| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.8 LAccepted-AOC | ₹4.8 L | L1 | Accepted-AOC BELOW |
| 2 | L2₹5.1 L+₹22,246.80 (4.59%)Rejected-AOC | ₹5.1 L+₹22,246.80 (4.59%) | L2 | Rejected-AOC ABOVE |
| Sl No | Description | Qty | Unit | K S SELVAM AND CO L1 | TRUST CONSTRUCTIONS L2 |
|---|---|---|---|---|---|
| 1.00 | Advance Patch work 13.20mm Providing Advancve Patch work using 50mm consolidated Thickness by using 1 m3 of 13.20mm IRC Metal with 44kg of Bittumen per 1 m3 of Metal For Pre Mixing For existing surface advance Patch work including cost and conveyance of materials to the work site and stacking them to the departmental metric guage for the premeasurement, heating the bitumen in bitumen boiler, heating the aggregates and mixing them with bitumen in mini hot mix plant for premix carpet only rolling by 60-70KN power roller for premix carpet and seal coat seperately including labour charges for spreading the mix for premix carpet application of bitumen for seal coat over premix carpet, including labour charges for spreading seal coat seperately over premix carpet etc. including higher charges and fuel charges for , bitumen boiler and all other tools and plant employed etc. complete as per of MoRTH Rev - V Specifications | 5.94 | M3 | 4,030 ₹23,938.2 Lowest | 4,050 ₹24,057 |
| 2.00 | Providing and laying tack coat of 2kgs/10 sqm over the BT surface treated with binder using 2 kgs of bituminous Emulsion (RS) for 10square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Specifications | 540 | M2 | 30 ₹16,200 Lowest | 40 ₹21,600 |
| 3.00 | Providing and laying 50mm consolidated thick Dense Bituminous Macadam using 0.24cum of 26.50- 13.20mm, 0.25cum of 13.20 -2.36mm and 0.23 cum of 2.6mm & below and with 53.20 kgs of VG30/ VG 40 bitumen for premixing per 10sqm including cost and conveyance of all meterials to CMP site , heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity , conveying the mix by tipper trucks to work site , spreading the mix to uniform thickness of 50mm with paver to the specified grades and cross sections and compacted by vibratory / pneumatic roller to the required density etc ., including labour for attending to paver ay site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler , tipper trucks , paver Finisher ,/9 m paver finisher, vibratory / pneumatic rollers and all other tools and plant reauired , including fuel and all other incidental charges etc ., complete and per specification using CMP as per clause 505 MORTHRev-5 | 26.98 | M3 | 10,000 ₹2,69,800 Lowest | 10,500 ₹2,83,290 |
| 4.00 | Providing and laying Bituminous Concrete to 30mm thick using 0.13cum of 19.00- 9.50mm, 0.17cum of 9.50 -2.36mm and 0.26 cum of 2.36mm & below and with 50.30 kgs of VG30/ VG 40 bitumen for premixing per 10sqm including cost and conveyance of all meterials to CMP site , heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity , conveying the mix by tipper trucks to work site , spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tone vibratory / pneumatic roller to the required density etc ., including labour for attending to paver ay site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler , tipper trucks , paver Finisher ,/9 m paver finisher, vibratory / pneumatic rollers and all other tools and plant reauired , including fuel and all other incidental charges etc ., complete and per specification using CMP as per clause 507 MORTHRev-5 | 16.19 | M3 | 10,800 ₹1,74,852 Lowest | 11,000 ₹1,78,090 |
Tender Value
₹6 L
EMD Value
₹6,000
Closing Date
3 Jul 2026, 3:00 pmClosed
COMMISSIONER
Karamadai municipality
TURIP - 2025-2026 Improvement to BT roads at Kondasamy Naidu Nagar 5th Cross road 167016R710 in Karamadai Municipality
2026_MAWS_683209_1
966/2025/E1
Open Tender
Civil Works - Roads
Works
KARAMADAI MUNICIPALITY
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹6,000
Yes
12 Aug 2026
29 Jun 2026
3 Jul 2026
29 Jun 2026
3 Jul 2026
29 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Advance Patch work 13.20mm Providing Advancve Patch work using 50mm consolidated Thickness by using 1 m3 of 13.20mm IRC Metal with 44kg of Bittumen per 1 m3 of Metal For Pre Mixing For existing surface advance Patch work including cost and conveyance of materials to the work site and stacking them to the departmental metric guage for the premeasurement, heating the bitumen in bitumen boiler, heating the aggregates and mixing them with bitumen in mini hot mix plant for premix carpet only rolling by 60-70KN power roller for premix carpet and seal coat seperately including labour charges for spreading the mix for premix carpet application of bitumen for seal coat over premix carpet, including labour charges for spreading seal coat seperately over premix carpet etc. including higher charges and fuel charges for , bitumen boiler and all other tools and plant employed etc. complete as per of MoRTH Rev - V Specifications | 5.94 | M3 | 1.25 | ₹7.43 |
| 2 | Providing and laying tack coat of 2kgs/10 sqm over the BT surface treated with binder using 2 kgs of bituminous Emulsion (RS) for 10square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Specifications | 540 | M2 | 2.25 | ₹1,215 |
| 3 | Providing and laying 50mm consolidated thick Dense Bituminous Macadam using 0.24cum of 26.50- 13.20mm, 0.25cum of 13.20 -2.36mm and 0.23 cum of 2.6mm & below and with 53.20 kgs of VG30/ VG 40 bitumen for premixing per 10sqm including cost and conveyance of all meterials to CMP site , heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity , conveying the mix by tipper trucks to work site , spreading the mix to uniform thickness of 50mm with paver to the specified grades and cross sections and compacted by vibratory / pneumatic roller to the required density etc ., including labour for attending to paver ay site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler , tipper trucks , paver Finisher ,/9 m paver finisher, vibratory / pneumatic rollers and all other tools and plant reauired , including fuel and all other incidental charges etc ., complete and per specification using CMP as per clause 505 MORTHRev-5 | 26.98 | M3 | 3.25 | ₹87.69 |
| 4 | Providing and laying Bituminous Concrete to 30mm thick using 0.13cum of 19.00- 9.50mm, 0.17cum of 9.50 -2.36mm and 0.26 cum of 2.36mm & below and with 50.30 kgs of VG30/ VG 40 bitumen for premixing per 10sqm including cost and conveyance of all meterials to CMP site , heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity , conveying the mix by tipper trucks to work site , spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tone vibratory / pneumatic roller to the required density etc ., including labour for attending to paver ay site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler , tipper trucks , paver Finisher ,/9 m paver finisher, vibratory / pneumatic rollers and all other tools and plant reauired , including fuel and all other incidental charges etc ., complete and per specification using CMP as per clause 507 MORTHRev-5 | 16.19 | M3 | 4.25 | ₹68.81 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.45 MB
BOQ_821270.xls
BOQ • 0.34 MB
corr.pdf
PDF • 0.16 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .