Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹23.2 LAccepted-AOC | 1 | Accepted-AOC Accepted by higher office |
Tender Value
₹22.7 L
EMD Value
₹45,489
Closing Date
29 Jul 2022, 6:00 pmClosed
E.E. Civil, BSNL Civil Division, Aizawl
O/o the EE Civil, New Admn building, Upper Khatla, Aizawl- 796001
Reconstruction or restoration of part portion of compound wall from back side of staff quarters campus at Assam riffle complex, Khatla at AIZAWL (MIZORAM) BA. Collapsed Portion
2022_BSNL_122711_1
04/2022-23/BSNL/CD/AZL
Open Tender
Civil Works - Buildings
Item Rate
120 days
BSNL campus, Assam riffle complex, Khatla
Please refer Tender documents.
3 documents required · 3 mandatory
₹590
Account officer (cash), BSNL, Aizawl
₹45,489
3 Nov 2022
18 Jul 2022
2 Aug 2022
18 Jul 2022
29 Jul 2022
18 Jul 2022
Amount
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth. 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50m and lift up to 1.5m,disposed earth to be levelled and neatly dressed.
(a) All kinds of soil
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
1:4:8 (1 cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 20 mm nominal size derived from natural sources)
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :
(a) 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement :
(a) 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
Centering and shuttering including strutting, propping etc and removal of form work for:-
Foundations, footings, bases of columns, etc. for mass concrete
Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.
(a) Thermo-Mechanically Treated bars of grade Fe-500D or more.
Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.
(a) In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works.
P/F on wall face unplasticised rigid PVC rain water pipes confirming to IS: 13592 Type A of single socketed pipes
(a) 110 mm dia
Providing and fixing on wall face unplasticised - PVC moulded fittings/ accessories for unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion.
(a) Coupler -110 mm
Bend 87.5°-110 mm
Plain shoe- 110 mm
Painting with synthetic enamel paint of approved brand and manufacture to give an even shade:
(a) Two or more coats on new work.
Supplying and stacking at site
(a) Good earth
Credit for supplying available stone for random rubble stone masonary at site as on where basis including transporting from site etc complete as per direction of Engineer in charge. (Negative value to be considered)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .