Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.6 CrAdmitted-Finance 301 ASHIRVAD PARAS OPP PRAHLADNAGAR GARDEN SATELLITE AHMEDABAD GUJARAT 380015 | AHMADABAD | GUJARAT | 380015 | ₹3.6 Cr | L1 | Admitted-Finance |
| 2 | L2₹3.6 Cr+₹2.7 L (0.76%)Admitted-Finance | ₹3.6 Cr+₹2.7 L (0.76%) | L2 | Admitted-Finance |
| 3 | Rejected-Technical 1 8 373 FLAT NO 704 KRISHE GARDEN BEGUMPET BEGUMPET HYDERABAD TELANGANA 500016 | MEDCHAL MALKAJGIRI | TELANGANA | 500016 | - | - | Rejected-Technical Documents are not found in Order. Physical EMD not submitted by the bidder. |
| Sl No | Description | Qty | Unit | SAHAJ SOLAR LIMITED L1 | Solarium Green Energy Private Limited L2 |
|---|---|---|---|---|---|
| 1.00 | Providing, installation, testing and commissioning of off-grid ( with the provision to charge from main power source) Solar Photovoltaic Power Plant conforming to MNRE specifications as amended, consisting of Mono Crystalline silicon solar cells, necessary protections, earthing, mounted on RCC structure of suitable strength with following components complete as required as per Appdx “A” The rates quoted should be inclusive of all taxes, transportation charges , loading/unloading at site etc as required
a) Solar Photovoltaic Module of capacity 350 Wp or above, manufactured in India, conforming to IS 14286/IEC 61215, IEC 61730- Part-1, IEC 61730-Part-2. Solar Photovoltaic Module conversion efficiency shall not be less than 16.5%. PV modules used in solar power plants/ systems must be warranted for their output peak watt capacity, which should not be less than 90% at the end of 10 years and 80% at the end of 25 years.
b) Hybrid Power Conditioning Unit (PCU) of 350-800 V DC Input voltage range and 400 V AC, three phase, 4 wire, 50Hz +/- 2.5 Hz, output voltage suitable to generate AC Power with efficiency not less than 97%, total harmonic distortion less than 3% and suitable for ambient temperature from 0 to 50 degree C.
c) Data Monitoring System complete with accessories.
d) Fixing of Array junction box & Main junction box with IP 65 protection and termination arrangement for incoming and outgoing cable along with glands, lugs and other accessories etc. as required.
e) Lightning and surge voltage protection.
f) Connections & Interconnections by supplying & fixing required size XLPE insulated copper conductor 1.1 kV grade armoured power and control cables between solar modules, main power cable to grid supply PCU unit along with supplying & fixing of necessary channel/conduit lugs and other accessories etc. as required.
g) Battery bank of required capacity of solar plant, VRLA 2 volts 750/800 AH - 120 no’s batteries. (Total battery bank capacity 1,80,000/- VAH) / Full load battery backup must be up to 06 hrs as per MNRE standards, along-with battery rack and interconnections.
h) Cost for construction of RCC structure as required for Battery bank / Control room shall be of size 150 sq. feet (minimum), with head room of minimum 2.9 meters & plinth height shall be minimum 1.8 meter (minimum) from natural ground level as per drawing to be approved by Engineer-in-charge. The flooring should be of RCC (must withstand the load of batteries and other equipment). Steel gate, window-02 nos (minimum) , opening for exhaust must be installed in control room. Roof of control room must be so designed to prevent water lodging and providing approach path of cement concrete from battery room to solar panels (120 sq MTR) of 40 MTR etc. complete as per Scope of Work & Technical Specifications. | 10 | Set | 35,71,170 ₹3,57,11,700 Lowest | 35,98,450 ₹3,59,84,500 |
Tender Value
₹3.5 Cr
EMD Value
₹7.0 L
Closing Date
14 Nov 2024, 12:00 pmClosed
SE/Comdtt electrical
FHQ BSF New delhi
Providing installation testing and commissioning of 25 KWp off grid solar power plant at 10 BOPs of 44 Bn 46 Bn Now 195 Bn and 171 Bn BSF of SHQ Sunderbani under FTR HQ Jammu
2024_BSF_832487_1
01/SE(Elect)/NIT/FTR JAMMU /ENGG/2024-25
Open Tender
Electrical Works
EPC Contract
365 days
In Border area of Sunderbani Sector
As per NIT
13 documents required · 13 mandatory
₹0
₹7.0 L
SHQ BSF Sunderbani
17 Dec 2024
25 Oct 2024
18 Nov 2024
25 Oct 2024
14 Nov 2024
25 Oct 2024
8 Nov 2024
Amount
Providing, installation, testing and commissioning of off-grid ( with the provision to charge from main power source) Solar Photovoltaic Power Plant conforming to MNRE specifications as amended, consisting of Mono Crystalline silicon solar cells, necessary protections, earthing, mounted on RCC structure of suitable strength with following components complete as required as per Appdx “A” The rates quoted should be inclusive of all taxes, transportation charges , loading/unloading at site etc as required a) Solar Photovoltaic Module of capacity 350 Wp or above, manufactured in India, conforming to IS 14286/IEC 61215, IEC 61730- Part-1, IEC 61730-Part-2. Solar Photovoltaic Module conversion efficiency shall not be less than 16.5%. PV modules used in solar power plants/ systems must be warranted for their output peak watt capacity, which should not be less than 90% at the end of 10 years and 80% at the end of 25 years. b) Hybrid Power Conditioning Unit (PCU) of 350-800 V DC Input voltage range and 400 V AC, three phase, 4 wire, 50Hz +/- 2.5 Hz, output voltage suitable to generate AC Power with efficiency not less than 97%, total harmonic distortion less than 3% and suitable for ambient temperature from 0 to 50 degree C. c) Data Monitoring System complete with accessories. d) Fixing of Array junction box & Main junction box with IP 65 protection and termination arrangement for incoming and outgoing cable along with glands, lugs and other accessories etc. as required. e) Lightning and surge voltage protection. f) Connections & Interconnections by supplying & fixing required size XLPE insulated copper conductor 1.1 kV grade armoured power and control cables between solar modules, main power cable to grid supply PCU unit along with supplying & fixing of necessary channel/conduit lugs and other accessories etc. as required. g) Battery bank of required capacity of solar plant, VRLA 2 volts 750/800 AH - 120 no’s batteries. (Total battery bank capacity 1,80,000/- VAH) / Full load battery backup must be up to 06 hrs as per MNRE standards, along-with battery rack and interconnections. h) Cost for construction of RCC structure as required for Battery bank / Control room shall be of size 150 sq. feet (minimum), with head room of minimum 2.9 meters & plinth height shall be minimum 1.8 meter (minimum) from natural ground level as per drawing to be approved by Engineer-in-charge. The flooring should be of RCC (must withstand the load of batteries and other equipment). Steel gate, window-02 nos (minimum) , opening for exhaust must be installed in control room. Roof of control room must be so designed to prevent water lodging and providing approach path of cement concrete from battery room to solar panels (120 sq MTR) of 40 MTR etc. complete as per Scope of Work & Technical Specifications.
Solarium Green Energy Private Limited (BID ID -3120153)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.27 MB
Tendernotice_2.pdf
PDF • 0.67 MB
BOQ_874789.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .