| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹35.5 LAdmitted-Finance | -9.70% | ₹35.5 L | L1 | Admitted-Finance |
| 2 | L2₹37.3 L+₹1.8 L (5.20%)Admitted-Finance | -5.00% | ₹37.3 L+₹1.8 L (5.20%) | L2 | Admitted-Finance |
| 3 | L3₹39.7 L+₹4.2 L (11.8%)Admitted-Finance ADD 627 BAKSHI KHURD DARAGANJ TEHSIL SADAR PRAYAGRAJ | PRAYAGRAJ | PRAYAGRAJ | UTTAR PRADESH | +1.00% | ₹39.7 L+₹4.2 L (11.8%) | L3 | Admitted-Finance |
Tender Value
₹39.3 L
EMD Value
₹79,000
Closing Date
14 Aug 2026, 3:00 pmClosed
Office EE CD LKO 13 UPAVP, Lucknow
Office EE CD LKO 13 UPAVP, Lucknow
Interlocking and Drain Work From New Culvert to Maa Banki Devi Temple between Ward 3 Adarsh Nagar and Shrikrishnapuram Shekhpur Unnao and Interlocking and Drain Work From Suresh Rawat Home to Mahesh Dhanuk Home Ward 3 Adarsh Nagar Unnao
2026_UPHDB_1173874_1
1169/W-13/117 dt. 28.07.2026
Open Tender
Civil Works
Percentage
120 days
Distt. Unnao
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,770
Office EE CD LKO 13, UPAVP, Lucknow
₹79,000
23 Sept 2026
31 Jul 2026
14 Aug 2026
31 Jul 2026
14 Aug 2026
31 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Road Work
Taking out existing CC interlocking paver blocks from footpath/ central verge, including removal of rubbish etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge. | 1,430 | SQM | 97.74 | ₹1,39,768.2 |
| - | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge. All Kind of Soil | 164.45 | CUM | 131.68 | ₹21,654.78 |
| - | Providing and laying spreading and compacting graded stone agreegatge to wet mix macadam specification including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site laying in uniform layer in sub-base course on well prepared surface and compaction with vibratory roller to achieve the desired density (MORT&H) SPECIFICATION NO 406 | 164.45 | CUM | 4,769 | ₹7,84,262.05 |
| - | Providing and laying factory made chamfered edge Cement Concrete paver blocks in footpath, parks, lawns, drive ways or light traffic parking etc, of required strength, thickness & size/ shape, made by table vibratory method using PU mould, laid in required colour & pattern over 50 mm thick compacted bed of sand, compacting and proper embedding/laying of inter locking paver blocks into the sand bedding layer through vibratory compaction by using plate vibrator, filling the joints with sand and cutting of paver blocks as per required size and pattern, finishing and sweeping extra sand. complete all as per direction of Engineer-in-Charge. 80 mm thick C.C. paver block of M-35 grade with approved
colour design and pattern. | 1,430 | CUM | 809.75 | ₹11,57,942.5 |
| - | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved. 95% of Item No 2 | 156.23 | CUM | 195.82 | ₹30,592.96 |
| - | Drain
Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge. All Kind of Soil | 254.83 | CUM | 131.68 | ₹33,556.01 |
| - | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering -1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources): All work up to plinth level | - | CUM | - | - |
| - | First Class brick work in 1:6 cement and Coarse sand mortar in foundation and plinth including supply of all materials, labour and T&P etc. required for proper completion of the work. | - | CUM | - | - |
| - | 12 mm thick plaster with cement mortar in proportion of 1:6 cement & fine sand. | - | SQM | - | - |
| - | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting,
unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved. 95% of Item No 6 | - | CUM | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.85 MB
TenderDocument.pdf
Tender Documents • 10.47 MB
BOQ_2205062.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .