening of Kanmoi
Clearing Juli Flora Jungle without Uprooting, Sl no 7 Item 9D
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete Sl no:86 Item no: 1
Tank Bund and Closing Add to relevant T.N.D.S.S no.20.A, rates for new Tank bund and closing Breaches for extra watering and consolidation By power roller including Hire Charges Sl.no;71 Item no:13
Reconstruction of sluice
Earth work excavating and depositing on bank with a initial lead of 10 m & initial lift of 2 m in Hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size of boulders hard gravelly soil com
Dismantling Without damaging the near by strectures if any, clearing away and carefully stacking materials useful for reuse for any thickness of wall in Brick or stone masonry in cement mortar walls under 3m high etc., complete complying with standard spe
Dismantling Without damaging the near by strectures if any,clearing away and carefully stacking materials useful for reuse for any thickness of Plain cement concrete complete complying with standard specification and as directed by the Engineer in char
Earthwork excavation for foundation in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size of boulders hard gravelly soil inclusive of shoring to full depth strutting and bailing out w
Supplying and filling with the river sand in 15 cm thick layer including watering compacting cost and conveyance materials etc.complete complying with the standard specification and as directed by the Engineer in charge of the works For sluices ,weirs qa
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
Supplying, Laying, Jointing and fixing in position of R.C.C. Hume pipes of NP 3 class of 900 mm. Dia with suitable collars including labour charges and jointing materials, etc., complete complying with standard specification and as directed by the departm
Providing steel centring for RCC slabs,beams or plain surfaces including strutting 3m height usingMS sheet ,BG .10 gauge thick of size 90 x60cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joists of size 10cm 6.50cm
Cement concrete 1:2:4 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
Cement concrete 1:2:4 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
Cement concrete 1:2:4 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
Refilling with excavated earth (other than sand) with all leads and lifts for filling the open cut wherever necessary in layers including breaking clods watering and compaction using Power Roller to atleast 95% of Proctor Density at OMC in each layer and
DESILTING AND DEEPENING ,CONSTRUCTION OF BATHIGGHAT @ KELASEMPONMARI ADAIKALAM VINAYAKAR OORANI (SF NO : 24) IN KANDADEVI PANCHAYAT
Desilting & Deepening of Oorani
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed.
Construction of Bathigghat
Earth work Excavation in all classes of soils such as hard stiff clay. Stiff block hard red earth, shales, murram, gravel, stoney earth expect hard rock requiring blassing and depositing on bank with all leads and lifts and all incidental charges such as per SS 20B etc
Filling with clear river sand in foundation including cost & conveyance to site and labour charges for watering raming and all other incidental charges etc., complete.
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site including cost of cement which will be supplied departmentally from section store at the cost three of which will be recovered for the contractors
Cement Concrete 1:3:6 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site including labour for mixing laying compacting curing concrete and all other incidental charges etc., complete for foundation.
Supplying and erecting of centering of RCC items including cost & conveyance of all materials to site and all labour charges etc., complete. SIDE
Construction of Inlet
Earth work Excavation in all classes of soils such as hard stiff clay. Stiff block hard red earth, shales, murram, gravel, stoney earth expect hard rock requiring blassing and depositing on bank with all leads and lifts and all incidental charges such as per SS 20B etc
Filling with clear river sand in foundation including cost & conveyance to site and labour charges for watering raming and all other incidental charges etc., complete.
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site including cost of cement which will be supplied departmentally from section store at the cost three of which will be recovered for the contractors
Cement Concrete 1:3:6 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site including labour for mixing laying compacting curing concrete and all other incidental charges etc., complete for foundation.
Supplying and erecting of centering of RCC items including cost & conveyance of all materials to site and all labour charges etc., complete. SIDE
Desilting &Deepening ,Construction of Bathigghat , Retaining wall @ Kandadevi Arasamarathu oorani (SF Noi : 264/4) in Kandadevi Panchayat
Desilting & Deepening of Oorani
Clearing light jungles and clearing away carefully and burning it including all labour charges etc.
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed.
Construction of Bathigghat
Earth work Excavation in all classes of soils such as hard stiff clay. Stiff block hard red earth, shales, murram, gravel, stoney earth expect hard rock requiring blassing and depositing on bank with all leads and lifts and all incidental charges such as per SS 20B etc
Filling with clear river sand in foundation including cost & conveyance to site and labour charges for watering raming and all other incidental charges etc., complete.
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site including cost of cement which will be supplied departmentally from section store at the cost three of which will be recovered for the contractors
Cement Concrete 1:3:6 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site including labour for mixing laying compacting curing concrete and all other incidental charges etc., complete for foundation.
Supplying and erecting of centering of RCC items including cost & conveyance of all materials to site and all labour charges etc., complete. SIDE
Construction of Inlet
Earth work Excavation in all classes of soils such as hard stiff clay. Stiff block hard red earth, shales, murram, gravel, stoney earth expect hard rock requiring blassing and depositing on bank with all leads and lifts and all incidental charges such as per SS 20B etc
Filling with clear river sand in foundation including cost & conveyance to site and labour charges for watering raming and all other incidental charges etc., complete.
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site including cost of cement which will be supplied departmentally from section store at the cost three of which will be recovered for the contractors
Supplying and erecting of centering of RCC items including cost & conveyance of all materials to site and all labour charges etc., complete. SIDE
Cement Concrete 1:3:6 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site including labour for mixing laying compacting curing concrete and all other incidental charges etc., complete for foundation.
Construction of Retaining wall
Earth work Excavation in all classes of soils such as hard stiff clay. Stiff block hard red earth, shales, murram, gravel, stoney earth expect hard rock requiring blassing and depositing on bank with all leads and lifts and all incidental charges such as per SS 20B etc
Filling with clear river sand in foundation including cost & conveyance to site and labour charges for watering raming and all other incidental charges etc., complete.
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site including cost of cement which will be supplied departmentally from section store at the cost three of which will be recovered for the contractors
Cement Concrete 1:3:6 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site including labour for mixing laying compacting curing concrete and all other incidental charges etc., complete for foundation.
Supplying and erecting of centering of RCC items including cost & conveyance of all materials to site and all labour charges etc., complete. SIDE
DESILTING AND DEEPENING ,CONSTRUCTION OF BATHIGGHAT @KARKALATHUR CHINNADI THAMMAM OORANI (SF NO : 232/1) IN KARKALATHUR PANCHAYAT
Desilting & Deepening of Oorani
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed.
Construction of Bathigghat
Earth work Excavation in all classes of soils such as hard stiff clay. Stiff block hard red earth, shales, murram, gravel, stoney earth expect hard rock requiring blassing and depositing on bank with all leads and lifts and all incidental charges such as per SS 20B etc
Filling with clear river sand in foundation including cost & conveyance to site and labour charges for watering raming and all other incidental charges etc., complete.
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site including cost of cement which will be supplied departmentally from section store at the cost three of which will be recovered for the contractors
Cement Concrete 1:3:6 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site including labour for mixing laying compacting curing concrete and all other incidental charges etc., complete for foundation.
Supplying and erecting of centering of RCC items including cost & conveyance of all materials to site and all labour charges etc., complete. SIDE
Desilting & Deepening ,Construction of Bathingghat @ Keelautchani AD colony oorani (SF No :112) in Keelautchani Panchayat
Desilting & Deepening of Oorani
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed.
Construction of Bathigghat
Earth work Excavation in all classes of soils such as hard stiff clay. Stiff block hard red earth, shales, murram, gravel, stoney earth expect hard rock requiring blassing and depositing on bank with all leads and lifts and all incidental charges such as per SS 20B etc
Filling with clear river sand in foundation including cost & conveyance to site and labour charges for watering raming and all other incidental charges etc., complete.
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site including cost of cement which will be supplied departmentally from section store at the cost three of which will be recovered for the contractors
Cement Concrete 1:3:6 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site including labour for mixing laying compacting curing concrete and all other incidental charges etc., complete for foundation.
Supplying and erecting of centering of RCC items including cost & conveyance of all materials to site and all labour charges etc., complete. SIDE
Construction of Inlet
Earth work Excavation in all classes of soils such as hard stiff clay. Stiff block hard red earth, shales, murram, gravel, stoney earth expect hard rock requiring blassing and depositing on bank with all leads and lifts and all incidental charges such as per SS 20B etc
Filling with clear river sand in foundation including cost & conveyance to site and labour charges for watering raming and all other incidental charges etc., complete.
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site including cost of cement which will be supplied departmentally from section store at the cost three of which will be recovered for the contractors
Cement Concrete 1:3:6 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site including labour for mixing laying compacting curing concrete and all other incidental charges etc., complete for foundation.
Supplying and erecting of centering of RCC items including cost & conveyance of all materials to site and all labour charges etc., complete. SIDE
Desilting & Deepening ,Construction of Bathingghat @ T.Alangudi oorani (SF No :248/8 ) @ T.Alangudi in Keelautchani Panchayat
Desilting & Deepening of Oorani
Clearing light jungles and clearing away carefully and burning it including all labour charges etc.
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed.
Construction of Bathigghat
Earth work Excavation in all classes of soils such as hard stiff clay. Stiff block hard red earth, shales, murram, gravel, stoney earth expect hard rock requiring blassing and depositing on bank with all leads and lifts and all incidental charges such as per SS 20B etc
Filling with clear river sand in foundation including cost & conveyance to site and labour charges for watering raming and all other incidental charges etc., complete.
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site including cost of cement which will be supplied departmentally from section store at the cost three of which will be recovered for the contractors
Cement Concrete 1:3:6 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site including labour for mixing laying compacting curing concrete and all other incidental charges etc., complete for foundation.
Supplying and erecting of centering of RCC items including cost & conveyance of all materials to site and all labour charges etc., complete. SIDE
Construction of Inlet
Earth work Excavation in all classes of soils such as hard stiff clay. Stiff block hard red earth, shales, murram, gravel, stoney earth expect hard rock requiring blassing and depositing on bank with all leads and lifts and all incidental charges such as per SS 20B etc
Filling with clear river sand in foundation including cost & conveyance to site and labour charges for watering raming and all other incidental charges etc., complete.
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site including cost of cement which will be supplied departmentally from section store at the cost three of which will be recovered for the contractors
Supplying and erecting of centering of RCC items including cost & conveyance of all materials to site and all labour charges etc., complete. SIDE
Cement Concrete 1:3:6 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site including labour for mixing laying compacting curing concrete and all other incidental charges etc., complete for foundation.
Desilting & Deepening , Construction of Retaining Wall @ Kampany Periya oorani (SF No : 269) in Kurunthanakottai Panchayat
Desilting & Deepening of Oorani
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed.
Construction of Retaining wall
Earth work Excavation in all classes of soils such as hard stiff clay. Stiff block hard red earth, shales, murram, gravel, stoney earth expect hard rock requiring blassing and depositing on bank with all leads and lifts and all incidental charges such as per SS 20B etc
Filling with clear river sand in foundation including cost & conveyance to site and labour charges for watering raming and all other incidental charges etc., complete.
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site including cost of cement which will be supplied departmentally from section store at the cost three of which will be recovered for the contractors
Cement Concrete 1:3:6 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site including labour for mixing laying compacting curing concrete and all other incidental charges etc., complete for foundation.
Supplying and erecting of centering of RCC items including cost & conveyance of all materials to site and all labour charges etc., complete. SIDE
Deepening &Desilting ,Construction of Bathingghat @ Pillaimadathu oorani (SF No : 233) in Nagadi Panchayat
Desilting & Deepening of Oorani
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed.
Construction of Bathigghat
Earth work Excavation in all classes of soils such as hard stiff clay. Stiff block hard red earth, shales, murram, gravel, stoney earth expect hard rock requiring blassing and depositing on bank with all leads and lifts and all incidental charges such as per SS 20B etc
Filling with clear river sand in foundation including cost & conveyance to site and labour charges for watering raming and all other incidental charges etc., complete.
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site including cost of cement which will be supplied departmentally from section store at the cost three of which will be recovered for the contractors
Cement Concrete 1:3:6 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site including labour for mixing laying compacting curing concrete and all other incidental charges etc., complete for foundation.
Supplying and erecting of centering of RCC items including cost & conveyance of all materials to site and all labour charges etc., complete. SIDE
Construction of Inlet
Earth work Excavation in all classes of soils such as hard stiff clay. Stiff block hard red earth, shales, murram, gravel, stoney earth expect hard rock requiring blassing and depositing on bank with all leads and lifts and all incidental charges such as per SS 20B etc
Filling with clear river sand in foundation including cost & conveyance to site and labour charges for watering raming and all other incidental charges etc., complete.
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site including cost of cement which will be supplied departmentally from section store at the cost three of which will be recovered for the contractors
Supplying and erecting of centering of RCC items including cost & conveyance of all materials to site and all labour charges etc., complete. SIDE
Cement Concrete 1:3:6 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site including labour for mixing laying compacting curing concrete and all other incidental charges etc., complete for foundation.
Deepening &Desilting ,Construction of Bathingghat @ Pudukudi oorani (SF No : 209) in Nagadi Panchayat
Desilting & Deepening of Oorani
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed.
Construction of Bathigghat
Earth work Excavation in all classes of soils such as hard stiff clay. Stiff block hard red earth, shales, murram, gravel, stoney earth expect hard rock requiring blassing and depositing on bank with all leads and lifts and all incidental charges such as per SS 20B etc
Filling with clear river sand in foundation including cost & conveyance to site and labour charges for watering raming and all other incidental charges etc., complete.
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site including cost of cement which will be supplied departmentally from section store at the cost three of which will be recovered for the contractors
Cement Concrete 1:3:6 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site including labour for mixing laying compacting curing concrete and all other incidental charges etc., complete for foundation.
Supplying and erecting of centering of RCC items including cost & conveyance of all materials to site and all labour charges etc., complete. SIDE
Construction of Inlet
Earth work Excavation in all classes of soils such as hard stiff clay. Stiff block hard red earth, shales, murram, gravel, stoney earth expect hard rock requiring blassing and depositing on bank with all leads and lifts and all incidental charges such as per SS 20B etc
Filling with clear river sand in foundation including cost & conveyance to site and labour charges for watering raming and all other incidental charges etc., complete.
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site including cost of cement which will be supplied departmentally from section store at the cost three of which will be recovered for the contractors
Supplying and erecting of centering of RCC items including cost & conveyance of all materials to site and all labour charges etc., complete. SIDE
Cement Concrete 1:3:6 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site including labour for mixing laying compacting curing concrete and all other incidental charges etc., complete for foundation.
Deepening &Desilting , Construction of Bathigghat & Retaining wall @ Oorasur Ilanthai oorani (SF No :50 ) @ Oorasur in Thiruvegampathur Panchayat
Desilting & Deepening of Oorani
Clearing light jungles and clearing away carefully and burning it including all labour charges etc.
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed.
Construction of Bathigghat
Earth work Excavation in all classes of soils such as hard stiff clay. Stiff block hard red earth, shales, murram, gravel, stoney earth expect hard rock requiring blassing and depositing on bank with all leads and lifts and all incidental charges such as per SS 20B etc
Filling with clear river sand in foundation including cost & conveyance to site and labour charges for watering raming and all other incidental charges etc., complete.
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site including cost of cement which will be supplied departmentally from section store at the cost three of which will be recovered for the contractors
Cement Concrete 1:3:6 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site including labour for mixing laying compacting curing concrete and all other incidental charges etc., complete for foundation.
Supplying and erecting of centering of RCC items including cost & conveyance of all materials to site and all labour charges etc., complete. SIDE
Construction of Inlet
Earth work Excavation in all classes of soils such as hard stiff clay. Stiff block hard red earth, shales, murram, gravel, stoney earth expect hard rock requiring blassing and depositing on bank with all leads and lifts and all incidental charges such as per SS 20B etc
Filling with clear river sand in foundation including cost & conveyance to site and labour charges for watering raming and all other incidental charges etc., complete.
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site including cost of cement which will be supplied departmentally from section store at the cost three of which will be recovered for the contractors
Supplying and erecting of centering of RCC items including cost & conveyance of all materials to site and all labour charges etc., complete. SIDE
Cement Concrete 1:3:6 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site including labour for mixing laying compacting curing concrete and all other incidental charges etc., complete for foundation.
Construction of Retaining wall
Earth work Excavation in all classes of soils such as hard stiff clay. Stiff block hard red earth, shales, murram, gravel, stoney earth expect hard rock requiring blassing and depositing on bank with all leads and lifts and all incidental charges such as per SS 20B etc
Filling with clear river sand in foundation including cost & conveyance to site and labour charges for watering raming and all other incidental charges etc., complete.
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site including cost of cement which will be supplied departmentally from section store at the cost three of which will be recovered for the contractors
Cement Concrete 1:3:6 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site including labour for mixing laying compacting curing concrete and all other incidental charges etc., complete for foundation.
Supplying and erecting of centering of RCC items including cost & conveyance of all materials to site and all labour charges etc., complete. SIDE
Desilting and Deepening ,Construction of Bathingghat @ Venniyur Keelakottai oorani (SF No : 236/1) in Thiruvegampathur Panchayat
Desilting & Deepening of Oorani
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed.
Construction of Bathigghat
Earth work Excavation in all classes of soils such as hard stiff clay. Stiff block hard red earth, shales, murram, gravel, stoney earth expect hard rock requiring blassing and depositing on bank with all leads and lifts and all incidental charges such as per SS 20B etc
Filling with clear river sand in foundation including cost & conveyance to site and labour charges for watering raming and all other incidental charges etc., complete.
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site including cost of cement which will be supplied departmentally from section store at the cost three of which will be recovered for the contractors
Cement Concrete 1:3:6 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site including labour for mixing laying compacting curing concrete and all other incidental charges etc., complete for foundation.
Supplying and erecting of centering of RCC items including cost & conveyance of all materials to site and all labour charges etc., complete. SIDE
Construction of Inlet
Earth work Excavation in all classes of soils such as hard stiff clay. Stiff block hard red earth, shales, murram, gravel, stoney earth expect hard rock requiring blassing and depositing on bank with all leads and lifts and all incidental charges such as per SS 20B etc
Filling with clear river sand in foundation including cost & conveyance to site and labour charges for watering raming and all other incidental charges etc., complete.
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site including cost of cement which will be supplied departmentally from section store at the cost three of which will be recovered for the contractors
Cement Concrete 1:3:6 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site including labour for mixing laying compacting curing concrete and all other incidental charges etc., complete for foundation.
Supplying and erecting of centering of RCC items including cost & conveyance of all materials to site and all labour charges etc., complete. SIDE
Desilting &Deepening ,Construction of Retaining Wall @Vilankattur Pillayarkovil oorani (SF No : 150/1) in Thiruvegampathur Panchayat
Desilting & Deepening of Oorani
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed.
Construction of Retaining wall
Earth work Excavation in all classes of soils such as hard stiff clay. Stiff block hard red earth, shales, murram, gravel, stoney earth expect hard rock requiring blassing and depositing on bank with all leads and lifts and all incidental charges such as per SS 20B etc
Filling with clear river sand in foundation including cost & conveyance to site and labour charges for watering raming and all other incidental charges etc., complete.
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site including cost of cement which will be supplied departmentally from section store at the cost three of which will be recovered for the contractors
Cement Concrete 1:3:6 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site including labour for mixing laying compacting curing concrete and all other incidental charges etc., complete for foundation.
Supplying and erecting of centering of RCC items including cost & conveyance of all materials to site and all labour charges etc., complete. SIDE
Desilting and Deepening ,Construction of Bathingghat @ Kaikudi Pulikuthi oorani (SF No : 129/5) in Veerai Panchayat
Desilting & Deepening of Oorani
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed.
Construction of Bathigghat
Earth work Excavation in all classes of soils such as hard stiff clay. Stiff block hard red earth, shales, murram, gravel, stoney earth expect hard rock requiring blassing and depositing on bank with all leads and lifts and all incidental charges such as per SS 20B etc
Filling with clear river sand in foundation including cost & conveyance to site and labour charges for watering raming and all other incidental charges etc., complete.
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site including cost of cement which will be supplied departmentally from section store at the cost three of which will be recovered for the contractors
Cement Concrete 1:3:6 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site including labour for mixing laying compacting curing concrete and all other incidental charges etc., complete for foundation.
Supplying and erecting of centering of RCC items including cost & conveyance of all materials to site and all labour charges etc., complete. SIDE
Construction of Inlet
Earth work Excavation in all classes of soils such as hard stiff clay. Stiff block hard red earth, shales, murram, gravel, stoney earth expect hard rock requiring blassing and depositing on bank with all leads and lifts and all incidental charges such as per SS 20B etc
Filling with clear river sand in foundation including cost & conveyance to site and labour charges for watering raming and all other incidental charges etc., complete.
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site including cost of cement which will be supplied departmentally from section store at the cost three of which will be recovered for the contractors
Cement Concrete 1:3:6 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site including labour for mixing laying compacting curing concrete and all other incidental charges etc., complete for foundation.
Supplying and erecting of centering of RCC items including cost & conveyance of all materials to site and all labour charges etc., complete. SIDE
Desilting and Deepening ,Construction of Bathingghat @ Velayuthapattinam Pillayarkovil oorani (SF No :197) in Veerai Panchayat
Desilting & Deepening of Oorani
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed.
Construction of Bathigghat
Earth work Excavation in all classes of soils such as hard stiff clay. Stiff block hard red earth, shales, murram, gravel, stoney earth expect hard rock requiring blassing and depositing on bank with all leads and lifts and all incidental charges such as per SS 20B etc
Filling with clear river sand in foundation including cost & conveyance to site and labour charges for watering raming and all other incidental charges etc., complete.
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site including cost of cement which will be supplied departmentally from section store at the cost three of which will be recovered for the contractors
Cement Concrete 1:3:6 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site including labour for mixing laying compacting curing concrete and all other incidental charges etc., complete for foundation.
Supplying and erecting of centering of RCC items including cost & conveyance of all materials to site and all labour charges etc., complete. SIDE
Construction of Inlet
Earth work Excavation in all classes of soils such as hard stiff clay. Stiff block hard red earth, shales, murram, gravel, stoney earth expect hard rock requiring blassing and depositing on bank with all leads and lifts and all incidental charges such as per SS 20B etc
Filling with clear river sand in foundation including cost & conveyance to site and labour charges for watering raming and all other incidental charges etc., complete.
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site including cost of cement which will be supplied departmentally from section store at the cost three of which will be recovered for the contractors
Cement Concrete 1:3:6 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site including labour for mixing laying compacting curing concrete and all other incidental charges etc., complete for foundation.
Supplying and erecting of centering of RCC items including cost & conveyance of all materials to site and all labour charges etc., complete. SIDE
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
B.S.SUNDARI,CONTRACTOR
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .