| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹31.7 LAccepted-AOC 17 KARAMCHARY COLONY UIT ROAD SRI GANGANAGAR RAJASTHAN 335001 | GANGANAGAR | RAJASTHAN | 335001 | ₹31.7 L | L1 | Accepted-AOC LOWEST |
| 2 | L2₹32.1 L+₹40,706 (1.28%)Rejected-AOC | ₹32.1 L+₹40,706 (1.28%) | L2 | Rejected-AOC OTHER THAN LOWEST |
| 3 | L3₹35.9 L+₹4.2 L (13.2%)Rejected-AOC 411 STREET NO 4 PANCHVATI NAGAR BATHINDA 151001 | BATHINDA | PUNJAB | 151001 | ₹35.9 L+₹4.2 L (13.2%) | L3 | Rejected-AOC OTHER THAN LOWEST |
| Sl No | Description | Qty | Unit | TANUJ SAINI CONTRACTOR L2 | M/s Super Trading Corporation L3 | JK ENGINEERS L1 |
|---|---|---|---|---|---|---|
| 1.00 | Taking down Cement plaster or cement lime plaster on brick or stone walls including raking out joints, hacking for key & scrubbing down with water etc complete all as specified and directed by Engineer-in-Charge. | 400 | SQUARE METRE | 10 ₹4,000 Lowest | 39.6 ₹15,840 | 30 ₹12,000 |
| 2.00 | Demolition of cement concrete (reinforced) (reinforcement cut as required to facilitate demolition) of any description and in any position not other wise specifically provided complete all as specified and directed by Engineer-in-Charge. | 1 | CUBIC METRE | 100 ₹100 Lowest | 810 ₹810 | 500 ₹500 |
| 3.00 | Dismantling floor, hearth or wall tiling including cement mortar bedding (but not backing), and rubbish off the premises complete all as specified and directed by Engineer-in-Charge. | 205 | SQUARE METRE | 15 ₹3,075 Lowest | 39.6 ₹8,118 | 20 ₹4,100 |
| 4.00 | Taking down chowkhats or frames n.exc 1.5 sqm each (without taking off shutter from the frame) and removing from the site including dismantling brick work of hold fasts complete all as specified and directed by Engineer-in-Charge. | 22 | EACH | 75 ₹1,650 Lowest | 180 ₹3,960 | 100 ₹2,200 |
| 5.00 | Taking down chowkhats or frames exc 1.5 sqm but n.exc 4 sqm each (without taking off shutter from the frame) and removing from the site including dismantling brick work of hold fasts etc complete all as specified and directed by Engineer-in-Charge. | 17 | EACH | 100 ₹1,700 Lowest | 225 ₹3,825 | 120 ₹2,040 |
| 6.00 | Taking down shutters of any description exc 1 sqm each but not exc 2 sqm each and removing from the site complete all as specified and directed by Engineer-in-Charge. | 24 | EACH LEAF | 70 ₹1,680 Lowest | 81 ₹1,944 | 80 ₹1,920 |
| 7.00 | Taking down aluminium shutter exc 2 sqm each and removing from the site complete all as specified and directed by Engineer-in-Charge. | 6 | EACH LEAF | 100 ₹600 Lowest | 180 ₹1,080 | 100 ₹600 Lowest |
| 8.00 | Resecuring or easing & adjusting with/ without taking down aluminium door/window shutter such as tightening/provn of fasterners, hinges, rubber gasket, beading and clips etc complete all as specified. | 15 | EACH | 200 ₹3,000 | 900 ₹13,500 | 150 ₹2,250 Lowest |
| 9.00 | Dismantling Stone slabs and tiles of any description or thickness in floors, aprons etc, removing rubbish off the premises complete all as specified and directed by Engineer-in-Charge. | 9.5 | 10 SQUARE METRE | 150 ₹1,425 Lowest | 360 ₹3,420 | 200 ₹1,900 |
| 10.00 | Dismantling of cast iron pipe/ PVC drain pipes/PVC (SWR) pipe etc, 110mm jointed in cement mortar and taking out of trenches and wall, if required complete all as specified and directed. | 100 | RUNNING METRE | 10 ₹1,000 Lowest | 27 ₹2,700 | 20 ₹2,000 |
Tender Value
₹30 L
EMD Value
₹60,000
Closing Date
2 Jul 2026, 6:00 pmClosed
GE CHANDIGARH
GE CHANDIGARH, N Area, PIN-160003
COMPREHENSIVE B/ R AMD E/M REPAIR TO CERTAIN OTM ACCN AND ASSOCIATED WORKS AT N AREA UNDER GE CHANDIGARH
2026_MES_772133_1
GE/CHD/T-14/2026-27
Open Tender
Civil Works
Item Rate
270 days
CHANDIGARH
Class D category a(i) for contractor enlisted in MES
8 documents required · 8 mandatory
₹500
GE CHANDIGARH
₹60,000
Yes
29 Aug 2026
13 Jun 2026
4 Jul 2026
13 Jun 2026
2 Jul 2026
27 Jun 2026
13 Jun 2026 - 20 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Taking down Cement plaster or cement lime plaster on brick or stone walls including raking out joints, hacking for key & scrubbing down with water etc complete all as specified and directed by Engineer-in-Charge. | 400 | SQUARE METRE | 75 | ₹30,000 |
| 2 | Demolition of cement concrete (reinforced) (reinforcement cut as required to facilitate demolition) of any description and in any position not other wise specifically provided complete all as specified and directed by Engineer-in-Charge. | 1 | CUBIC METRE | 75 | ₹75 |
| 3 | Dismantling floor, hearth or wall tiling including cement mortar bedding (but not backing), and rubbish off the premises complete all as specified and directed by Engineer-in-Charge. | 205 | SQUARE METRE | 76 | ₹15,580 |
| 4 | Taking down chowkhats or frames n.exc 1.5 sqm each (without taking off shutter from the frame) and removing from the site including dismantling brick work of hold fasts complete all as specified and directed by Engineer-in-Charge. | 22 | EACH | 76 | ₹1,672 |
| 5 | Taking down chowkhats or frames exc 1.5 sqm but n.exc 4 sqm each (without taking off shutter from the frame) and removing from the site including dismantling brick work of hold fasts etc complete all as specified and directed by Engineer-in-Charge. | 17 | EACH | 76 | ₹1,292 |
| 6 | Taking down shutters of any description exc 1 sqm each but not exc 2 sqm each and removing from the site complete all as specified and directed by Engineer-in-Charge. | 24 | EACH LEAF | 79 | ₹1,896 |
| 7 | Taking down aluminium shutter exc 2 sqm each and removing from the site complete all as specified and directed by Engineer-in-Charge. | 6 | EACH LEAF | 81 | ₹486 |
| 8 | Resecuring or easing & adjusting with/ without taking down aluminium door/window shutter such as tightening/provn of fasterners, hinges, rubber gasket, beading and clips etc complete all as specified. | 15 | EACH | 83 | ₹1,245 |
| 9 | Dismantling Stone slabs and tiles of any description or thickness in floors, aprons etc, removing rubbish off the premises complete all as specified and directed by Engineer-in-Charge. | 9.5 | 10 SQUARE METRE | 79 | ₹750.5 |
| 10 | Dismantling of cast iron pipe/ PVC drain pipes/PVC (SWR) pipe etc, 110mm jointed in cement mortar and taking out of trenches and wall, if required complete all as specified and directed. | 100 | RUNNING METRE | 81 | ₹8,100 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.37 MB
BOQ_864590.xls
BOQ • 1.47 MB
14Tender.pdf
Tender Documents • 2.46 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .