| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.0 LAccepted-AOC | L1 | Accepted-AOC Being Lowest Bidder has considered competitive and reasonable | |
| 2 | L2₹17.6 L+₹2.6 L (17.5%)Rejected-AOC | L2 | Rejected-AOC Not Lowest | |
| 3 | L3₹20.6 L+₹5.6 L (37.6%)Rejected-AOC | L3 | Rejected-AOC Not Lowest | |
| 4 | L4₹22.5 L+₹7.5 L (49.9%)Rejected-AOC | L4 | Rejected-AOC Not Lowest | |
| 5 | L5₹22.5 L+₹7.5 L (50.4%)Rejected-AOC | L5 | Rejected-AOC Not Lowest |
Tender Value
₹31 L
EMD Value
₹62,000
Closing Date
20 Aug 2022, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
CWE AF BAMRAULI
HQ CWE AF BAMRAULI ALLAHABAD-211012
REPAIR / MAINT OFRIGID PAVEMENT JOINT FILLING AND REPAIR TO DRAIN COVERS, EPOXY FILLING AND CERTAIN OTHER WORKS AT AF STATION BAMRAULI
2022_MES_536102_1
87199/C/E8
Open Tender
Civil Works
Item Rate
182 days
Bamrauli
Please refer Tender documents.
9 documents required · 9 mandatory
₹500
GE (AF) Bamrauli
₹62,000
Yes
14 Oct 2022
8 Jul 2022
27 Aug 2022
8 Jul 2022
20 Aug 2022
6 Aug 2022
60 days
Amount
Material and Labour for obtaining approved earth ( stabilized soil) from out side defence land to a distance as per requirement and bring out to site and deposited for forming embankment/ filling berms including spreading in layers not exceeding 30 centimetre thick, levelled and ramming with 8 to 10 tonne mechanical roller including watering complete all as specified and directed. Note :- (i) To arrive finished quantity for payment purpose consolidation thickness shall be measured. (ii) Earth shall be free from foreign material, ie, grass, roots etc. (iii) The consolidation shall be done by heavy mechanical machinery of capacity exceeding 3 tonne. (iv) The specified standard proctor density under optimum moisture conditions shall be obtained and 5% deduction for bulkage shall be made.
Material and Labour for preparing of existing construction / contraction / dummy joints including removing filled material in joints of runway by removing the cracking out joints 10 to 12 mm wide and 27 mm deep including removing all loose material and cleaning the joints with brush and removing all loose fine particles with compressed air and providing a suitable dia polyurethane back up rod/debonding strip and top 15 mm primed and sealed with using polyurethane based sealing compound with suitable primer as per manufacturers recommendation polyurethane sealent complying with BS-5212 & BS -4254 and EN 141875 -2003 ( for hydrolysis / water resistance test ) priming the sides with minimum MAF± 30 % (with ten years performance guarantee ) and applying masking tape on edges of joint to prevent accidental spillage of sealent and removing the masking tape after sealent is applied complete all as specified and directed. Note :- Material obtained from removing of existing filled up materials shall be removed from out side MOD land.
Material and Labour for preparing of existing expansion joint including removing filled material in joints of runway by removing the cracking out joints 20 to 25 mm wide and 38 mm deep including removing all loose material and cleaning the joints with brush and removing all loose fine particles with compressed air primed and providing a suitable dia polyurethane back up rod/debonding strip and top 13 mm primed and sealed with using polyurethane based sealing compound with suitable primer as per manufacturers recommendation polyurethane sealent complying with BS-5212 & BS -4254 and EN 141875 -2003 ( for hydrolysis / water resistance test ) priming the sides with minimum MAF± 30 % (with ten years performance guarantee ) and applying masking tape on edges of joint to prevent accidental spillage of sealent and removing the masking tape after sealent is applied complete all as specified and directed. Note :- Material obtained from removing of existing filled up materials shall be removed from out side MOD land.
Material and Labour for preparing old black bituminous surface by fibre for removing all loose dust/dirt particle etc sweeping the surface with brooms and finally the cleaned surface with gunny bags to remove all loose particle / dust etc and applying evenly a coat of cold bituminous emulsion @ 5 Kg per 10 Square metres by brushing to an uniform and fully blinded surfaces complete all as specified and directed. Note:- (i) Cold bituminous emulsion shall be slow setting emulsion (SS-1) (IS:8887) and shall be procured directly from the manufacturer's only and brought at site in sealed drum/container of 200 litres. (ii) Empty drum shall be property of the department/MES and the same shall be removed from site from time to time and deposited at store yard of MES.
Material and labour 25 mm thick insulating glass (consisting of two parallel 6 mm thick toughened glass panes and 13 mm thick an aluminimum spacer tube (size and shape as required at site) for fixing to ATC Tower, jointed at each corner and filled with a specially designed absorbent and properly sealed . The unit is surrounded with sealing flexible sealent complete all as specified and as per manufacturer instructions. Note :- 1. Unit rate quoted is inclusive of :- (a) taking out existing glass and prepration of existing surface to receive 25 mm thick wooden beading of Ist class hard wood and matching with existing surface. (b) Ist class hard wood beading including two coats of French polish on wooden surface. (c) Taking out existing glass and depositing to MES store yard of GE (AF) Bamrauli. Necessary Receipt Voucher duly audited shall be obtained. 2. Make of glass shall be Saint gobain / Modi Guard / Hindustan
Supply and fix in repairs Solar control film 50 micron reflective type sticked to glass panels as per manufacturer’s instructions complete all as specified and directed.
Material and labour for cleaning of cracks of depth 40 mm and width 30 mm in bitumeneous surfaces with mechanical blower and applying bitumen based hardner primer and filling with bitumen crack filler of joint sealer bitumeneous grouting material complete all as specified and directed. Note :- (i) Work shall be carried out by authorised applicator of firm. (ii) The warranty of material shall be three years from the date of completion of work.
Material and labour for cleaning of cracks of depth 50 mm and width 30 mm in bitumeneous surfaces with mechanical blower and applying bitumen based hardner primer and filling with bitumen crack filler of joint sealer bitumeneous grouting material complete all as specified and directed. Note :- (i) Work shall be carried out by authorised applicator of firm. (ii) The warranty of material shall be three years from the date of completion of work.
Material and labour for cleaning of cracks of depth 20 mm and width 15 mm in bitumeneous surfaces with mechanical blower and applying bitumen based hardner primer and filling with bitumen crack filler of joint sealer bitumeneous grouting material complete all as specified and directed. Note :- (i) Work shall be carried out by authorised applicator of firm. (ii) The warranty of material shall be three years from the date of completion of work.
Finishing the surface of concrete in pavement/hard standing by belting and brooming complete all as specified and directed.
Material and labour cement concrete in pavement / hard standing of flexural strength 40 Kg / per square centimetre in field using minimum 400 Kgs of cement per cubic metre of concrete slab not exceeding 25 centimetre thick , laying pavement concrete / Hard standing in bays between joints including necessary form work complete all as specified and directed by Garrison Engineer / Engr-in-Charge. Note :- (i) Work shall be executed as per design mix as approved by GE. (ii) The content of cement as specified is minimum. Any variation in content of cement during design mix at site on plus side shall be borne by the contractor without any extra cost to the Government.
Material and Labour for repair to broken/damage portion of concrete slab or pavement by cutting damaged portion to slab/spoil edges to triangular / rectangular cross section with mechanical cutter and removing all loose and foreign materials and depositing the same to out side MOD land and cleaning the surface by compressed air to remove all dust dirt etc and washing with hydrochloric acid and filling with epoxy resin mortar after application of epoxy primer as per manufacture instructions bull nosing the edges complete all as specified and directed. Note :- (i) Material obtained from damaged portion of concrete slab shall be removed from out side MOD land. (ii) Working hours may be restricted due to flying operations. (iii) Unit quoted rate shall be deemed to included the cost of power supply required for cutting of damaged portion of concrete slab of runway.
Demolition of cement concrete (unreinforced) of any description and in any position not otherwise specifically provided for and removing rubbish out site MOD land complete all as specified and directed by Garrison Engineer/ Engr-in-Charge.
M/S KESHRI WORKERS
gangotri enteriprises
M/S Shivam Industries
M/s Engineer
M/S Aquarius Construction
R.K.ASSOCIATES
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .