Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.9 CrAccepted-AOC 70 VARDHMAN NAGAR A P O SHYAM NAGAR AJMER ROAD JAIPUR PIN 342019 | JAIPUR | 342019 | ₹2.9 Cr | L1 | Accepted-AOC Being lowest and reasonable |
| 2 | L2₹4.2 CrRejected-Finance | ₹4.2 Cr | L2 | Rejected-Finance Not Being lowest |
| 3 | Rejected-Technical | - | - | Rejected-Technical as the firm does not qualifies the major eligibility criteria of work experience of specific SCADA portion of work as direct bidder itself as system integrator or with MoU |
Tender Value
₹3.5 Cr
EMD Value
₹4.3 L
Closing Date
8 Dec 2022, 6:00 pmClosed
HQ CHIEF ENGINEER BHOPAL ZONE, BHOPAL
HQ CHIEF ENGINEER BHOPAL ZONE, MILITARY ENGINEER SERVICES, SULTANIA INFANTRY LINES, BHOPAL - 462001
ENGINEERING, PROCUREMENT AND CONSTRUCTION OF WATER SUPPLY SYSTEM (SCADA) AT DHANA.
2022_MES_525746_1
CEBZ/DHA/TOKEN/10 OF 2022-23
Open Tender
Information Technology
4070 days
DHANA
As per NIT
8 documents required · 8 mandatory
₹2,000
Yes
AGE(I) DHANA
₹4.3 L
Yes
24 Feb 2023
25 May 2022
10 Dec 2022
25 May 2022
8 Dec 2022
15 Sept 2022
Amount
Note:-(i) Please refer schedule 'A' notes before quoting the tender. (ii) Amount of Schedule of credit shall be deducted off line by the department.
BOQ SCHEDULE 'A' PART - I
Design, developing, integrate and commissioning the SCADA system alongwith various analysing equipment for Water supply system as indicated in the layout diagram as per ANNEXURE I to V of Design Basis Information (DBI) complete all as specified & directed. The SCADA system shall comprise of following :- (a) Master control station with personal computer with latest processor and Monitor of size as specified. (b) UPS with one hour backup (c) Laser Printer (d) Server (e) Data Gateway (f) SCADA software which can be operated, programmed and modified by agencies other than developer.
Operation of SCADA system during defect liability period of 02 (two years) all as specified & directed. NOTE:- (a) Contractor to provide monthwise breakdown details before approval of SCADA system. (b) Maintenance charges in defect liablity period already deemed to be included in the quoted unit rate of BOQ Serial Item No.2.01 here-in-before
BOQ SCHEDULE 'A' PART - II (Operation and comprehensive maintenance of SCADA system including cost of spares for eight years post defect liability period.)
Operation and comprehensive maintenance of SCADA system including cost of spares for 08 (eight years) post defect liability period including payment of bills by telecom service provider complete all as specified & directed. Note. Cumulative payment shall be made (after expiry of DLP) on not exceeding basis as per following schedule: - (i) After 1st year - 12% (ii) After 2nd year - 24% (iii) After 3rd year - 36% (iv) After 4th year - 48% (v) After 5thyear - 60% (vi) After 6st year - 72% (vii) After 7th year - 84% (viii) After 8th year - 100%
CIMCON SOFTWARE INDIA PVT. LTD.
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid