Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.2 LAccepted-AOC | ₹4.2 L | L1 | Accepted-AOC ACCEPTED |
| 2 | l2₹4.3 L+₹10,593.20 (2.50%)Rejected-AOC AT BARIMAL PO HATIBARI PS SUKINDA DIST JAJPUR PIN 755018 | JAJAPUR | ODISHA | 755018 | ₹4.3 L+₹10,593.20 (2.50%) | l2 | Rejected-AOC REJECTED |
Tender Value
₹4.3 L
EMD Value
₹4,267
Closing Date
9 Mar 2026, 5:00 pmClosed
EXECUTIVE OFFICER RANPUR
EXECUTIVE OFFICER RANPUR
CONSTRUCTION OF SAIBABA COMMUNITY CENTER IN WN-12 N OF RANPUR NAC
2026_ORULB_126536_7
RNP NAC -07/2025-26
Open Tender
Civil Works - Others
Percentage
90 days
NAC RANPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,000
₹4,267
Yes
2 Jul 2026
28 Feb 2026
10 Mar 2026
28 Feb 2026
9 Mar 2026
28 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork excavation in foundation in hard soil including rough dressing and levelling the bed by depositing soil within initial lead and lift . | - | Cum | 1 | - |
| 2 | Supplying and filling Sand in foundation and on Road Surface including watering and ramming with Cost, Conveyance and Royalty of all materials etc. allcomplete. | 28.73 | Cum | 668.2 | ₹19,197.39 |
| 3 | Cement Concrete in (1:3:6) using 40mm size Hard Granite C.B. metal in foundation Bed and Road including watering, curring with Cost, Conveyance and Royalty of all materials etc. allcomplete . | 4.46 | Cum | 6,233.9 | ₹27,803.19 |
| 4 | Brick Work with Fly ash bricks 25cm X 12cm X 8cm size having crushing strength not less than 75kg/cm2 with dimensional tolerance +2 percent in cement mortar (1:6) in Foundation and Plinth including watering curing, Cost, Labour, T & P etc. complete as per the direction of E.I.C. | 27.56 | Cum | 5,663.2 | ₹1,56,077.79 |
| 5 | R.C.C. M-20 grade with 20mm and down grade C.B. chips of approved quality from approved quarry including hoisting laying hire charges of concrete misture,vibrator watering curing and cost of all materials and labour T&P centering shuttering etc complete but excluding cost of reinforcement complete.
Column footing | 4.53 | Cum | 6,741.4 | ₹30,538.54 |
| 6 | Plinth Band | 2.55 | Cum | 7,611.7 | ₹19,409.84 |
| 7 | Column & Beam | - | Cum | 18,404.6 | - |
| 8 | Supplying, Fitting and Fixing of HYSD bar Reinforcement as per drawing and technical specification including cost and convayance of all materials with labour T & P etc. all complete as per direction of EIC. | 1 | Qtl | 1 | ₹1 |
| 9 | Supplying and Fixing a Display signboard at site made of M.S. plate and angles with writing details about the Project as per direction of Engineer-in-Charge | - | NO | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.42 MB
BOQ_583451.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .