| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹25.3 LAccepted-AOC | L1 | Accepted-AOC BEING L1 | |
| 2 | L2₹27.0 L+₹1.6 L (6.25%)Rejected-AOC | L2 | Rejected-AOC NOT BEING L1 | |
| 3 | L3₹28.6 L+₹3.2 L (12.6%)Rejected-AOC FLAT NO 20 AMBEDKAR ROAD DEHU ROAD PUNE 412101 D 101 CESC INDEX NO D 101 HQ CESC PUNE | NA | NA | 412101 | L3 | Rejected-AOC NOT BEING L1 |
| Sl No | Description | Qty | Unit | Santhi Enterprises L3 | A V S Builders L1 | M/s.TIRUPATI BUILDERS L2 |
|---|---|---|---|---|---|---|
| 1.00 | Cleaning of vegetation as in weeds , shrubs , grass of height upto 2.5 Mts complete to the satisfaction of Engineer-in-charge including removal of entire removed vegetation & grass outside MoD land and depositing where directed. | 100 | Square Metre | 50 ₹5,000 Lowest | 60 ₹6,000 | 100 ₹10,000 |
| 2.00 | Demolition of brickwork , block masonry or stone/boulder masonry, built in cement mortar including all quoins, arches, pillars, etc and removal of debris as ordered outside MD land complete all as directed. | 0.4 | Cubic Metre | 300 ₹120 | 250 ₹100 Lowest | 500 ₹200 |
| 3.00 | Taking down chowkats or frames exceeding 1.5 Sqm but not exceeding 4 Sqm each with shutters (without taking off shutters from frame) and stacking at site for credit & removal where directed. | 2 | Each | 150 ₹300 | 130 ₹260 Lowest | 150 ₹300 |
| 4.00 | Taking down shutter of any description n.exc 1Sqm each and stacking at site where directed. | 10 | Per Leaf | 25 ₹250 Lowest | 50 ₹500 | 75 ₹750 |
| 5.00 | Dismantling of wrought iron or mild steel work of any description not otherwise provided for in this Schedule all as directed. | 3.15 | Quintal | 250 ₹787.5 Lowest | 500 ₹1,575 | 500 ₹1,575 |
| 6.00 | Surface excavation averaging 15cm deep and n.exc 30cm deep and getting out in soft/loose soil complete all as specified and directed | 54.17 | Square Metre | 60 ₹3,250.2 | 45 ₹2,437.65 Lowest | 50 ₹2,708.5 |
| 7.00 | Excavation over areas not exc 1.5m deep and getting out in soft/loose soil complete all as specified and as directed. | 97.35 | Cubic Metre | 300 ₹29,205 | 201 ₹19,567.35 | 200 ₹19,470 Lowest |
| 8.00 | Excavation in trenches and not exe. 1.5 m wide and not exe. 1.5 m in depth for foundation of drain, man hole , laying of UG cables etc. not exe. 10 Sq. m on plan and not exe. 1.5 m depth and getting out in soft/loose soil complete all as specified and directed. | 7.49 | Cubic Metre | 320 ₹2,396.8 | 215 ₹1,610.35 Lowest | 250 ₹1,872.5 |
| 9.00 | Excavating in post holes (or similar holes) each not exc 0.50 cum, getting out, returning, filling in and ramming earth or broken rubble mixed with earth around, in layers not exc 25cm, watering, and removing surplus soil to a distance not exc 50 m and making good surface in soft/ loose soil. | 25 | Each | 120 ₹3,000 Lowest | 165 ₹4,125 | 150 ₹3,750 |
| 10.00 | Returning filling in trenches including spreading, leveling, watering and well ramming in layers not exceeding 25 cm thick in soft / loose complete all as specified and directed | 3.5 | Cubic Metre | 50 ₹175 | 40 ₹140 Lowest | 60 ₹210 |
Tender Value
₹26.7 L
EMD Value
₹53,400
Closing Date
6 Jun 2026, 6:00 pmClosed
GE AF OJHAR
GE AF OJHAR AIR FORCE STN OJHAR DIST NASHIK PIN 422221
SPECIAL REPAIRS OF SMALL ARMS RANGE UNDER GE AF OJHAR
2026_MES_765993_1
8397/E8
Open Tender
Civil Works - Others
Item Rate
120 days
GE AF OJHAR
As per Tender documents
8 documents required · 8 mandatory
₹500
GE AF Ojhar
₹53,400
Yes
20 Aug 2026
18 May 2026
8 Jun 2026
18 May 2026
6 Jun 2026
1 Jun 2026
18 May 2026 - 31 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cleaning of vegetation as in weeds , shrubs , grass of height upto 2.5 Mts complete to the satisfaction of Engineer-in-charge including removal of entire removed vegetation & grass outside MoD land and depositing where directed. | 100 | Square Metre | - | - |
| 2 | Demolition of brickwork , block masonry or stone/boulder masonry, built in cement mortar including all quoins, arches, pillars, etc and removal of debris as ordered outside MD land complete all as directed. | 0.4 | Cubic Metre | - | - |
| 3 | Taking down chowkats or frames exceeding 1.5 Sqm but not exceeding 4 Sqm each with shutters (without taking off shutters from frame) and stacking at site for credit & removal where directed. | 2 | Each | - | - |
| 4 | Taking down shutter of any description n.exc 1Sqm each and stacking at site where directed. | 10 | Per Leaf | - | - |
| 5 | Dismantling of wrought iron or mild steel work of any description not otherwise provided for in this Schedule all as directed. | 3.15 | Quintal | - | - |
| 6 | Surface excavation averaging 15cm deep and n.exc 30cm deep and getting out in soft/loose soil complete all as specified and directed | 54.17 | Square Metre | - | - |
| 7 | Excavation over areas not exc 1.5m deep and getting out in soft/loose soil complete all as specified and as directed. | 97.35 | Cubic Metre | - | - |
| 8 | Excavation in trenches and not exe. 1.5 m wide and not exe. 1.5 m in depth for foundation of drain, man hole , laying of UG cables etc. not exe. 10 Sq. m on plan and not exe. 1.5 m depth and getting out in soft/loose soil complete all as specified and directed. | 7.49 | Cubic Metre | - | - |
| 9 | Excavating in post holes (or similar holes) each not exc 0.50 cum, getting out, returning, filling in and ramming earth or broken rubble mixed with earth around, in layers not exc 25cm, watering, and removing surplus soil to a distance not exc 50 m and making good surface in soft/ loose soil. | 25 | Each | - | - |
| 10 | Returning filling in trenches including spreading, leveling, watering and well ramming in layers not exceeding 25 cm thick in soft / loose complete all as specified and directed | 3.5 | Cubic Metre | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.29 MB
TENDER397.pdf
Tender Documents • 1.03 MB
BOQ_857869.xls
BOQ • 0.86 MB
TENDERCORRIGENDUM8397.pdf
PDF • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .